Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender
Machinery and Tools
Eprocure
Opening Date31 May 2024
Closing Date8 Jul 2024
Tender Amount₹ 26,65,736
Costs
EMD
₹ 53,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Misc. Pump Equipment Maintenance Including Raw Water Pumps
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RVUNL_925832_1Bid Award Id
ViewTender No
01/NANP/D/OMC1/CAD/6000005617Tender Authority
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited ViewPurchaser Address
-Website
http://https://uprvunl.org/uprvunl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Complete overhauling/ servicing of the Raw Water pumps(PT)
4
-
-
Complete overhauling/ servicing of the DM- Make pumps
6
-
-
Complete overhauling/ servicing of the Boiler fill Pumps
2
-
-
Complete overhauling/ servicing of the Service Water Pumps
8
-
-
Complete overhauling/ servicing of the APH Wash Water Pump
2
-
-
Complete overhauling/ servicing of the Lubricating Water Pump for Raw Water Pump (PT & AHP)
8
-
-
Complete overhauling/ servicing of the Condensate Transfer Pump
2
-
-
Complete overhauling/ servicing of the DM Transfer Pumps
2
-
-
Overhauling of Discharge Valve & NRV of Raw Water pumps (AHP)( fitted with butterfly discharge valve)
12
-
-
Overhauling of Discharge Valve & NRV of Raw Water pumps (PT)( fitted with butterfly discharge valve)
12
-
-
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Raw Water pumps (AHP)
4
-
-
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Raw Water pumps (PT)
4
-
-
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of DM- Make pumps
4
-
-
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Boiler fill Pumps
4
-
-
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Service Water Pumps
8
-
-
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of APH Wash Water Pump
4
-
-
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Condensate Transfer Pump
4
-
-
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of DM Transfer Pumps
2
-
-
Attending the breakdown of the pump for any part or sub assembly in the set of Raw Water pumps(AHP)
4
-
-
Attending the breakdown of the pump for any part or sub assembly in the set of Raw Water pumps (PT) (in case complete pump set is required to be opened)
4
-
-
Attending the breakdown of the pump for any part or sub assembly in the set of DM- Make up pumps. (In case complete pump set is required to be opened)
6
-
-
Attending the breakdown of the pump for any part or sub assembly in the set of Boiler fill Pumps. (In case complete pump set is required to be opened)
4
-
-
Attending the breakdown of the pump for any part or sub assembly in the set of Service Water Pumps. (In case complete pump set is required to be opened)
8
-
-
Attending the breakdown of the pump for any part or sub assembly in the set of APH Wash Water Pump. (In case complete pump set is required to be opened).
4
-
-
Attending the breakdown of the pump for any part or sub assembly in the set of Condensate Transfer Pump. (In case complete pump set is required to be opened).
4
-
-
Attending the breakdown of the pump for any part or sub assembly in the set of DM Transfer Pumps. (In case complete pump set is required to be opened)
2
-
-
Cleaning of jungle including uprooting of grass, wild vegetation bushes, small trees around and in between the gap of pipeline of raw water and CW Pump house.
18800
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements