Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Eprocure
Opening Date29 May 2019
Closing Date19 Jul 2019
Tender Amount₹ 9,80,362 
Notes
Download

Costs

Summary

Routine / Breakdown Maintenance Work Of M/s L And T Make 0.4 Kv Switchgear Of Air Conditioning Plant And Rewinding / Repairing Of Panel Mounted Air Cooled, Dry Type,75 Kva Isolation Transformer

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Break down maintenance of 0.4 KV motor feeder modules including fault finding of control circuit & replacement of damaged / defective parts like contractors/ EMRs/ Switches /Fuse carriers etc. and tightness of cable termination at MCC and motor both the end.

10

-

-

... More
Break down maintenance of 0.4 KV modules other than motor feeders including replacement of damaged/defective parts like switches/fuse carriers etc.

10

-

-

... More
Replacement of protection relays / bus CT/ Bus PT etc. including rectification of the fault of associated circuit.

10

-

-

... More
Checking & replacement of damaged heaters, its control circuit parts & re-commissioning of compressors.

5

-

-

... More
Break down maintenance of control circuit panel of Condenser and chiller pump’s motors including fault finding of control circuit, replacement of defective parts & set right the local as well as remote operation.

10

-

-

... More
Repair / replacement of defective switches such as local / remote, trip / close auto / manual etc. of Bus Bar cubicle or panels.

20

-

-

... More
Break down maintenance of star delta starter & TPN switches of 40 KW to below110 KW motors in Air Conditioning plant .

15

-

-

... More
Checking &replacement of defective parts of disconnecting switches (knife switches) such as ferrules / connectors / insulators / Lugs etc.

20

-

-

... More
Daily Upkeeping of electrical parts of central ac plant comprises of UCB,MCB, Service house Building, ESP control Rooms

365

-

-

... More
Part-B:

-

-

-

... More
Rewinding of damaged / burnt coil of one of the three limbs of primary/secondary winding of panel mounted air cooled, dry type, 3 phase, 75 KVA Isolation Transformer having Voltage Ratio 415 V / 433 V, insulation class ‘B’, Primary side tapping +/- 2.5 %, Secondary side tapping +/- 5.0 %, Off Circuit copper link type connection.

6

-

-

... More
Complete rewinding of damaged / burnt panel mounted air cooled, dry type, 3 phase, 75 KVA Isolation Transformer having Voltage Ratio 415 V / 433 V, insulation class ‘B’, Primary side tapping +/- 2.5 %, Secondary side tapping +/- 5.0 %, Off Circuit copper link type connection.

6

-

-

... More
Replacement of Bakelite sheet in 60 cm x 25 cm x 01cm size having 26 Nos. of holes on it.

6

-

-

... More
Replacement and fixing of nuts & bolts in 05 cm x 05 mm. size

100

-

-

... More
Servicing & double coat spray varnishing of panel mounted, air cooled, dry type, 3 phase, 75 KVA Isolation Transformer having Voltage Ratio 415 V / 433 V, insulation class ‘B’, primary side tapping +/- 2.5 %, secondary side tapping +/- 5.0 %,off circuit copper link type connection including minor repairing work such as brazing of connections, tightening of nuts & bolts etc. and its re commissioning.

50

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.