Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Eprocure
Opening Date7 Apr 2020
Closing Date5 May 2020
Tender Amount₹ 14,74,000 
Notes
Download

Costs

Summary

Work Of Lighting Arrangement In Unit No 13 Btps,obra During Its Randm .

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Installation of 1cx4 mm2 Cu 1.1KV graded single core Cu conductor PVC black insulated wire in unit no. 11 at following locations in G.I. conduit. 1cx4 mm2 PVC wire will be provided by Nigam. Other related hardware shall be arranged by the contractor at his own cost. 1. boiler'0'M to 54 M-6000M

6000

-

-

... More
Installation Junction Box-150x150x60mm, outdoor type for branching & terminating of lighting wires/cables wherever required in Unit No.11. The J.B. will be provided by Nigam. Other necessary accessories like bracket, bolts, nuts & screws etc. required for installation included in the rate and shall be arranged by the contractor at his own cost.

1000

-

-

... More
Installation of 16 SWG GI wire to run alongwith G.I. conduit/flexible conduit for earthing at various locations of boiler side area. 16 SWG GI wire will be provided by Nigam.

10400

-

-

... More
Installation of 150W/250W/400W HPSV complete fitting at various location of Unit No. 11 as per site requirement with the help of 2” dia conduit in all respect including testing, commissioning & charging through LP. Necessary fittings 150W/ 250W/400W will be provided by Nigam. Other related hardware shall be arranged by the contractor at his own cost. 1.   1x150W HPSV complete fittings= 95Nos. 2.   1x150W HPSV complete fittings= 100Nos. 3.   1x150W HPSV complete fittings= 12Nos.

207

-

-

... More
Installation of 70W HPSV complete fittings at various locations of Unit No.11 as per site requirement with the help of 1½” dia conduit in all respect including testing, commissioning & charging through LP. Necessary fittings 70W HPSV will be provided by Nigam. Other related hardware shall be arranged by the contractor at his own cost. 1 .1x70W HPSV complete fittings-190Nos.

190

-

-

... More
Installation of 2x36W/40W 4’ complete FTL fittings (hanging type) in ESP S/G ground floor of Unit No.11. Work include testing, commissioning & charging through LP. Necessary fittings, Flexible conduit, sealing rose shall be provided by Nigam free of cost. Other necessary accessories required for installation included in the rate and shall be arranged by the contractor at his own cost

18

-

-

... More
Installation of 2x36W/40W 4ft. complete FTL fittings (hanging type) in ESP S/G 1st floor (false ceiling) of Unit No.11. Necessary fittings, Flexible conduit & sealing rose will be provided by Nigam free of cost. Other necessary accessories required for installation included in the rate will and shall be arranged by the contractor at his own cost.

18

-

-

... More
Installation of 1x36W/40W 4 ft. FTL fittings at ID Fan-A & B, PA Fan-A&B, FD Fan- A&B and oil heating station and other location as per site requirement in Unit No. 11. Work include testing, commissioning & charging through LP. Necessary fittings will be provided by Nigam. Other related hardware shall be arranged by the contractor at his own cost.

15

-

-

... More
Installation of lighting panel (LP) at various locations of Boiler side area. Work include installation & commissioning of LP in all respect, termination of cable, dressing, clamping and connecting 3½Cx70mm2 . Other related hardware shall be arranged by the contractor at his own cost.

12

-

-

... More
Replacement of defective MDS loadstar terminal block, 16A Cu cable, 16A Cu lugs, 25/35/70mm2 Al. lugs, proper lugging, dressing, clamping of cable into LDB at various location in Unit No.11. Work also include denting & painting of LDB Cabinet. Necessary materials will be provided by Nigam free of cost. Other related hardware shall be arranged by the contractor at his own cost.

5

-

-

... More
Testing & commissioning in all respect/ replacement of defective HPMV/HPSV choke, lamp, ignitor-70W/150W/250W/400W of existing fittings in turbine side area at various locations in Unit No.11: 1.   Turbine hall overhead. 2. Turbine side ‘0’M-9M roof. 3 Turbine side (-4M) area.

80

-

-

... More
Revisioning,/rewiring/reparing of existing conduit wiring provided for lighting of turbine area 11th unit at following locations: 1. Cable gallery area - 450 M 2.Switchgear area- 300 M 3.Boiler MCC area- 250 M 4.Turbine Hall '0'M- 500M

1500

-

-

... More
Testing & commissioning in all respect/ replacement from defective 40W fittings choke, tube rod starter and other necessary accessories in Unit No. 11 at various locations of turbine side area, station S/G, 0.4KV S/G, turbine ‘0’M, Turbine 3M, Turbine 5M, Battery room, Battery Charger room, Cable Gallery-5M, BMCC room, Ari Washer room, (-4M) area, cable gallery (-4M), UCB, DAS room, UCB UPS room etc.

550

-

-

... More
Fabrication & fixing of stand of MS Angle/plate of size 60cmx50cm for installation of welding booth at various location of boiler side in unit no.11. Scrap, angle, plates etc. shall be provided by Nigam from scrap yard. Other related hardware shall be arranged by the contractor at his own cost.

9

-

-

... More
Fabrication of welding booth of size 50x40x18cm from MS plate. Fixing of Al. Bus bar& insulators in welding booth. Work also include painting of welding booth (inside & outside) by applying one coat red oxide & two coat smoke gray paint of standard make. Installation of welding booth of stand as above (Point No. 16). MS plate shall be provided by Nigam from scrap yard. Other related hardware, consumables, paint & primer shall be arranged by the contractor at his own cost.

9

-

-

... More
Repairing/replacement of damaged Al. Bus bar, insulators Al. lugs etc. from welding box. Work also include painting of welding booth (inside & outside) by applying one coat red oxide & two coat smoke gray paint of standard make in Unit No.11 (Turbine side. Other related hardware, consumables, paint & primer shall be arranged by the contractor at his own cost.

9

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.