Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Solid Waste Management
Eprocure
Opening Date11 Nov 2024
Closing Date10 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Replacement/servicing of bearing of clinker grinder.

46

-

-

... More
Servicing of bearing housing of clinker grinder.

46

-

-

... More
Replacement/servicing of driven/ driving sprocket. (15/45 teeth)

30

-

-

... More
Servicing of fluid coupling of clinker grinder.

66

-

-

... More
Servicing/overhauling of gear box type sumo ALLROYD/Premium make 30:1 of bottom ash hopper.

50

-

-

... More
Alignment of clinker grinder motor.

50

-

-

... More
Replacement of defective gear box/fluid coupling of clinker grinder.

144

-

-

... More
Fabrication & replacement of overflow tank of BAH.

10

-

-

... More
Servicing /repairing of jetting nozzle body.

130

-

-

... More
Cleaning of jet Pulsion pump to remove chocking.

156

-

-

... More
Servicing/replacement of Jet Pulsion Pump.

50

-

-

... More
Servicing/replacement of pneumatic Power Cylinder for Clinker grinder.

50

-

-

... More
Cleaning of chocking overflow line of BAH.

66

-

-

... More
Cleaning of flushing nozzle of BAH.

70

-

-

... More
Servicing/overhauling of bottom ash hopper feed gate with roller assembly.

40

-

-

... More
Fabrication of feed gate BAH.

20

-

-

... More
Removal of chocking of seal trough.

120

-

-

... More
Refixing/replacement of wire mesh in BAH.

70

-

-

... More
To isolate BAH during shutdown of boiler.

20

-

-

... More
Welding to attend leakage.

1200

-

-

... More
Replacement of Jet Pulson Pump nozzle.

50

-

-

... More
Fabrication & installation of feed sump.

20

-

-

... More
Removal of clinker stuck up/deposited inside the furnace bottom ash hopper by pocking during the running of Unit.

160

-

-

... More
Chocking removal of feed sump.

250

-

-

... More
Removal chocking of bottom ash transport line.

2400

-

-

... More
Turing of MS pipe 8”.

2400

-

-

... More
Replacement of MS pipe 8”.

1500

-

-

... More
To take out foreign material like wire mesh/iron pes./pipes etc. from BAH.

160

-

-

... More
Servicing/cleaning of air converted tank & connected pipe.

50

-

-

... More
Refractory work in BAH.

120

-

-

... More
Replacement of gland packing at any one end of roller of. Clinker grinder.

160

-

-

... More
Replacement of complete Jet Pulsion Pump assembly.

50

-

-

... More
Replacement/adjustment of chain of clinker grinder.

90

-

-

... More
Closing & opening of discharge gate of BAH.

100

-

-

... More
Replacement of eye bolts of access door of BAH.

130

-

-

... More
Replacement of clinker grinder by new or shifting from other Unit and commissioning of the same.

30

-

-

... More
Fabrication & erection of bend 4” to 8”.

180

-

-

... More
Servicing of low pressure line valves

30000

-

-

... More
Replacement of wornout/damaged pipe of following sizes.

-

-

-

... More
a) 1”

180

-

-

... More
b) 2”

300

-

-

... More
c) 3”

300

-

-

... More
d) 4”

300

-

-

... More
e) 6”

300

-

-

... More
f) 8”

300

-

-

... More
Removal of chocking of economizer hopper sluicing tank and all connected pipe line.

180

-

-

... More
Patching of eroded plate by MS plate of 5 mm to 12 mm.

400

-

-

... More
Replacement/alignment/servicing/overhauling of solenoid valve.

100

-

-

... More
Replacement/servicing of nozzle of economizer sluicing tank.

180

-

-

... More
Complete cleaning of economizer hoppers during Shut down of Unit.

100

-

-

... More
Replacement of pocking hole cover of economizer hopper.

60

-

-

... More
Replacement/servicing of Pneumatic Power Cylinder 8” dezurik valve of Botttom Ash discharge pipe line.

180

-

-

... More
Servicing/overhauling/replacement of 8” dezurik valve.

30

-

-

... More
Repairing/replacement of worn out parts of coupling 8” dia of Bottom Ash Disposal Line.

200

-

-

... More
Replacement/servicing of air check valve.

40

-

-

... More
Replacement/servicing of of TRESG valve 10”.

28

-

-

... More
Replacement/servicing of TRESG valve 8”.

70

-

-

... More
Replacement/servicing of Butterfly valve:

-

-

-

... More
a) Size 2 ½”

50

-

-

... More
b) Size 6”

28

-

-

... More
c) Size 8”

50

-

-

... More
d) Size 10”

10

-

-

... More
Replacement/servicing of Power Cylinder:

-

-

-

... More
a) Size 2.5”

180

-

-

... More
b) Size 4”

70

-

-

... More
c) Size 6”

28

-

-

... More
Replacement / servicing of different size valves:

-

-

-

... More
a) Size 4”

40

-

-

... More
b) Size 6”

40

-

-

... More
c) Size 8”

18

-

-

... More
d) Size 10”

30

-

-

... More
e) Size 12”

80

-

-

... More
Replacement of Disc/Seat 1st & 2nd row of ESP Hopper.

140

-

-

... More
Replacement of Disc/Seat 3rd & 6th row & APH Hopper.

100

-

-

... More
Replacement of fluidizing blower “V”- belt.

18

-

-

... More
Servicing of fluidizing blower.

20

-

-

... More
Alignment of fluidizing blower motor.

18

-

-

... More
Poking of ESP, APH hoppers.

6000

-

-

... More
Choking removal &removal foreign material in APH/ESP hopper.

1500

-

-

... More
Replacement of connector/gasket 8”/10”.

300

-

-

... More
Replacement of different size bend:

-

-

-

... More
a) Size 6”

70

-

-

... More
b) Size 8”

70

-

-

... More
c) Size 10”

70

-

-

... More
Replacement of different size lateral 8”/10”.

70

-

-

... More
Patch work by welding in different area of fly ash system up to one squire fit.

300

-

-

... More
Cutting and replacement spool pipe pieces of different size 6’/8’/10’.

180

-

-

... More
Servicing/cleaning of air washer nozzle.

100

-

-

... More
Servicing/cleaning of hydro mixer nozzle.

100

-

-

... More
Removal of chocking vacuum line.

100

-

-

... More
Removal of choking ACT & its connected pipe line.

90

-

-

... More
Reinforcement of ACT cylindrical portion as well as conical portion.

18

-

-

... More
Replacement of tail pipe (adopter).

100

-

-

... More
Replacement of hydro mixer nozzle.

18

-

-

... More
Replacement of air washer nozzle.

18

-

-

... More
Fabrication & erection 12” MS lateral portion in discharge side of ACT tank pipe dia 250 mm to 300 mm.

18

-

-

... More
Replacement/Servicing of vacuum barker system.

40

-

-

... More
Replacement of wear plate of ACT.

40

-

-

... More
Fabrication of wear plate of ACT.

40

-

-

... More
Replacement of MS/CI pipe:

-

-

-

... More
a) Size 4”

300

-

-

... More
b) Size 6”

300

-

-

... More
c) Size 8”

200

-

-

... More
d) Size 10”

180

-

-

... More
Replacement of different hopper discharge W/O adaptor.

70

-

-

... More
Servicing of vacuum pump.

28

-

-

... More
Alignment of motor & vacuum pump with belt replacement if required.

108

-

-

... More
Store handling material from CSD-II to site store.

360

-

-

... More
Fabrication & erection of bend of following size:

-

-

-

... More
a) Size 4”

36

-

-

... More
b) Size 6”

36

-

-

... More
c) Size 8”

90

-

-

... More
d) Size 10”

30

-

-

... More
Replacement of damage bearing of vacuum pump.

24

-

-

... More
Replacement of shaft sleeve of vacuum pump.

50

-

-

... More
Replacement of body of hydro mixer 10”.

28

-

-

... More
Replacement of body fad 12” x 6” mach.

46

-

-

... More
Replacement of hopper 12” x 4.6”.

46

-

-

... More
Replacement of sharp sheet of ash intake valve of 3rd to 6th row.

46

-

-

... More
Replacement of ash intake valve of 1st to 2nd row.

46

-

-

... More
Replacement of ash intake 3rd to 6th row.

46

-

-

... More
Alignment of misaligned disposal line fitting 8”/10”.

360

-

-

... More
Replacement/alignment of solenoid valve of 2.5”/4”/6” power cylinder.

420

-

-

... More
Repairing of tail pipe by patch welding.

240

-

-

... More
Repairing of C.I. bends and lateral size 8”/10”.

250

-

-

... More
Servicing/repair/overhauling of solenoid valve of 2.5” power cylinder.

178

-

-

... More
Servicing/repair/overhauling of solenoid valve of 4”/6” power cylinder.

150

-

-

... More
Replacement of MS Plate of economizer hopper and air preheater hoppers plateforms with 10 mn to 16 mm thick

70

-

-

... More
Replacenment/cutting & welding of Y-piece of DFA system .

168

-

-

... More
Fabrication and erection of platform on bottom Ash disposal pipe line

8

-

-

... More
Complete Overhauling/ servicing of 132 KW AWRS pump (Make Mather+Platt.) including greasing the parts bearing etc. and repairing changing the defective part if required and repairing of bearing housing/shaft by welding, turning etc. changing the gland packing nut, bolts.

6

-

-

... More
Complete Overhauling/ servicing of 30KW pump including greasing the parts bearing etc. and repairing changing the defective part if required and repairing of bearing housing/shaft by welding, turning etc. changing the gland packing nut, bolts including cost of all material.

6

-

-

... More
Complete overhauling/Servicing of Horizontal centrifugal radially split twin casing slurry pump for AWRS intermediate pump house.

8

-

-

... More
Servicing of LP ash water pump.

12

-

-

... More
Replacement of tube connector bearing/enclosing tubes/top or inter shaft of LP pump.

12

-

-

... More
Replacement of LP ash water pump bearing.

12

-

-

... More
Blue matching of foundation of VT pumps after taking out pump assembly from sump.

20

-

-

... More
Checking of eccentricity of shaft after repairing connecting the same of the VT pumps.

20

-

-

... More
Alignment of pump and motor of VT pumps.

16

-

-

... More
Servicing/Replacement of Gate valve 6”/10”/12”/14”/16”.

6

-

-

... More
Servicing/Replacement of NRV size 6”/10”/12”/14”/16”.

6

-

-

... More
Servicing of chain pulley block.

4

-

-

... More
Repairing/ Rebuild and machining of worn out / damaged /eroded assembly parts of different type pumps and Clinker Grinder

-

-

-

... More
Shaft of Clinker Grinder

6

-

-

... More
Casing/Body of Vacuum Pump

4

-

-

... More
Shaft with Impeller of Fluidizing Blower

4

-

-

... More
Fabrication of Worm Gear by re-casting, tooth cutting and Machining of Worm Gear of Clinker Grinder Gear Box

4

-

-

... More
Repairing and Machining of different types of valve.

-

-

-

... More
Gate / glove valve /NRV-150 mm

8

-

-

... More
Gate / glove valve /NRV-200/250 mm

8

-

-

... More
Fabrication of different types of sleeve and Shaft

-

-

-

... More
Shaft sleeve of Clinker grinder ( Material-SS-304)

8

-

-

... More
Shaft sleeve of Vacuum pump (Material- SS-410)

6

-

-

... More
Shaft of Fluidizing Blower

6

-

-

... More
Balancing of Impeller of Vacuum Pump

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.