Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Machinery and Tools
Eprocure
Opening Date7 Sep 2024
Closing Date28 Sep 2024
Tender Amount₹ 16,66,208 
Notes
Download

Costs

Summary

Works Of Preventive And Breakdown Maintenance Of Conveyor Systems And Different Auxiliaries Of Chp Also Repair Rectification, Overhauling, Installation Of Different Size Conveyor Roller Of Chp-a And Chp-b, Obra Tps.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairing of shaft (both side) of pulley at site after removing bearing/sleeve and replacing sleeve bearing New/Old including commissioning of the pulley.

12

-

-

... More
Repairing of guide rollers after removing the same from conveyors and this will include the completion work of cleaning greasing, replacement of parts if required and reinstallation

8

-

-

... More
Greasing of trough/return Rollers

1500

-

-

... More
Repairing of Chute/Patching of holes in the different Chute of conveyor system by welding of M.S. Plate and Welding up to size 0.01 Sq. M. (100 Sq. cm. = 01 no. patch)

102

-

-

... More
Replacement of damaged box duct side packing of conveyor No. 8A/B & 9A/B

12

-

-

... More
Replacement of damaged box duct side packing of all conveyor except.

22

-

-

... More
Replacement of fluid coupling unit by new/repaired one.

7

-

-

... More
Repairing of fluid coupling after removing and re-fixing the same at site of conveyor.

18

-

-

... More
Replacement of damaged resilient plate after removing fluid coupling of conveyor system.

17

-

-

... More
Replacement of Chute inspection door with locking arrangement and their installation.

2

-

-

... More
Fabrication & erection of Chute inspection doors with locking arrangement and their installation.

2

-

-

... More
Fabrication and installation of new Coal centering plate/adjusting plate after removing the damaged one.

12

-

-

... More
Fabrication and installation of new flap gate site including removal and shifting of damaged gate to scrap yard.

6

-

-

... More
Greasing of pollard/covered bearings of conveyors.

600

-

-

... More
Replacement of trough roller structures

22

-

-

... More
Replacement of impact roller structures

6

-

-

... More
Replacement of trough rollers with transportation of New/repaired rollers including lifting of belt etc., shifting of damaged Rollers to the store (Conveyor No. 4A/B, 10A/B, 11A/B, 12A/B,15,16,17, K-10).

120

-

-

... More
Replacement of trough rollers with transportation of New/repaired rollers including lifting of belt etc., shifting of damaged Rollers to the store (Conveyor No. 8A/B, 9A/B).

28

-

-

... More
Replacement of Conveyor No. 4A/B return rollers with transportation of new/old from store to site with replacement of brackets if required along with shifting of damaged rollers to the store.

20

-

-

... More
Replacement of Conveyor 15,16,17,K-10 & Conveyor of S/R return rollers with transportation of new/old from store to site with replacement of brackets if required along with shifting of damaged rollers to the store.

20

-

-

... More
Replacement of Conveyor No. 10A/B,11A/B,12A/B return rollers with transportation of new/old from store to site with replacement of brackets if required along with shifting of damaged rollers to the store.

20

-

-

... More
Replacement of All conveyor except Sl. No. 19.1 & 19.2 return rollers with transportation of new/old from store to site with replacement of brackets if required along with shifting of damaged rollers to the store.

20

-

-

... More
Replacement of impact roller of conveyor 16, K-10 under the reclaiming chute of old and new stacker/re-claimer

12

-

-

... More
Repair of Trough Roller Structure

21

-

-

... More
Repair of Impact Roller Structure

8

-

-

... More
Re-fixing/Placing back the fallen but healthy rollers of structure ofTrough Roller Conveyor 4A/B.

40

-

-

... More
Re-fixing/Placing back the fallen but healthy rollers of structure of Impact Roller Conveyor 4A/B.

16

-

-

... More
Re-fixing/Placing back the fallen but healthy rollers of structure of Return Roller Conveyor 4A/B.

16

-

-

... More
Replacement of the guide roller by new/repaired including transportation

8

-

-

... More
Repair of damaged guide channel of gravity take-up including all cutting and welding and handling of materials from store to site and back.

42

-

-

... More
Topping–up of oil in gear boxes of conveyors system including transportation of oil from the site store to site of work and vice versa.

8

-

-

... More
Topping-up oil in the fluid coupling of conveyor system including transportation of oil from site store to site work and vice-versa.

8

-

-

... More
Replacement of conveyor belt trapped inside box duct side plate and side packing.

8

-

-

... More
Checking & replacement of damaged multi disc/bolt/low speed coupling bolt along with rubber bush, if any tightening of all the bolts

20

-

-

... More
Replacement of the pulley of conveyor system by new/repaired including transportation both side & all rigging work i.e. lifting of take up etc. (Snub pulley of conveyor 4A/B, 8A/B, 9A/B, 10A/B, 11A/B & 12A/B)

3

-

-

... More
Replacement of the pulley of conveyor system by new/repaired including transportation both side & all rigging work i.e. lifting of take up etc. (Intermediate pulley of conveyor 4A/B, 9A/B,10A/B)

1

-

-

... More
Replacement of the pulley of conveyor system by new/repaired including transportation both side & all rigging work i.e. lifting of take up etc. (Gravity/gravity bend pulley of Con. 4A/B, 8A/B, 9A/B, 10A/B, 11A/B& 12A/B15, 16, 17, K-10)

3

-

-

... More
Replacement of the pulley of conveyor system by new/repaired including transportation both side & all rigging work i.e.Tail pulley of Con. 4A/B, 8A/B, 9A/B, 10A/B, 11A/B, 12A/B,

2

-

-

... More
Replacement of the pulley of conveyor system by new/repaired including transportation both side & all rigging work i.e.Tail pulley of conv.15,17,Boom conv. of S/R

1

-

-

... More
Replacement of the pulley of conveyor system by new/repaired including transportation both side & all rigging work i.e. Tripper bend/Head pulley

1

-

-

... More
Replacement of the pulley of conveyor system by new/repaired including transportation both side & all rigging work i.e. Head/primary/secondary/drive pulley of con. 8A/B ,9A/B, 11A/B, 12A/B, 15,16,17,K-10

2

-

-

... More
Replacement of the pulley of conveyor system by new/repaired including transportation both side & all rigging work i.e. Head/primary/secondary drive pulley of con. 4A/B & 10A/B

2

-

-

... More
Replacement of Damaged scrapper assembly by new fabricated assembly.

3

-

-

... More
Replacement of Damaged rubber scrapper and duct packing of conveyors.

16

-

-

... More
Adjustment of belt while going out by adjusting pulley feeder assembly.

16

-

-

... More
Fixing of bunker grid rods including its removal from the position, if required and its refitting in position this will also include the fabrication and installation at the place of necessary grids.

75

-

-

... More
Dismantling of hood covers of different conveyors and reinstallation of the same after completion of works (Head pulley of conveyor & trippers).

4

-

-

... More
Dismantling of hood covers of different conveyors and reinstallation of the same after completion of works (Tail pulley of conveyors).

3

-

-

... More
Overhauling of self aligning structure of conveyor system after removing the same from position and installation after necessary overhauling. This will also include the replacement of spare parts too if required

9

-

-

... More
Replacement of both side plates of box duct of conveyor system after fabrication at site (Up to two Mtrs).

2

-

-

... More
Replacement of both side plates of box duct of conveyor system after fabrication at site (Above two Mtrs).

2

-

-

... More
Fabrication & Installation of back plate after dismantling and shifting up to scrap yard.

5

-

-

... More
Alignment of the motor to reduction gear box.

14

-

-

... More
Removal of the top cover of the gear box and to install the same after completion of the work.

3

-

-

... More
Replacement of the intermediate pinion shaft/bearing of gear box of conveyor No. 4A/B, 8A/B, 9A/B, 10A/B, 11A/B including removal of top cover.

1

-

-

... More
Replacement of input pinion shaft/bearing of gear box of con. No. 4A/B,8A/B,9A/B, 10A/B,11A/B,12A/B including removal of top cover.

6

-

-

... More
Replacement of the output wheel fitted with output shaft/bearing of gear box of con. 4A/B, 8A/B 9A/B, 10A/B, 11A/B & 12A/B8A/B including removal of top cover.

2

-

-

... More
Repairing including replacement of old model hold back ratchet of gear boxes.

3

-

-

... More
Replacement of complete gear box old/new with all internals and associated works.

1

-

-

... More
Overhauling of reduction gear boxes of conveyors No. 4A/B, 10A/B, 11A/B, 12A/B 15,16, 17, K-10 gear box.

6

-

-

... More
Overhauling of reduction gear boxes of conveyors 8A/B, 9A/B gear box.

3

-

-

... More
Overhauling of reduction Tripper gear boxes of conveyors

2

-

-

... More
Re- railment of derailed trippers by means of necessary lifting arrangement including the work of alignment of square bar in derailed Zone Up to two Wheels

3

-

-

... More
Re- railment of derailed trippers by means of necessary lifting arrangement including the work of alignment of square bar in derailed Zone Up to four Wheels

1

-

-

... More
Work on square bar caused due to derailment etc. of trippers including its alignment tightening of bolts and welding etc.

45

-

-

... More
Repair of broken link of chain of chain-sprocket system of traveling tripper along with associated work if any.

18

-

-

... More
Replacement of complete chain of chain sprocket system of traveling trippers.

5

-

-

... More
Replacement of drive end and driven end side sprocket of chain sprocket system of chain sprocket system of travelling tripper.

4

-

-

... More
Replacement of complete gear box of tripper 11A/B & 12A/B by new/old required the work shall involved dismantling installation assembly and alignment.

1

-

-

... More
Replacement of the main drive shaft (axle) of the tripper 11A/B & 12A/B

1

-

-

... More
Fabrication & installation of additional Vertical support according to size of the existing support at site at Conv. 11A/B & 12A/B.

40

-

-

... More
Fabrication & Installation of middle support modified from its bolting with the channels of square bar of Tripper 11A/B & 12A/B.

40

-

-

... More
Leveling of square bar channels and its bolting.

250

-

-

... More
Removal of inspection doors and side covers of gear box to check the condition of gear teeth & bearings and new oil filling while low level in gear boxes along with transportation of oil from store to conveyor site & vice-versa.

14

-

-

... More
Repairing/overhauling of sump pump of conveyor 17&K-10 sump well along with spares of pump & labour charges.

1

-

-

... More
Repairing of gravity take up box of Con. 15, 16, 17& K-10 while fitted on travelling patch of guide channel. Clamping of belt.

3

-

-

... More
Assembling of spare pulley with bearing.

2

-

-

... More
Replacement of damaged slewing pinion by new/repaired one.

2

-

-

... More
Replacement of damaged shaft/oil seal of slewing gearbox.

2

-

-

... More
PART-B Repairing/Overhauling and Installation of different size of Conveyor rollers of (Trough Roller) Coal Handling Plant, ‘O’TPS, Obra.

1700

-

-

... More
Repairing/Overhauling and Installation of different size of Conveyor rollers of (Return Roller) Coal Handling Plant, ‘O’TPS, Obra.

320

-

-

... More
Repairing/Overhauling and Installation of different size of Conveyor rollers of (Impact Roller) Coal Handling Plant, ‘O’TPS, Obra.

120

-

-

... More
PART C ( ACHP)- Dismantling of damaged/worn-out coupling and or driving shaft and any other worn-out gears etc. of Pusher, reasonable alignment with motor and commissioning. It includes replacement of coupling of motor also.

2

-

-

... More
Replacement/repair of broken twisted supporting pipe of overhead conductor.

6

-

-

... More
Replacement of stay wire with turn buckle.

22

-

-

... More
Alignment of conductor pole.

8

-

-

... More
Dismantling, overhauling with replacement of damaged /worn-out parts and lubricating oil and re-assembly. Alignment with motor and commissioning. It includes alignment of motor reducer, platform, fixing of keys, nut & bolts.

2

-

-

... More
As above along with dismantling and replacement of damaged /worn out wheels, shaft and gear by new /repaired by Department.

2

-

-

... More
Dismantling of break system and wagon buffer, overhauling with replacement of damaged/worn-out parts and re-assemble.

2

-

-

... More
Dismantling and removal of damaged and dislocated top cover taking out counter weight from the boxes placing the boxes in position, making holes in the place of boxes and frame, tightening the boxes with frames, filling of counter weights and fixing of top covers.

1

-

-

... More
Dismantling, repair of damaged /worn-out coupling of driving shaft and any other worn out gears etc. of tippler reducer, re-assembly & alignment with motor and commissioning. It includes replacement of motor coupling also.

2

-

-

... More
Repair and re-fixing of damaged/displaced top beam of wagon tippler.

2

-

-

... More
Repair of twisted / broken top beam of wagon tippler.

2

-

-

... More
Repairing of connecting arms of wagon tippler with replacement of worn out parts.

2

-

-

... More
Re-setting of displaced rest wall and replacement of broken worn out studs.

3

-

-

... More
Repair of side jack with replacement of worn out parts.

4

-

-

... More
Re-setting of steel plate or rubber packing of top beam.

8

-

-

... More
Servicing of side centre wheels of wagon tippler with replacement of worn out parts.

2

-

-

... More
Replacement of broken /damaged or re-fixing of fallen/ dislocated platform rails with clits, nut & Bolts.

4

-

-

... More
Repair/replacement of cage ribs /stiffeners.

4

-

-

... More
Repair of broken/damaged round of side box beam by cutting and welding.

2

-

-

... More
Repair of platform angle

8

-

-

... More
Repair of shock absorbers with replacement of worn out parts.

2

-

-

... More
Repair of platform plate.

10

-

-

... More
Repairing of mesh/jolly of Wagon Tippler by cutting &welding.

1

-

-

... More
Dismantling of reducer pinion and connecting arms, overhauling with replacement of damaged/worn out parts and lubricating oil, re-assembly alignment of motor reducer and pinion.

2

-

-

... More
Dismantling of break system overhauling with replacement of damaged/worn-out parts, oil and re-assemble and commissioning.

2

-

-

... More
Dismantling of shock absorber guide rollers and connecting arms, overhauling with replacement of damaged / worn-out parts and re-assemble.

2

-

-

... More
Replacement of rubber packing and plates where damaged on top beam.

2

-

-

... More
Dismantling of side jacks, rest walls and side support bearings, overhauling with replacement of damaged/worn-out parts and re-assemble.

2

-

-

... More
Dismantling of rest rollers and cradles, overhauling with replacement of damaged/worn-out parts and re-assembly.

2

-

-

... More
Repair of platform rails, clits and bolt & nuts.

1

-

-

... More
Dismantling, overhauling with replacement of damaged/worn out parts, lubricating oil, re-assemble and alignment with motor & commissioning belt feeder in addition to servicing and checking of all drums.

2

-

-

... More
Repair of worn out damaged beam/channel of structure.

2

-

-

... More
Replacement of worn out/broken adjusting bolt of belt feeder.

2

-

-

... More
Dismantling, overhauling with replacement of damaged/worn out parts, re-assemble, alignment with motor and commissioning of swing feeders. It also includes replacement of damaged/ worn out cam, bearing, connecting arm, cam wheel and shaft of swing plate.

2

-

-

... More
Repairing of mesh/jolly of Swing Feeders by cutting & welding.

2

-

-

... More
Dismantling, overhauling of reducer & drum with replacement of worn out/damaged parts, lubricating oil, re-assemble, alignment with motor and drum and commissioning of reducer of conveyor No. 1. In case of K-2, , K-7, overhauling of break system is also to be done.

2

-

-

... More
Dismantling, overhauling of reducer & drum with replacement of worn out/damaged parts, lubricating oil, re-assemble, alignment with motor and drum and commissioning of reducer of conveyor No. 2. In case of K-2, , K-7, overhauling of break system is also to be done.

2

-

-

... More
Dismantling, overhauling of reducer & drum with replacement of worn out/damaged parts, lubricating oil, re-assemble, alignment with motor and drum and commissioning of reducer of conveyor No. 3/K13. In case of K-2, , K-7, overhauling of break system is also to be done.

2

-

-

... More
Dismantling, overhauling of reducer & drum with replacement of worn out/damaged parts, lubricating oil, re-assemble, alignment with motor and drum and commissioning of reducer of conveyor No. 6. In case of K-2, , K-7, overhauling of break system is also to be done.

2

-

-

... More
Dismantling, overhauling of reducer & drum with replacement of worn out/damaged parts, lubricating oil, re-assemble, alignment with motor and drum and commissioning of reducer of conveyor No. 7. In case of K-2, , K-7, overhauling of break system is also to be done.

2

-

-

... More
Dismantling, overhauling of reducer & drum with replacement of worn out/damaged parts, lubricating oil, re-assemble, alignment with motor and drum and commissioning of reducer of conveyor No. 8. In case of K-2, , K-7, overhauling of break system is also to be done.

2

-

-

... More
Dismantling, overhauling of reducer & drum with replacement of worn out/damaged parts, lubricating oil, re-assemble, alignment with motor and drum and commissioning of reducer of conveyor No. 9. In case of K-2, , K-7, overhauling of break system is also to be done.

1

-

-

... More
Servicing and repairing of trolleys with replacement of damaged pulley wheels, shafts, bearing and structures of the conveyor No.1

2

-

-

... More
Servicing and repairing of trolleys with replacement of damaged pulley wheels, shafts, bearing and structures of the conveyor No.2

2

-

-

... More
Servicing and repairing of trolleys with replacement of damaged pulley wheels, shafts, bearing and structures of the conveyor No. 3/K13

2

-

-

... More
Servicing and repairing of trolleys with replacement of damaged pulley wheels, shafts, bearing and structures of the conveyor No.6

1

-

-

... More
Servicing and repairing of trolleys with replacement of damaged pulley wheels, shafts, bearing and structures of the conveyor No.7

2

-

-

... More
Servicing and repairing of trolleys with replacement of damaged pulley wheels, shafts, bearing and structures of the conveyor No.8

2

-

-

... More
Servicing and repairing of trolleys with replacement of damaged pulley wheels, shafts, bearing and structures of the conveyor No.9

2

-

-

... More
Replacement of belt tensioning system with removal and replacement of counter weights for the Conveyor No. 1

2

-

-

... More
Replacement of belt tensioning system with removal and replacement of counter weights for the Conveyor No. 2

2

-

-

... More
Replacement of belt tensioning system with removal and replacement of counter weights for the Conveyor No. 3/K13

2

-

-

... More
Replacement of belt tensioning system with removal and replacement of counter weights for the Conveyor No. 6

1

-

-

... More
Replacement of belt tensioning system with removal and replacement of counter weights for the Conveyor No. 7

2

-

-

... More
Replacement of belt tensioning system with removal and replacement of counter weights for the Conveyor No. 8

2

-

-

... More
Replacement of belt tensioning system with removal and replacement of counter weights for the Conveyor No. 9

2

-

-

... More
Repairing of Conveyor belt with Belt Fasteners Making of fasteners joint in all conveyors and belt feeders.

5

-

-

... More
Repairing of Conveyor belt with Belt Fasteners Shifting and laying of conveyor belt for fastener joint.

40

-

-

... More
Opening of side covers of pedestals. Cleaning, checking, greasing and refitting of covers of drums up to dia. 630 mm.

20

-

-

... More
Opening of side covers of pedestals. Cleaning, checking, greasing and refitting of covers of drums Above 630 mm. & up to 1000mm.

15

-

-

... More
Opening of side covers of pedestals. Cleaning, checking, greasing and refitting of covers of drums Above 1000 mm. & up to 1290 mm.

8

-

-

... More
Dismantling of damaged drum from foundation, taking out pedestals, grease protector and bearings, fittings of new/old bearings, grease protector and pedestals in new/repaired drums, greasing and installation. Damaged drum should be shifted to site store and new/repair drum shall be collected from store to side Drum up to dia 630mm

3

-

-

... More
Dismantling of damaged drum from foundation, taking out pedestals, grease protector and bearings, fittings of new/old bearings, grease protector and pedestals in new/repaired drums, greasing and installation. Damaged drum should be shifted to site store and new/repair drum shall be collected from store to side Drum above 630mm and up to 1040mm

2

-

-

... More
Dismantling of damaged drum from foundation, taking out pedestals, grease protector and bearings, fittings of new/old bearings, grease protector and pedestals in new/repaired drums, greasing and installation. Damaged drum should be shifted to site store and new/repair drum shall be collected from store to side Above 1040mm and up to 1290mm

1

-

-

... More
To take out shaft from conveyor drums and re-fitting of new/repaired shaft given by department Drum up to dia 630 mm

2

-

-

... More
To take out shaft from conveyor drums and re-fitting of new/repaired shaft given by department Drum Above 630mm and up to 1040 mm

2

-

-

... More
To take out shaft from conveyor drums and re-fitting of new/repaired shaft given by department Drum Above 1040 mm and up to 1290mm

2

-

-

... More
Refitting of shaft at bearing and coupling portions of drums Up to dia 630mm

2

-

-

... More
Refitting of shaft at bearing and coupling portions of drums Above 630mm and up to 1290mm

4

-

-

... More
Dismantling, overhauling with replacement of damaged/worn-out parts, reassemble, and installation and commissioning of damper gate reducer system.

3

-

-

... More
Dismantling of old and worn-out damper gate, fabrication and erection of new damper gate. It also includes dismantling and re-fixing of top duct.

1

-

-

... More
Fabrication and erection of new coal centering plate after removal of damaged one.

3

-

-

... More
Fabrication and repairing of chute inspection doors with locking arrangement and their installation.

2

-

-

... More
Repairing of chute by patching of holes in the different chute of conveyor by M.S. Plate and welding (up to 0.25 sq. mtr.per job)

50

-

-

... More
Overhauling of monorail 20 MT capacity crane installed at conveyor No. 2.

1

-

-

... More
Overhauling of monorail 20 MT capacity crane with replacement of worn-out parts as per requirement.

1

-

-

... More
Dismantling of damaged/worn-out stainless steel/M.S. coal charging plate, fabrication and erection of new stainless steel/MS coal charging plate in the duct of conveyor 2A,2B.It includes dismantling of removal of scrappers also.

2

-

-

... More
Repair of angle of conveyor structure.

100

-

-

... More
Repair of channel of conveyor structure.

40

-

-

... More
Replacement of damaged rubber scrapper and duct skirt.

40

-

-

... More
Replacement of damaged box duct side packing of Transfer point No.1, Swing feeders, vibrating feeders and conveyor 3A& 3B.

20

-

-

... More
Replacement of damaged box duct side packing of All conveyors and belt feeders except item No. 23.01

20

-

-

... More
Repairing of damaged/worn-out rubber roller structures of different conveyors by new / repaired structure. It includes both way transportation also.

40

-

-

... More
Fabrication and erection of steel scrapper with rubber packing.

7

-

-

... More
Alignment of motor, modification of its foundation and replacement of coupling as per requirement of 0.4 KV-20KW to 50KW motor

3

-

-

... More
Alignment of motor, modification of its foundation and replacement of coupling as per requirement of 0.4 KV-51 KW to 100KW motor

3

-

-

... More
Alignment of motor, modification of its foundation and replacement of coupling as per requirement of 0.4 KV-101KW to 199KW motor

3

-

-

... More
Alignment of motor, modification of its foundation and replacement of coupling as per requirement of 6.6 KV-200KW motor.

2

-

-

... More
Dismantling, overhauling, installation and commissioning of de-watering pump at various site of CHP.

4

-

-

... More
Picking and removal of foreign materials with Ex. MS bars, angles, channels, stone blocks, nuts & bolts and conveyor belt etc. from all the corners of coal yard area by employing manual labors and stacking in the scrap yard of CHP. At least 2Nos. labors shall be engaged in the working days in general shift. (One month work shall be treated as one job)

5

-

-

... More
Minor/misc. Repairing work i.e. removal of broken bolts, brake liner fixing, conv. belt adjustment, stair minor repairing, belt adjustment, minor patch works on ducts/chute, oil leakage arrested from gear box/brake assembly, Dewatering pump cleaning, bush fitting in Dewatering pump, Dewatering pipe line repairing, coupling /decoupling of all auxiliaries, minor welding works on pulley, replacement of conv. roller, repairing of roller’s bracket, cover opening /closing of crusher & motor , repairing of grease gun of crusher, minor repairing of hoisting system of CHP, broken cam replacement of S/F, brake motor replacement, repairing of hydraulic jack, Removing/Fitting coupling in motor/Gearshaft , making key and refitting, Repairing & Resetting of brake assembly of WT pusher and other conveyor, Shifting greasing and refitting of fallen rollers. other all minor works which are required to smooth running of CHP

100

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.