Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Energy, Oil and Gas
Machinery and Tools
Manpower Supply
Eprocure
Opening Date17 Oct 2024
Closing Soon27 Nov 2024
Tender Amount₹ 14,09,01,766 
Notes
Download

Costs

Summary

Biennial Contract For Mech. Mtnnce (prev, Rtn, Bd, Oh), Operational Support Of Equipments Of Main Plant Boiler, Aux,tg, Aux And Bop (excl Major Overhauls

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BIENNIAL CONTRACT FOR MECH. MTNNCE (PREV, RTN, BD, OH), OPERATIONAL SUPPORT OF EQUIPMENTS OF MAIN PLANT BOILER, AUX,TG, AUX AND BOP (EXCL MAJOR OVERHAULS OF BOILER AND TURBINE) AT PTEP (1X660MW), ENGAGEMENT OF FIELD OPERATION ASSISTANT IN CCR
Instructions to Tenderers, PQC Details, Tender Specifications, Scope of Work, BOQ, Various Annexures etc.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Operation of one No. TG hall EOT crane (Capacity 100/42T) (One job will be of 8 hrs duration operation)

730

-

-

... More
Breakdown maintenance of Main TG area auxiliaries like BFP, CEP, Vacuum pump, DMCW Pump & other small pumps

-

-

-

... More
Rev./ Replacement of DE Journal bearing of T-BFP/MDBFP BOOSTER PUMP

2

-

-

... More
Rev./Replacement of NDE Journal bearing of T-BFP/ MDBFP BOOSTER PUMP

2

-

-

... More
Rev./Replacement of NDE Thrust Bearing of TDBFP /MDBFP BOOSTER PUMP

2

-

-

... More
Rev./Replacement of NDE Mech. Seal of TDBFP/MDBFP BOOSTER PUMP

2

-

-

... More
Rev./Replacement of DE Mech. Seal of TDBFP/MDBFP BOOSTER PUMP

2

-

-

... More
Inspection/ Minor Overhauling of Booster Pump of TDBFP/MDBFP

2

-

-

... More
Rev./Replacement of DE Journal bearing of T-BFP/MDBFP FEED PUMP

2

-

-

... More
Rev./Replacement of NDE Journal bearing of T-BFP/MDBFP FEED PUMP

2

-

-

... More
Rev./Replacement of NDE Thrust Bearing of TDBFP /MDBFP FEED PUMP

2

-

-

... More
Rev./Replacement of NDE Mech. Seal of TDBFP/MDBFP FEED PUMP

2

-

-

... More
Rev./Replacement of DE Mech. Seal of TDBFP/MDBFP FEED PUMP

2

-

-

... More
Thread out of BFP Cartridge

2

-

-

... More
Thread in of BFP Cartridge

2

-

-

... More
Miscellaneous revisioning work of Hydraulic coupling:

2

-

-

... More
Revisioning of Thrust cum radial bearing no. 1 of BFP-Turbine

2

-

-

... More
Revisioning of rear journal bearing no. 2 of BFP-Turbine:

2

-

-

... More
Inspection/ Overhauling of Gear Box of BFP Turbine:

2

-

-

... More
Inspection and rectification of Thrust and Journal bearings of condensate extraction pumps

2

-

-

... More
Inspection and rectification of Thrust and Journal bearings of Drip Pump:

2

-

-

... More
Rev/replacement of Mech. Seal of CEP:

2

-

-

... More
Rev/replacement of Mech. Seal of Drip Pump:

2

-

-

... More
Complete Overhauling of Condensate Extraction Pump:

2

-

-

... More
Replacement of Condensate Extraction pump:

2

-

-

... More
Complete Overhauling of Drip Pump:

2

-

-

... More
Axial & Radial alignment of Horizontal equipment like MDBFP to Hydraulic coupling/ Hydraulic coupling to Motor/ Motor to Booster pump/ TDBFP to Drive Turbine/ Drive Turbine to Gear box/ Gear box to Booster pump

10

-

-

... More
Complete servicing/overhauling of vacuum pump :

2

-

-

... More
Replacement/Servicing of DE bearing of main vacuums pump

2

-

-

... More
Replacement/Servicing of NDE bearing of main vacuum pump

2

-

-

... More
Replacement of DE Mechanical Seal/ gland of Vacuum pump:

2

-

-

... More
Replacement of NDE Mechanical Seal/ gland of Vacuum pump

2

-

-

... More
Replacement/Servicing of white metal bearing of Motor. (Booster Pump side /Hydraulic Coupling side).

2

-

-

... More
Servicing/Overhauling Portable Oil Purifier of MDBFP:

2

-

-

... More
Overhauling of TDBFP/ Main TG - transfer oil pump/ Oil purifier Gear type oil pump

4

-

-

... More
Axial and radial alignment of vertical Pumps like Tank mounted lube oil pump of Main TG/ BFPT & Condensate pump-CEP/Drip Pump

6

-

-

... More
High capacity horizontal Pump Alignment

16

-

-

... More
Low capacity horizontal Pump Alignment :

16

-

-

... More
Replacement of coupling of equipment like MDBFP/ TDBFP/CEP/Drip pump/Vacuum Pump/DMCW pump/EOP/AOP of main turbine & BFP Drive turbine.

4

-

-

... More
Arresting oil leakage through the felt ring of MOP of Main Turbine/ Drive Turbine:

2

-

-

... More
Replacement of MOP/ EOP of main turbine/ BFP Drive Turbine (One job consists one pump):

2

-

-

... More
Rev/Replacement of bearing of MOP/ EOP of main turbine/ BFP Drive Turbine/ MDBFP AOP (One job consists one pump):

2

-

-

... More
Low capacity water & Oil service Pump Mechanical Seal replacement

8

-

-

... More
Low capacity water & Oil service Pump Bearing replacement

8

-

-

... More
Complete Overhauling/ Servicing of Low capacity water & oil service pump.

4

-

-

... More
Repair/ Overhauling of DMCW Pump:

4

-

-

... More
O/H of Vapour extractor of MOT/ Control Fluid Tank/ TDBFP Oil Tank/ GSC vapour extractor : (One job consists of one tank)

4

-

-

... More
O/H of Sump Pump/ Dewatering pump:

6

-

-

... More
Replacement/ Inspection/ Revisioning of EH control oil unit pump of Main Turbine/ HP bypass valve:

2

-

-

... More
Checking & filling of N2 (Nitrogen) gas in Accumulators.

12

-

-

... More
Replacement of N2 Bladders / Service of accumulators of Turbine system and its auxiliaries: (One job consists of one auxiliary)

4

-

-

... More
Overhauling of Hydrazine/ Ammonia dosing pump:

8

-

-

... More
TG Hall (100/42 MT) / BFP (65 MT) EOT Crane- Attend defect

10

-

-

... More
Inspection, Testing & Issue of required Statutory test certificate for TG Hall (100/42 MT) / BFP (65 MT) EOT Crane

4

-

-

... More
Breakdown maintenance work of TG Area: Tanks/ Heaters/ Strainers/Condenser Jobs

-

-

-

... More
Replacement of the Burst Atmospheric relief Diaphragm of LP Turbine/ Drive Turbine.

4

-

-

... More
Inspection of last stage blades of LP Turbine and minor repair work if required.

2

-

-

... More
Oil Replacement/Tank cleaning & Minor revisioning of Main Turbine EHC unit Oil /Turbine HP Bypass Oil:

2

-

-

... More
Preservation of Steam turbine: HP/IP/ALP/BLP/Condenser/LPH1 & 2

2

-

-

... More
CEP /BFP BP/DMCW pump (SUC STRAINER) Cleaning

20

-

-

... More
BFP Main pump Suction Strainer Cleaning

2

-

-

... More
MOT Duplex Filter/ Return oil MOT strainers Cleaning

12

-

-

... More
Centrifuging of Lub Oil through Portable Centrifuging machine

12

-

-

... More
Bowl cleaning of Portable centrifuge

20

-

-

... More
Cartridges replacement/ revisioning/ cleaning of Main Turbine/Drive Turbine/CLOST Oil Conditioners

4

-

-

... More
Inspection/ cleaning, flushing and normalization of Deaerator.

2

-

-

... More
Inspection/ cleaning, flushing and normalization of Condenser hot well (one Condenser)

4

-

-

... More
Condenser water box cleaning TG (Both sides) of one pass.

8

-

-

... More
Inspection, cleaning and adjustment of Condenser COLTCS Screen.

8

-

-

... More
TANK Cleaning-TG DMCW O/H tank / Both LP & HP Dosing Tank / Drip tank/ flash tank/ Lube oil unloading tank etc. (either of LP/HP/Atm FT)

4

-

-

... More
Inspection and Cleaning of MOT Tank/COT/DOT Tan

2

-

-

... More
Inspection and Cleaning TDBFP MOT Tank

2

-

-

... More
Inspection/ Cleaning of MOT Oil Plate Heat Exchanger

2

-

-

... More
Inspection/ Cleaning of MDBFP & TDBFP Lube oil /working oil Plate Heat Exchanger

4

-

-

... More
HP Heater / LP Heater /DE superheater /GSC Internal inspection/servicing/ Attending tube leakage

2

-

-

... More
HP Heater/ LPHeater /DE Superheater/ GSC manhole door gasket replacement.

2

-

-

... More
Tube & Shell type cooler cleaning, Tube leakage checking and plugging:

2

-

-

... More
Cleaning of sump pits of T/G Area.

20

-

-

... More
Filling, Flushing and normalization of DMCW System

2

-

-

... More
Performing of system vacuum and Condenser tube leak test and attending all the leakages by plugging and welding, if any.

4

-

-

... More
Hanger Check/ Attend defect:

20

-

-

... More
The work of revisioning/ servicing of ball collector of condenser tube cleaning system

8

-

-

... More
The work of inspection/ minor repairing of ball catch strainer of condenser tube cleaning system

4

-

-

... More
Cleaning of CEP Pit/ Condenser Pit/ BFPT Pit/ MOT Pit

48

-

-

... More
Breakdown maintenance work of TG Area: Servicing/ overhauling of Valves/ NRV/PRV

-

-

-

... More
Main TG/BFPT: MSV/MCV servomotor servicing

2

-

-

... More
HP/LP Bypass valve servicing.

2

-

-

... More
Servicing of motor operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves of Oil, Condensate, feed water, steam, CW, DMCW, ACW line valves (except butterfly valves), LP Valve (Dia6”)

30

-

-

... More
Servicing of motor operated LP Valve (Dia 6- 12”)

20

-

-

... More
Servicing of motor operated LP Valve (Dia12”)

2000

-

-

... More
Servicing of motor operated HP Valve (Dia6”)

20

-

-

... More
Servicing of motor operated LP Valve (Dia 6- 12”)

10

-

-

... More
Servicing of motor operated HP Valve (Dia12”)

1000

-

-

... More
Replacement of gland packing of HP / LP Valves on per mm. dia basis of valve

1000

-

-

... More
Repair/ Replacement of LP piping by cutting & welding

600

-

-

... More
Replacement of flange type gate / globe valves/butterfly valves of LP lines

1000

-

-

... More
High pressure TIG Welding per one inch dia pipe basis. ( Proportionate payment shall be done for other sizes)

50

-

-

... More
Safety Valve Servicing: (1”-4”)

10

-

-

... More
Safety Valve Servicing: (4”-8”)

4

-

-

... More
Safety Valve Servicing: (8”)

2

-

-

... More
Revisioning / Servicing of Butterfly valves (Size: 6”)

8

-

-

... More
Revisioning / Servicing of Butterfly valves (Size: 6-12”)

4

-

-

... More
Revisioning / Servicing of Butterfly valves (Size: 12”)

2

-

-

... More
Servicing of valve Gear Box (Size: Up to 12”)

4

-

-

... More
Servicing of valve Gear Box (Size: 12”)

4

-

-

... More
Flange (Above DN300) Attend Defect

20

-

-

... More
Replacement of flange gasket of HP/ LP valves & piping

1000

-

-

... More
Expansion Joints (UPTO 1000MM) Replacement

2

-

-

... More
Breakdown maintenance work of TG Area: Replacement of Valves/ NRV/PRV & Miscellaneous work

-

-

-

... More
LP Valve Replacement

1000

-

-

... More
HP Valve Replacement

1000

-

-

... More
Steam Piping Stress Relieving

8

-

-

... More
Steam Piping (Dia6”)Stress Relieving

2

-

-

... More
Fabrication & Erection of Platform, Stairs, Rack on Tonnage basis

4

-

-

... More
Erection of scaffolding

8

-

-

... More
General cleaning of turbine area for 1x660 MW, PANKI EXTN.

-

-

-

... More
Daily Cleaning work of all Floors, stairs, railings, trenches, doors etc in the turbine area.

630

-

-

... More
Weekly Cleaning work of ventilation and cooling air ducts/ piping, columns, etc in the turbine area.

104

-

-

... More
For Mechanized cleaning of T.G. Floors - 1x660 MW, ETPS: Frequency: Weekly

104

-

-

... More
Routine and Preventive/Breakdown Maintenance of Main Boiler & its accessories Including Pressure Part , Soot Blowers, HP Valves, LP Water Pumps, Online sealing of Valves, Insulation Refractory works etc and Daily Routine Maintenance of Main Boiler as well as Auxiliary Boiler and cleaning activities of these in general shift of 1X660 MW, PANKI THERMAL EXTENSION PROJECT PANKI KANPUR for a period of 02 Year.

-

-

-

... More
Preventive/Breakdown maintenance of Pressure Parts

-

-

-

... More
Attending tube leakage up to 1st ten H.P. weld joints. (irrespective of number H.P. weld joints in one frequency)

10

-

-

... More
Attending tube leakages for each H.P. weld joints beyond 10 Nos. of H.P. weld joint.

200

-

-

... More
Boiler HP Joint Radiography

400

-

-

... More
Fixing of Scaffolding during Attending Tube Leakage.

12

-

-

... More
Sky Climber Installation and Removal.

6

-

-

... More
Eco Coils Attend defect online.

6

-

-

... More
Stress Relieving of HP Joints.

200

-

-

... More
Boiler (Tube Bends) Fabrication.

40

-

-

... More
Boiler Segment Shield Welding.

800

-

-

... More
Boiler Peep/Man Hole Attend Defect.

40

-

-

... More
Hanger Inspection.

200

-

-

... More
Hanger Servicing.

20

-

-

... More
Preventive/Breakdown maintenance of soot blowers.

-

-

-

... More
Wall Blower/LRSB Over hauling

50

-

-

... More
Attending Defect of Soot Blower Valve

100

-

-

... More
Wall Blower Servicing.

100

-

-

... More
Operation & Maintenance of LRSB.

100

-

-

... More
Flange (Gasket) Replacement of soot blowers.

100

-

-

... More
Preventive/ Breakdown maintenance of sky climber

-

-

-

... More
Testing of Sky climber after installation.

20

-

-

... More
Over hauling of Sky Climber.

6

-

-

... More
Removal of Honey comb from Boiler.

10

-

-

... More
Over Hauling/Servicing of HP Valves.

-

-

-

... More
Overhauling of Safety Valve.

4

-

-

... More
Overhauling of Control Valve size up to 6".

40

-

-

... More
Servicing of HP Valve size up to 6"

10

-

-

... More
Servicing of HP Valve size above 6" to 12"

6

-

-

... More
Servicing of HP Valve size above 12"

4

-

-

... More
Servicing of NRV size 6" to 12"

4

-

-

... More
Servicing of NRV size below 6"

8

-

-

... More
Servicing of NRV size above 12"

8

-

-

... More
Overhauling of E/M Relief Valve.

4

-

-

... More
Gland Replacement of HP Valve.

100

-

-

... More
Preventive/ Breakdown & Over hauling of Boiler fans.

-

-

-

... More
Coupling and alignment of Fan.

20

-

-

... More
Overhauling of Fan.

4

-

-

... More
Checking and Fault removal of Oil gun assembly.

100

-

-

... More
Preventive/Breakdown maintenance of duct & dampers

-

-

-

... More
Attending defect of dampers and Gate.

20

-

-

... More
Replacement of Damaged portion of Duct.

20

-

-

... More
Repair of damaged Expansion Joints.

4

-

-

... More
Preventive/ Breakdown maintenance of LP water pumps.

-

-

-

... More
Servicing of LP Water Pump.

6

-

-

... More
Replacement of LP Water Pump Bearing.

10

-

-

... More
Replacement of LP Water Pump Gland.

12

-

-

... More
Coupling and alignment of LP Water Pump.

50

-

-

... More
Removal and Installation of Scanner hose/Purg air hose Pipe.

40

-

-

... More
Preventive/ Breakdown maintenance of lube oil system of hydraulic valves.

-

-

-

... More
Replacement of Lube oil Pump.

4

-

-

... More
Over hauling of Lube oil System.

10

-

-

... More
Alignment of Lub Oil Pump Coupling

20

-

-

... More
Servicing of Electrical hoist (Load range 0.3 to 0.5).

8

-

-

... More
Servicing of LP Valve size up to 6".

12

-

-

... More
Replacement of LP Valve (Flange Type) size up to 6".

40

-

-

... More
Insulation & Refractory of Boiler and Turbine area.

2000

-

-

... More
NDT (Die Penetration) DPT.

200

-

-

... More
Structural Fabrication.

100

-

-

... More
Online Leak sealing of HP Valve.

-

-

-

... More
Attending defect of online

80

-

-

... More
Ring Clamp(above 2") attend defect

10

-

-

... More
Box Clamp(above 9") attend defect

10

-

-

... More
Online Safety Valve set pressure verification and set pressure adjustment by Valtest method for safety Valve installed in Boiler area.

-

-

-

... More
Safety Valve setting

30

-

-

... More
Including Travelling charges with fare expenses issued.

4

-

-

... More
Daily routine maintenance work scope including burners, scanner air fan, purge air fan, Checking of soot blowers, oil gun cleaning etc. in respect of Main boiler as well as Aux boiler work round the clock

730

-

-

... More
Cleaning of boiler and other associated work of 1x660 MW as well as Aux boiler.

730

-

-

... More
Round the clock operation and maintenance works of Bowl mill, Gravimetric coal feeder, Coal mill reject system, ID/FD/PA fan, Air Pre-heater, ECW and its associated system of 1X660 MW PTEP PANKI KANPUR for a period of 02 Year.

-

-

-

... More
Round the Clock Routine, Preventive & Breakdown Mechanical Maintenance of Bowl Mill and Its Associated System as per Scope of Work And Bill of Quantity.

-

-

-

... More
Inspection / Replacement Of Mill Coupling

16

-

-

... More
Oil Replacements of Mill Roller Assly/ Gear Box/ Centrifuging of Oil

32

-

-

... More
Replacement & Servicing of Bowl Mill Spring

48

-

-

... More
Replacement of Bull Ring Segment

16

-

-

... More
Adjustment/ Repair of Separator Body Assembly/ Classifier Servicing

24

-

-

... More
MDV/ Burner Inlet Gate (Big)/ Variable Orifice/Transition Piece Replacement

64

-

-

... More
Repair/Replacement of Scraper Assembly

32

-

-

... More
Replacement / Checking of Labyrinth Seal Assembly per Mill

16

-

-

... More
Mill Gearbox Input Shaft/ Bearing Replacement

16

-

-

... More
Cleaning, Greasing, Servicing of Electrically Operated HOIST of MILLs. FD/ID/PA Fans/Economiser . Capacity (Nos.) :- capacity 60T (01), 22T(01), 5T(02), 20T(02),10T(01) 20T ( 02 no.) & capaciy 01T (10nos.)

16

-

-

... More
Structure Fabrication

40

-

-

... More
Replacement of Roller Journal Assembly. (One RJ Assembly makes One Job):

48

-

-

... More
Changing Trunnion Position of RJ Assembly. (One Trunnion of One Mill makes One Job).

48

-

-

... More
Replacement of Worn Out Grinding Roll with New/Healthy One including Servicing of RJ Assembly:-

60

-

-

... More
Repair of Airport Ring Assembly. complete One Set (One Set consist of 06 pieces).

16

-

-

... More
Repairing/Replacement of Bowl Extension Ring Segment.

24

-

-

... More
Repairing Eroded Portion of Classifier Inner Cone

64

-

-

... More
Complete Dense Hard Facing of Cap of Airport Ring Assembly & Extension Ring (with L&T-670/700 Hard Facing Electrode).

64

-

-

... More
Servicing of Lube Oil System of Mills (One Mill makes One Job).

32

-

-

... More
Servicing of Pressure Spring Assembly ( One Spring Assembly of any Mill shall be considered as One Quantity).

48

-

-

... More
Replacement/Servicing of Journal Stop Bolt.

48

-

-

... More
Checking/Replacement of (Leaking) Victaulic Coupling Rubber Gasket of MDV/ Transition Piece.

64

-

-

... More
Replacement/ Refitting/Servicing of Classifier Blade

80

-

-

... More
Replacement of Mill Side Liner

16

-

-

... More
Repairing of Mill Side Liners by Patching/Welding

16

-

-

... More
Repairing/Replacement of Mill Side Bottom Liner.

16

-

-

... More
Checking / Replacement of Bottom Insulation Covers Plate ( Complete Set):-

16

-

-

... More
Repairing of Bottom Insulation Cover Plate

16

-

-

... More
Servicing of Seal Air Valve on Seal Air Header of Mills

16

-

-

... More
Round the Clock Routine Maintenance of Bowl Mills, RC Feeder & Coal Pipes & Other Miscellaneous Work.

2190

-

-

... More
Cleaning/ Removal of Choking from the Split Raw Coal Pipe from Bunker Outlet Gate to Bowl Mill (Mainly During Rainy Season) choked due to Wet Coal in the form of Slurry/Sticky.

400

-

-

... More
Breakdown Mechanical Maintenance of RC Feeder and Coal Pipe as per Scope of Work and Bill of Quantity.

-

-

-

... More
Inspection and Maintenance Gravimetric Feeder

32

-

-

... More
Replacement of Belt

32

-

-

... More
Replacement of Belt Drive Reducer

16

-

-

... More
Servicing of Belt Drive Reducer & Eddy Current Clutch Coupling

16

-

-

... More
Replacement of Clean out Conveyor Drive Reducer

16

-

-

... More
Servicing of Clean Out Conveyor Drive Reducer

16

-

-

... More
Replacement of Head/Tail Pulleys/ Idlers/ Coc Shaft of Coal Feeder

16

-

-

... More
Servicing of Feeder Inlet/Outlet Gates/ Bunker Outlet Gates

16

-

-

... More
Feeder Bearing Replacement

16

-

-

... More
Attend Breakdown of Feeder

16

-

-

... More
Removal of choking from Coal Pipe

64

-

-

... More
Replacement of Center Feed Pipe Coupling Area with SS Spool Piece

16

-

-

... More
Replacement Coal Pipe Coupling Gasket/ Coupling Assy

72

-

-

... More
Attending Coal Dust Leakage

40

-

-

... More
Welding/ Patch Welding Work for Repairing

40

-

-

... More
Straight Pipe Rotation/ Replacement of Pulverize Fuel Pipe

32

-

-

... More
Coal Pipe Bend Replacement

32

-

-

... More
Repairing/Adjustment of Fuel Piping Supports/ Hangers

20

-

-

... More
Round the Clock Routine, Preventive & Breakdown Mechanical Maintenance of Coal Mill Rejects System and Its Associated System

-

-

-

... More
Round The Clock Operation PLC (Auto) Room/ Manually from Mill Site and Compressor for Coal Mill Reject Handling System and Routine/ Preventive/ Breakdown Maintenance of Pneumatic Coal Mill Reject Handling System & Compressor with Air Receiver Tank and Air Pipe Lines etc. along with the House Keeping of Reject System and Near by Area. (Like Reject Hoppers, Mill Gear Box, Mill Motor Coupling etc).

2190

-

-

... More
Round the Clock Handling, Lifting and Shifting of Coal Mill Reject from

-

-

-

... More
Mill Floor at ‘0’ Meter.

12000

-

-

... More
Below the Silo

16000

-

-

... More
Routine, Preventive & Breakdown Mechanical Maintenance of ID/FD/PA Fan and Its Associated System as per Scope of Work and Bill of Quantity.

-

-

-

... More
Repairing of ID/FD/PA Fan

24

-

-

... More
Arresting of Lube Oil Leakage (Inside Casing) of ID/FD/PA Fan

12

-

-

... More
Maintenance of Lube Oil System (FD/ PA/ ID)

12

-

-

... More
Maintenance of Mill Seal Air Fan / ID Fan Seal Air Fan

24

-

-

... More
Overhauling of Mill Seal Air Fan/ ID Fan Seal Air Fans

12

-

-

... More
De-Coupling, Coupling and Alignment of Mill Seal Air Fan / ID Fan Seal Air Fan

12

-

-

... More
Routine Maintenance of ID/FD/PA Fans, ECW & APH System during General Shift per Day and Other Miscellaneous Work.

730

-

-

... More
Preventive & Breakdown Mechanical Maintenance of ECW, APH and Its Associated System as per Scope of Work and Bill of Quantity.

-

-

-

... More
Replacement/ Rectification and setting out Board/ Middle Board/ In Board Radial Seal and Circumferential (By Pass) Seals and Plates of Hot End & Cold End of Air Pre- Heater.

100

-

-

... More
Repairing/ Replacement of Static Seal Plates by Fabrication, Cutting, Grinding, Welding of Hot End & Cold End of APH for Sector Plate.

4

-

-

... More
Repairing/ Replacement of Rotor Post Seal of Hot End & Cold End of APH

4

-

-

... More
Resetting/ Replacement of Axial Seal and Leveling of Axial Seal Plate by means of Adjusting Bolt in APH

40

-

-

... More
Servicing of Lube Oil System of Guide/ Support Bearing of APH. One Job include One Lube Oil System.

8

-

-

... More
Replacement of Guide Bearing

2

-

-

... More
Replacement of Support Bearing

2

-

-

... More
Replacement of Guide Trunion

2

-

-

... More
Inspection & Housing Level Checking of Support Bearing or Guide Bearing of APH

16

-

-

... More
Air Seal Housing Inspection and Replacement of Packing Rope of Guide or Support Bearing

16

-

-

... More
Inspection of Gear Box, Drive Pinion & Pin Rack

36

-

-

... More
Gear Boxes overhauling (RDU/SDU)

8

-

-

... More
PM of Air Motor and Associated Valves/ Lines of APH

24

-

-

... More
Servicing/ Replacement of Air Motor and Associated Valves/ Lines

4

-

-

... More
Repair/ Cleaning or Replacement of APH Wash and Fire-Fighting Lines

4

-

-

... More
Trial Run of Air Heater

4

-

-

... More
Air Receiver Tanks Testing

4

-

-

... More
Replacement of Main Drive Gear Box

2

-

-

... More
Air Seal Assembly Repair

4

-

-

... More
Rotor Inspection

4

-

-

... More
Overhauling of APH Soot Blowers

8

-

-

... More
Attending Defects of APH Soot Blowers

24

-

-

... More
Servicing of APH Soot Blower

36

-

-

... More
Flange Gasket Replacement of Pipe/ Valves

20

-

-

... More
Replacement of Pumps

10

-

-

... More
Replacement/ Servicing of Bearing of Pumps

8

-

-

... More
Overhauling of Pumps

10

-

-

... More
De-Coupling, Coupling and Alignment of ECW Pumps

8

-

-

... More
Plate Heat Exchanger Inspection/ Replacement

4

-

-

... More
Operation and general upkeep of Boiler Passenger/Goods (02no.) , Service Building (02 nos.), Administration Building (01nos.) & TG Building Passenger Elevator (01no.) & ESP (01no.) Elevator (M/s Techno Industries make) / Stack (Chimney) Elevator (01 no.) (M/s Alikraft Engineers Pvt. Ltd) for 1x660 MW, PTEP.

-

-

-

... More
Round the clock operation and general upkeep of Boiler Passenger cum Goods Elevator & TG Building Passenger Elevator (M/s Techno Industries make) (8:00 Hrs. job basis)

2190

-

-

... More
Round the clock operation and general upkeep of Service Building Elevators & ESP Elevator (M/s Techno Industries make) (8:00 Hrs. job basis)

2190

-

-

... More
Operation and general upkeep of Administration Building Elevators (M/s Techno Industries make) from 8.00 hrs to 20.00 hrs. (12:00 Hrs. job basis)

630

-

-

... More
Operation and general upkeep boiler goods Elevator (01 no.) (M/s techno industries) (8.00 hrs job basis).

200

-

-

... More
Operation and general up keeping of Workshop Machines/Equipments for 1x660 MW, PTEP.

-

-

-

... More
Operation and up keeping of Machine and Equipments (As Listed)

300

-

-

... More
Housekeeping, Workshop Machines Cleaning and oiling and General cleaning of Workshop.

600

-

-

... More
Routine and Preventive Maintenance of Mechanical systems of ESP, for 1x660 MW, PTEP.

-

-

-

... More
Cleaning and sweeping of all railing of ESP top cover and cleaning of double geared motor emitting electrode rapping mechanism. (108 No.)

600

-

-

... More
Cleaning and sweeping of platform between passes and cleaning of doubled geared motor of collecting electrode rapping mechanism.

600

-

-

... More
Checking of oil level and attending oil leakage in all double geared motor of CERM, EERM, GDRM (per week).

104

-

-

... More
Cleaning and sweeping of all stairs railing and platform from ‘o’ mtr. to top of ESP.(twice in a week)

104

-

-

... More
Cleaning and sweeping of outside casing walls between passes.(once in two month)

12

-

-

... More
Inspection and tightening of nut and bolts of CERM, EERM & GDRM if found in loose condition. (once in a week)

104

-

-

... More
Cleaning of ash dust from ESP top roof of one pass, monthly per pass.

144

-

-

... More
Breakdown Maintenance of Mechanical systems of ESP

-

-

-

... More
Cleaning of complete structure, electrodes, shock bar, rapping mechanism, insulators & hoppers from inside of ESP of one field by wire brush, hard broom and old cloth/water washing.

108

-

-

... More
Replacement of rapping hammer.

320

-

-

... More
Replacement of plane bearing of rapping mechanism.

160

-

-

... More
Repairing of rapping shaft.

30

-

-

... More
Straightening of rapping shaft

20

-

-

... More
Replacement of rapping shaft.

8

-

-

... More
Repairing of bent collecting electrodes in ESP chamber in fix position.

80

-

-

... More
Fixing of collecting electrodes with clamp/strip by bolting & welding.

400

-

-

... More
Repair/Replacement of shock bar.

80

-

-

... More
Replacement of shock pads

320

-

-

... More
Repairing of shock bar guide (front/ rear) and shock bar guide attachment by welding or grinding wherever required.

600

-

-

... More
Straightening of bent stay guide bar of collecting structure.

400

-

-

... More
Removal of damaged emitting electrode and fixing the new emitting electrode.

200

-

-

... More
Changing of damaged support Insulator.

80

-

-

... More
Changing of damaged Shaft Insulator.

40

-

-

... More
Alignment of disturbed emitting structure.

60

-

-

... More
Repairing of support insulator screen pipe inside the ESP.

20

-

-

... More
Replacement of asbestos rope of ESP shaft insulators cover.

40

-

-

... More
Replacement of damaged motor gear box of rapping system.

20

-

-

... More
Repairing of damaged rapping gear box.

20

-

-

... More
Repairing of coupling of reduction gear box of collecting/emitting/GD rapping system.

60

-

-

... More
Replacement of asbestos rope of ESP hopper manhole/Casing manhole/ Casing top manhole.

160

-

-

... More
Repairing of manhole by replacing the damaged plate portion with new one.

8

-

-

... More
Repairing of eroded portion by welding in ash hopper, ESP roof and other places inside and outside of the ESP chamber:

400

-

-

... More
Repair/ fixing/welding of ash deflector plate

20

-

-

... More
Repairing/ Re-fabrication of support of duct plate at ESP inlet

20

-

-

... More
Repairing of bracings between ESP inlet gate and GD Screen and rear side of ESP by providing patch at eroded area or changing new piece by bracing pipe as per size.

30

-

-

... More
Repairing /re-fixing of deflector plate on gas distribution screen.

20

-

-

... More
Inspection and checking of ESP field and removal of minor defect.

400

-

-

... More
Repairing of GD Screen.

100

-

-

... More
Servicing of monorail.

6

-

-

... More
Biennial Round the clock routine, preventive & breakdown mechanical maintenance and assisting in operation of RW Pump House, RW Intake PumpHouse , Clarifier Pump House , Pre-Treatment Plant , DM Plant,CPU,STP,NDCT, Effluent Treatment Plant , Hydrogen Plant , and Fire Finding System with Inner Gas System of 1X660 MW, PTEP,Panki, Kanpur.

-

-

-

... More
Round the clock Routine & preventive maintenance and assisting in operation of RW Pump House, RW Intake Pump House , Clarifier Pump House , Pre-Treatment Plant , DM Plant,CPU,STP,NDCT, Effluent Treatment Plant , Hydrogen Plant , and Fire Finding System with Inner Gas System.

2190

-

-

... More
Breakdown mechanical maintenance of RW Pump House, RW Intake PumpHouse , Clarifier Pump House , Pre-Treatment Plant , DM Plant,CPU,STP,NDCT, Effluent Treatment Plant , Hydrogen Plant , and Fire Finding System with Inner Gas System.

-

-

-

... More
Breakdown mechanical maintenance of RW Pump House, RW Intake PumpHouse , Clarifier Pump House , Pre-Treatment Plant , DM Plant ,CPU,STP, Effluent Treatment Plant and other associated work.

-

-

-

... More
Servicing/repairing of Valves (gate/globe/NRV/butterfly/ diaphragm valves) (Dia 100mm).

50

-

-

... More
Servicing/repairing of Valves (gate/globe/NRV/butterfly/ diaphragm valves) ( Dia 100mm- 200mm).

50

-

-

... More
Servicing/repairing of Valves (gate/globe/NRV/butterfly/ diaphragm valves) ( Dia 200mm).

30

-

-

... More
Overhauling of Valves (gate/globe/ NRV/butterfly/ diaphragm valves) (Dia100mm).

30

-

-

... More
Overhauling of Valves (gate/globe/NRV/butterfly/ diaphragm valves ( Dia 100mm- 200mm).

24

-

-

... More
Overhauling of Valves (gate/globe/NRV/butterfly/ diaphragm valves) ( Dia 200mm).

10

-

-

... More
Replacement of Valves (gate/globe/ /butterfly / NRV/ diaphragm valves) (Dia 100mm).

40

-

-

... More
Replacement of Valves (gate/globe/ NRV / butterfly/ diaphragm valves ( Dia 100mm- 200mm).

20

-

-

... More
Replacement of Valves (gate/globe/ NRV /butterfly/ diaphragm valves) ( Dia200mm).

10

-

-

... More
Overhauling of Horizontal Pump: - (DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make-Up, and Pumps associated with PT Plant, DM Plant, ETP Plant. ( Dia 100 mm).

40

-

-

... More
Overhauling of Horizontal Pump: - (DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make-Up, and Pumps associated with PT Plant, DM Plant, ETP Plant.) ( Dia 100 mm- 200mm).

30

-

-

... More
Overhauling of Horizontal Pump: - (DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make-Up, and Pumps associated with PT Plant, DM Plant, ETP Plant.) ( Dia 200mm)

16

-

-

... More
Alignment of Horizontal Pumps(DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make Up, and Pumps associated with PT Plant, DM Plant, ETP Plant.) (Dia 100 mm).

30

-

-

... More
Alignment of Horizontal Pumps(DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make Up, and Pumps associated with PT Plant, DM Plant, ETP Plant.) ( Dia 100 mm- 200mm).

20

-

-

... More
Alignment of Horizontal Pumps(DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make Up, and Pumps associated with PT Plant, DM Plant, ETP Plant.) ( Dia 200mm).

16

-

-

... More
Servicing of Horizontal Pumps:- (DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make Up, and Pumps associated with PT Plant, DM Plant, ETP Plant.) (Dia 100 mm)

30

-

-

... More
Servicing of Horizontal Pumps:- (DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make Up, and Pumps associated with PT Plant, DM Plant, ETP Plant.) (Dia 100 mm-200 mm)

30

-

-

... More
Servicing of Horizontal Pumps:- (DM Make Up, Backwash, Degassed water, Potable Water, CPU Regeneration, Emergency Hot Well Make Up, and Pumps associated with PT Plant, DM Plant, ETP Plant. (Dia 200 mm)

12

-

-

... More
Overhauling of Agitators/Flocculators (of all chemical tanks and clarifiers).

40

-

-

... More
Servicing of Agitators (of all chemical tanks and clarifiers).

50

-

-

... More
Overhauling of Clarifloculator.

6

-

-

... More
Overhauling of Blowers.

28

-

-

... More
Bearing replacement of Blowers.

16

-

-

... More
Belt replacement of Blowers.

24

-

-

... More
Overhauling of Reciprocating pumps.

12

-

-

... More
Servicing of Reciprocating pumps.

12

-

-

... More
Servicing of NRV.

24

-

-

... More
Servicing of Screw pump/Compressor.

12

-

-

... More
Overhauling of Screw pump/Compressor.

12

-

-

... More
Choking Removal of GI Pipes.

16

-

-

... More
Servicing of Water Channel Gates.

16

-

-

... More
Gland replacement of LP Water Pumps.

50

-

-

... More
Attending Defects in Flanges.

20

-

-

... More
Choking Removal of clarifloculator.

20

-

-

... More
Servicing of Clarifloculator Drive.

12

-

-

... More
Repair/Replacement of rail of Clarifloculator/ Electrical Hoist.

4

-

-

... More
Repair/servicing of Clarifloculator Scrapers (Replacement of CCF scrapper structure of ETP & PT-CW Clarifloculator.)

6

-

-

... More
Lifting of water Channel Gates.

20

-

-

... More
Miscellaneous Welding Works.

100

-

-

... More
Replacement of the Cartridge Filter Element of RO / UF Water System.

20

-

-

... More
Inspection, Repair and Replacement of the RO/UF Membranes of RO Water System.

40

-

-

... More
Attending Defects in HDPE pipes.

16

-

-

... More
Laying of HDPE pipes.

40

-

-

... More
Erection/laying of SS Lines.

20

-

-

... More
Replacement of Pressure Vessels for RO/UF of RO Water System.

10

-

-

... More
Replacement of Victaulic coupling/bushes, CPVC Valves & Fitting of RO /UF Water System.

40

-

-

... More
Inspection of Pressure Vessels.

40

-

-

... More
Servicing of V/V gear box .

40

-

-

... More
Cleaning of Tanks ((RO, UF, DM WATER, FILTER WATER & CST WATER TANKS).

16

-

-

... More
Overhauling of Vertical pumps (100 mm – 200 mm).

20

-

-

... More
Overhauling of Vertical pumps (Dia 200 mm–300mm).

10

-

-

... More
Overhauling of Vertical pumps (Dia =300 mm).

8

-

-

... More
Providing a diving team of 3 divers and one supervisor.

4

-

-

... More
Replacement of seal of Butterfly Valves (300mm).

8

-

-

... More
Servicing of Butterfly Valves(300mm).

8

-

-

... More
EOT/Cranes (≤5MT) servicing:-

24

-

-

... More
Cleaning of Pit/Sump.

4

-

-

... More
Replacement of MS piping (100mm- 200mm).

40

-

-

... More
Replacement of MSRL Pipes.

40

-

-

... More
Attending Defects in Expansion Joints (of RW intake/ supply pump etc.)

12

-

-

... More
Laying of ERW Pipes.

40

-

-

... More
Bulk Chemicals (RESINS/Activated carbon/dual media/sand) Hndlg & Stacking.

4

-

-

... More
Overhauling of vessel (Ion exchanger Like SAC/WAC, SBA/WBA, MB, CIP,CPU & CPU Regeneration Vessel /ACF /DMF & Other Vessels.)

20

-

-

... More
Servicing of Air Blower.

24

-

-

... More
Strainer Cleaning/choking removal.

40

-

-

... More
Replacement/filling of Resin (ion exchangers/CPU and Nozzle Replacement work/Carbon replacement in ACF/Repairing work of CPU Vessel).

16

-

-

... More
Servicing of diaphragm chamber/oil pressure relief valves (of alum/coagulant aid dosing pump/chemical dosing pump).

20

-

-

... More
Attending gland leakage of various pumps and valves.

80

-

-

... More
Maintenance of gear box of PT-CW/ETP Clarifier/Floculator.

16

-

-

... More
Coupling Bush replacement and alignment in vertical pump.

16

-

-

... More
Laying of MS pipe line.

30

-

-

... More
Maintenance of Air Vent & A.R.V .

20

-

-

... More
Cleaning of Trash Rack: (RW INTAKE/SUPPLY.P.H): 1set =complete trash rack installed for one no.of pump).

8

-

-

... More
Cleaning of Travelling screen: (RW INTAKE)

8

-

-

... More
PAINTING

20

-

-

... More
Replacement/servicing/repairing of ejectors.

30

-

-

... More
Rubber lining/re-rubber lining of tanks/valves/ pipings /Tee/Bends et.

100

-

-

... More
Re rubber lining of Acid/Alkali/FeCl3/PE /Brine solution/ARU/ CRU/CMB/N.pit/RO/UF cleaning solution etc. dosing/ measuring Tanks with two layer of neoprene rubber each have thickness of 1.5 mm.

50

-

-

... More
Re rubber lining of one stream of cation tank with three layer of neoprene rubber each have thickness of 1.5 mm.

40

-

-

... More
Re rubber lining of one stream of Degasser tank with three layer of neoprene rubber each have thickness of 1.5 mm.

40

-

-

... More
Re rubber lining of one stream of anion tank with three layer of neoprene rubber each have thickness of 1.5 mm.

40

-

-

... More
Re rubber lining of one stream of mixed bed tank with three layer of neoprene rubber each have thickness of 2.5 mm.

30

-

-

... More
Rubber lining/ re- rubber lining of pipe/ bends/ Tee including both side flanges etc. (including fabrication works for flanges joining) with new pipe having sizes from 25 NB to 250 NB. (Running Meter measured at center line of pipes used).

80

-

-

... More
Protective coating of Epoxy paint including removal of old paint, rusted surface, preparation of surface by sand blasting, two coat of epoxy primer and two or more coat of epoxy paint on outer surface of Acid storage tanks / Alum Solution Preparation Tank (PAC storage Tank) / DM water stream tanks/structures of Acid / Alkali unloading rack / other vessels / pipes of various sizes / bends / tee’s / and other Misc. work.

100

-

-

... More
Breakdown mechanical maintenance of RW/PW Chlorination system and other associated work.

-

-

-

... More
Servicing of RW chlorinator

4

-

-

... More
Servicing of RW evaporator

4

-

-

... More
Replacement /servicing of RW/PW Remote Vacuum regulator

6

-

-

... More
Replacement /servicing of RW/PW pressure relief valve

4

-

-

... More
Replacement /servicing of RW /PW Flow meter -

4

-

-

... More
Replacement /servicing of RW /PW Flow control valve-

4

-

-

... More
Servicing of PW chlorinator.

4

-

-

... More
Repairing /Servicing of RW Injector assembly with associated NRVs/valves -

6

-

-

... More
Repairing /Servicing of PW Injector assembly with associated NRVs/valves -

6

-

-

... More
Repairing /servicing of PW chlorine dispenser lines of one chlorinator with associated valves & filters -

8

-

-

... More
Repairing /servicing of RW chlorine dispenser lines of one chlorinator with associated valves & filters :-

8

-

-

... More
Repairing /Servicing of valves

20

-

-

... More
Repair of MS pipeline work to arrest leakage-

4

-

-

... More
Repair of HDPE pipeline for RW to arrest leakage of chlorine solution-

8

-

-

... More
Repairing /servicing of RW parshall flume chlorine solution diffuser with associated valves-

8

-

-

... More
Fabrication of lead gaskets ID 13mm, OD :20MM Thickness : 3mm (as per sample)-

4

-

-

... More
Repairing /Servicing of emergency shower with associated pipe line & valve connected to source:-

4

-

-

... More
Servicing of RW line strainers-

8

-

-

... More
Breakdown mechanical maintenance of Natural drought cooling tower system of 1x660 MW, PTEP, Panki Kanpur.

-

-

-

... More
CT Dist Pipe/Nozzles Cleaning

972

-

-

... More
CT Fill Packs/Drift elemanator Cleaning

972

-

-

... More
CT Basin Cleaning (Mechanical cleaning)

4

-

-

... More
Replacement of rubber sealing Ring (Door Seal ) of B/F valve (2800NB)

4

-

-

... More
Servicing of B/F valve 2800NB

4

-

-

... More
Servicing of Centrifugal Vertical Pumps: Sludge disposal pump

4

-

-

... More
Overhauling of Various Vertical Centrifugal Pumps: Sludge disposal pump

4

-

-

... More
Servicing of Stop Log Gate

4

-

-

... More
Breakdown Mechanical maintenance of fire fighting system including IGS of 1x660mw, PTEP, Panki Kanpur.

-

-

-

... More
Maintenance of Hydrant Pump /Spray pump (motor/diesel engine driven).

12

-

-

... More
Maintenance of Jockey Pump.

4

-

-

... More
Maintenance / overhauling of Hydrant /Spray diesel engine

6

-

-

... More
Maintenance / overhauling of Booster diesel engine

2

-

-

... More
Maintenance / repairing of 250/200/150mm C.I. Isolating gate valves (fabricating , fixing & lapping of new brass seat rings in valve body & gate seat after removal of damaged ones, repair /replacement of wedge nut ,spindle, key , keyway ,gears, etc)

40

-

-

... More
Maintenance / repairing of 100/80/65/40 mm C.I. Isolating gate valves (fabricating , fixing & lapping of new brass seat rings in valve body & gate seat after removal of damaged ones, repair /replacement of wedge nut ,spindle, key , keyway ,gears, etc)

100

-

-

... More
Maintenance of 250/200 mm C.I. swing type Non Return Valve

40

-

-

... More
Maintenance of 150/100 mm C.I. swing type Non Return Valve

30

-

-

... More
Maintenance of 80/65 mm C.I. swing type Non Return Valve.

100

-

-

... More
Overhauling(cleaning, repairing , replacement of damaged parts etc) of 150/100mm Y-type Strainer.

20

-

-

... More
Overhauling(cleaning, repairing , replacement of damaged parts etc) of 250mm Basket-type Strainer.

20

-

-

... More
Fabrication & fitting of flap seat of 250/200 mm swing type NRV.

40

-

-

... More
Fabrication & fitting of flap seat of 150/100 mm swing type NRV.

20

-

-

... More
Fabrication & fitting of flap seat of 80/65/40 mm swing type NRV.

60

-

-

... More
Fabrication & fitting of complete hinge-lever of 250/200/150 mm swing type NRV.

30

-

-

... More
Fabrication & fitting of complete hinge-lever of 100/80/65/40 mm swing type NRV.

60

-

-

... More
Filling of gland packing in stuffing box of valves (250-200 mm).

50

-

-

... More
Filling of gland packing in stuffing box of valves (150-50 mm).

120

-

-

... More
Maintenance of Air release valve 25mm/40mm.

20

-

-

... More
Maintenance / overhauling of 150 /100mm Deluge valve.

70

-

-

... More
Maintenance / overhauling of 80 mm Deluge valve.

20

-

-

... More
Maintenance/servicing of 150/100 mm butterfly valve.

80

-

-

... More
Maintenance/servicing of 80 /65 mm butterfly valve.

24

-

-

... More
Maintenance of 100 /80 mm C.I. Isolating Valve installed underground in the chamber.

10

-

-

... More
Maintenance of250/ 200 /150 mm C.I. Isolating Valve installed underground in the chamber

10

-

-

... More
Maintenance of Hydrant valve 63 mm inlet and 63 mm(monitor) outlet.

60

-

-

... More
Maintenance of Foam Pump (Electric /Engine Driven).

4

-

-

... More
Servicing of Diesel Engine of Hydrant/Spray/Booster/Foam pumps.

8

-

-

... More
Maintenance of 80/100 mm Inline Balance Pressure Foam Proportioner).

4

-

-

... More
Maintenance of Foam Maker.

10

-

-

... More
Cleaning & servicing of basket type strainer 150 mm in Fixed Foam pourer pump house/system.

4

-

-

... More
Maintenance of C.S./S.S. valves/check valve (40 mm - 150 mm) in Fixed Foam pourer pump house/system.

16

-

-

... More
Maintenance of Y type Strainer 80/100 NB (S.S.) in Fixed Foam pourer pump house/system.

4

-

-

... More
Maintenance of booster pump(Electric motor/Diesel Engine).

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in Generator Transformers/ Station Transformers/ Unit Auxiliary Transformers/ICT/UT/CHP Transformer.

16

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in Boiler Burner Fronts/Rear

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in Main Oil Tanks & Oil Purifier

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in Clean & Dirty Oil Tanks

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in FGD storage shed.

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system as per scope of work in T- Boiler Feed Pumps and Oil Tank

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in Cable Spreader Room in Main Plant at EI.0.0m/8.5m/13m/27m/ ESP Room .

16

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in Seal oil pumps area.

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system as per scope of work in Fuel Oil Pump House.

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in E.D.G .Set Building.

4

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in Coal Conveyors(section confined with one deluge valve will be treated as one job

48

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in Bowl mill area (system confined with one mill will be treated as one job).

16

-

-

... More
Maintenance/Servicing of complete Auto (Water) spray system in APH area(system confined with one APH will be treated as one job).

4

-

-

... More
Maintenance/Servicing of complete Auto (Water/Foam) spray system in LDO Storage Tanks

8

-

-

... More
Leakage arresting work in underground pipe line at approx. 1.5 meter depth.

10

-

-

... More
Leakage arresting work in water lines laid at ground level.

8

-

-

... More
Leakage arresting work in water lines running overhead.

8

-

-

... More
For arresting leakage in pipe lines laid above ground or inside of trenches by providing clamp.

8

-

-

... More
Maintenance/overhauling of Inert Gas flooding system.

2

-

-

... More
Servicing of Inert Gas flooding system.

4

-

-

... More
Maintenance / repairing of250/ 200/150/100/80 mm C.I. Isolating gate valves (fabricating , fixing & lapping of new brass seat rings in valve body & gate seat after removal of damaged ones, repair /replacement of wedge nut ,spindle, key , keyway ,gears, etc)

40

-

-

... More
Bienneal round the clock & routine collection and preparation of sample and analysis of water/steam/coal/oil/ash/waste water and Monitoring, Recording & maintaining Water Chemistry of 1X660 MW,PTEP, Panki, Kanpur.

-

-

-

... More
Round the clock collection and preparation of sample and analysis of water/steam/coal/oil/ash/waste water and Monitoring, Recording & maintaining Water Chemistry of 1X660 MW,PTEP Panki Kanpur.

2190

-

-

... More
Routine collection and preparation of sample and analysis of water/steam/coal/oil/ash/waste water/flue gas/mill fineness/various components pertaining to pollution etc. and Monitoring, Recording & maintaining Water Chemistry ,calibration of instruments and Standardization of solutions for the special testing.

620

-

-

... More
Round the clock Routine,Operation of CW/ACW Pumps , IAC/SAC/Air Driers, Complete CW Chorination Plant ,Complete CW Treatment Plant , Complete SSF Plant , FOPH System and LDO Unloading Pump House and its accessories and Round the clock Operation and Routine, Preventive, Breakdown maintenance & General cleaning work of HVAC (Heat Ventilation and Air Conditioning) system and Routine, Preventive &Breakdown maintenance of 1.5TR & 2.0 TR Split type Air conditioners& 2.0TR Cassette AC installed in 1x660MW, PTEP-, Panki” for the period of two years.

-

-

-

... More
Round the clock Routine,Operation of CW/ACW Pumps , IAC/SAC/Air Driers, Complete CW Chorination Plant ,Complete CW Treatment Plant , Complete SSF Plant , FOPH System and LDO Unloading Pump House and its accessories.

2190

-

-

... More
Breakdown mechanical maintenance of complete CW/ACW Pumps and its Auxiliaries, IAC/SAC/Air Driers, EOT Cranes/Mono Rail Cranes, Complete CW Chorination Plant ,Complete CW Treatment Plant and Complete SSF Plant , FOPH System and LDO Unloading Pump House and its accessories.

-

-

-

... More
Breakdown mechanical maintenance of of Complete CW Chlorination Plant, CW Treatment Plant & Side Stream Filtration Plant

-

-

-

... More
Servicing of CW chlorinator

6

-

-

... More
Servicing of CW evaporator

6

-

-

... More
Replacement /servicing of CW Remote Vacuum regulator

6

-

-

... More
Replacement /servicing of CW pressure relief valve

4

-

-

... More
Replacement /servicing of CW Flow meter

10

-

-

... More
Replacement /servicing of CW Flow control valve

10

-

-

... More
Replacement /servicing of CW Differential pressure regulator

10

-

-

... More
Servicing/cleaning of CW Cl2 absorption tower with suction duct network

6

-

-

... More
Repairing /Servicing of CW Injector assembly with associated NRVs/valves

8

-

-

... More
Repairing /Servicing of complete tonner manifold of CW with associated valves & expansion cylinders -

20

-

-

... More
Repairing /servicing of CW chlorine dispenser lines of one chlorinator & evaporator with associated valves & filters

20

-

-

... More
Replacement of coupling and Alignment of Booster pump

8

-

-

... More
Replacement of coupling and Alignment of Recirculation pump

8

-

-

... More
Servicing of caustic recirculation pump

4

-

-

... More
Servicing of CW Booster pump

4

-

-

... More
Overhauling of caustic recirculation Booster pump

4

-

-

... More
Overhauling of CW Booster pump

4

-

-

... More
Servicing of caustic Blowers

4

-

-

... More
Overhauling of caustic Blowers

4

-

-

... More
Bearing replacement of different pumps

24

-

-

... More
Bearing replacement of Blower

24

-

-

... More
Repairing /Servicing of valves sizes 0mm-50mm

24

-

-

... More
Maintenance /Servicing of valves sizes50 mm -100 mm

16

-

-

... More
Maintenance /Servicing of valves sizes 100mm -200mm

40

-

-

... More
Repairing /Servicing of PP diaphragm/check valves sizes -0mm- 80mm

4

-

-

... More
Repairing/servicing of CPVC NRV/BALL valve 0mm -50 mm

8

-

-

... More
Repairng/servicing of CPVC BF/Check Valve 100mm-150 mm

4

-

-

... More
Repair of MS pipeline work to arrest leakage

4

-

-

... More
Repair of HDPE pipeline for CW to arrest leakage of chlorine solution

16

-

-

... More
Repairing /servicing of CW Forebay chlorine solution diffuser with associated valves

8

-

-

... More
Replacement of CW chlorinator PVC vacuum pipeline with associated bends, tees, unions, flanges etc

4

-

-

... More
Fabrication of lead gaskets ID 13mm, OD :20MM Thickness : 3mm (as per sample)

4

-

-

... More
Refilling with maintenance /serving of oxygen cylinder and safety set

4

-

-

... More
Repairing /Servicing of emergency shower with associated pipe line & valve connected to source

4

-

-

... More
Servicing of CW line strainers

16

-

-

... More
Attending B/d by re-rubber lining of different pipes, bend, pipes, Tee & Cross

4

-

-

... More
Repairing /Servicing & revisioning of stroke adjustment of Acid dosing pump/scale inhibitor/corrosion inhibitor /biocide dosing pump

4

-

-

... More
Complete cleaning & removal of foreign-material from scale inhibitor /corrosion inhibitor/biocide tanks, their strainer, backwashing of tank & Cleaning & flushing of pipe lines

4

-

-

... More
Repairng/Servicing of agitator of scale inhibitor tank/corrosion tank/bio dispersant tank of dosing system

30

-

-

... More
Repairing/Servicing of acid unloading pumps along with suction and discharge valve

16

-

-

... More
Attending leakage in pipe lines

4

-

-

... More
Repairing/servicing of PTFE NRV/ball/Diaphragm valve (0mm-50 mm)

8

-

-

... More
Painting of Acid Storage Tank, Acid/Scale/ Corrosion inhibitor/ biocide measuring Tanks (Note : Paint and primer is in the contractor scope)

100

-

-

... More
Overhauling of SSF Filter Back wash Pump

4

-

-

... More
Servicing of SSF Filter Back wash Pump

4

-

-

... More
Overhauling of SSF Air blower

4

-

-

... More
Servicing of SSF Air blower

4

-

-

... More
Replacement of Bearing of Filter Back wash Pump

8

-

-

... More
Replacement of Bearing of Filter Back wash blowers

8

-

-

... More
Replacement of coupling, Alignment & balancing of Back wash pumps

8

-

-

... More
Cleaning /removal of mud/sludge from SSF Backwash Water Pit and its disposal

6

-

-

... More
Miscellaneous repairing / welding work of MS Pipe lines

40

-

-

... More
Replacement/ Top up of media (sand ) per m3

300

-

-

... More
Inspection of Pressure Vessels

40

-

-

... More
Cleaning of Pressure Vessels

20

-

-

... More
Gland replacement of Water Pumps

8

-

-

... More
Attending Defects in Flanges

8

-

-

... More
Attending gland leakage of various pumps and valves.

30

-

-

... More
Breakdown Mechanical maintenance of complete CW/ACW Pumps and its Auxiliaries, IAC/SAC/Air Driers, EOT Cranes/Mono Rail Cranes

-

-

-

... More
Decoupling & coupling of motor and CW pump (while motor replacement)/motor removal and fitting of motor of CW pump

6

-

-

... More
Alignment of motor and CW pump

6

-

-

... More
Gland replacement and tightening of glands in stuffing box for arresting leakage in CW pump

6

-

-

... More
Break down maintenance/Overhauling of CW pump

6

-

-

... More
Decoupling & coupling of motor and ACW pump with adjustment of pump lift (while motor replacement)/motor removal and fitting of ACW motor

4

-

-

... More
Alignment of motor and ACW pump

4

-

-

... More
Gland replacement and tightening of glands in stuffing box for arresting leakage in ACW pump

8

-

-

... More
Replacement of thrust bearing/spherical roller bearing

4

-

-

... More
Break down maintenance/Overhauling of ACW pump

4

-

-

... More
Cleaning of screen of CW PUMP

6

-

-

... More
Cleaning of screen of ACW PUMP

4

-

-

... More
Servicing/maintenance of Air release vent (ARV) /NRV/ Isolation valve and attend defect

20

-

-

... More
Servicing/maintenance of Butterfly valve /Glove Valve

20

-

-

... More
Replacement of Rubber sealing ring/gasket of Butterfly /Glove valve valve

60

-

-

... More
Replacement of Expansion bellow

10

-

-

... More
Cleaning of sump pit of CW/ACW Pump

20

-

-

... More
Providing a Diving team of 03 Divers & 01 Supervisor 01 Helper for underwater diving services

12

-

-

... More
Servicing & maintenance work of Service Air Compressor 03nos, Instrument Air Compressors 03nos & Air Driers 03 nos as per site requirement including assistance in A.M.C of above equipments of 1x660 MW, PTEP,Panki.

12

-

-

... More
Servicing of monorail (FOPH) (make- M/s Mangla Hoist , 8 T capacity) & Unloading Pump House

4

-

-

... More
CWPH EOT (60T/5on) , COMPRESSOR House EOT (8T) Crane, - Attend defect

6

-

-

... More
General Cleaning of CW/ACW pump House, CW traetment Plant,SSF,CW clorination Plant and Compressor House

104

-

-

... More
Inspection,Testing &Issue of required Statutory test certificate for CWPH EOT Crane (60/5 T).

4

-

-

... More
Inspection, Testing & Issue of required Statutory test certificate for Compressor House EOT Crane (8 T) 01 no.,make: M/S Mangla Hoist

2

-

-

... More
Inspection, Testing & Issue of required statutory test certificate for FOPH Mono Rail Cranes (8 MT capacity) 01 nos & Unloading Pump House

4

-

-

... More
Routine, Preventive and Breakdown maintenance works, Cleaning works, Decantation of LDO from BTPN rakes & other associated maintenance works of Fuel oil system of 1x660MW PTPS-Extn. for the period of 02 year.

-

-

-

... More
Routine & Preventive maintenance works of fuel oil System

730

-

-

... More
Cleaning of LDO storage tank, Capacity-2000 KL. Completion time-12 days (8 hrs shift).

4

-

-

... More
Cleaning of DOT, Capacity-10 m3. Completion time-02 day (8 hrs shift).

2

-

-

... More
Daily cleaning of fuel oil pump house area, Work includes cleaning of all trenches, channel & open drains inside and outside of fuel oil pump house area.

730

-

-

... More
Complete cleaning of LDO Unloading Header . Cleaning also includes Cutting of Vegetation around unloading header and shifting of cutted vegetation in scrap yard or as decided by JE/AE/EE concerns. Completion period-01month=02 jobs.

48

-

-

... More
Cleaning of sump/Pit of FOPH. Completion period-2 day (8 hrs shift).

12

-

-

... More
Break Down Maintenance works of fuel oil system:-.

-

-

-

... More
Servicing of LDO Unloading screw pumps (Installed Qty-5 nos.)

10

-

-

... More
Servicing of LDO pressurizing screw pumps including auxilliary Boiler with PCV (Installed Qty-2 nos.)

4

-

-

... More
Servicing of Vertical Drain oil pump (Installed Qty-2 nos)

4

-

-

... More
Servicing of Vertical Sump pump (Installed Qty-8 no)

16

-

-

... More
Servicing of Gate Valve/Globe Valve/NRVs Size 20mm to 50mm.

6

-

-

... More
Servicing of Gate Valve/Globe Valve/NRVs Size above 50 to 100mm.

6

-

-

... More
Servicing of Gate Valve/Globe Valve/NRVs Size above 100-150mm.

6

-

-

... More
Servicing of Gate Valve/Globe Valve/NRVs Size above 150-200mm

6

-

-

... More
Servicing of Gate Valve/Globe Valve/NRVs Size above 200-450mm.

4

-

-

... More
Replacement of Gate Valve/Globe Valve/NRVs Size 20mm to 50mm.

6

-

-

... More
Replacement of Gate Valve/Globe Valve/NRVs Size above 50mm to 100mm

6

-

-

... More
Replacement of Gate Valve/Globe Valve/NRVs Size above 100 to 150mm

6

-

-

... More
Replacement of Gate Valve/Globe Valve/NRVs Size above 150-200mm

6

-

-

... More
Replacement of Gate Valve/Globe Valve/NRVs to above 200 to450mm

4

-

-

... More
Alignment of LDO pressurizing & unloading pumps.

10

-

-

... More
Replacement of New/serviced LDO pumps.

10

-

-

... More
Repairing/Replacement of PRV/PCV/ pressure release safety valve of LDO system (One PRV/PCV/PRS valve makes one number Job.)

10

-

-

... More
Cleaning of Strainer of LDO pressurizing & unloading pumps

48

-

-

... More
Decantation of LDO from BTPN rakes by making connection for unloading and making disconnection after unloading.

30000

-

-

... More
Decantation of LDO from Road Tankers by making connection for unloading and making disconnection after unloading.

7000

-

-

... More
Round the clock Operation and Routine, Preventive, Breakdown maintenance & General cleaning work of HVAC (Heat Ventilation and Air Conditioning) system and Routine, Preventive &Breakdown maintenance of 1.5TR & 2.0 TR Split type Air conditioners& 2.0TR Cassette AC installed in 1x660MW, PTEP-, Panki” for the period of two years.

-

-

-

... More
Round the clock Operation and Routine, Preventive, Breakdown maintenance & general cleaning work of HVAC (Heat Ventilation and Air Conditioning) system of 1x660MW, PTEP- Panki for two years

730

-

-

... More
Routine, Preventive & Breakdown maintenance of 1.5TR, 2.0TR Split type& 2.0TR Cassette Air conditioners installed in 1x660MW, PTEP-, Panki” for the period of two years

-

-

-

... More
Routine servicing of 1.5TR (Qty-53 Nos), 2.0TR (Qty-71 Nos) Split type Air conditioners and 2.0 TR (Qty-03 Nos) Cassette Air Conditioner installed in 1X660MW, PTEP, Panki, Kanpur. (Approx.Total 131 Nos. Split AC)

1048

-

-

... More
Breakdown maintenance of damaged/defective spare parts of 1.5/ 2.0 TR Split type Air &and 2.0 TRCassette Air Conditioner installed at CPU regeneration Building,DM plant Control Room ,clarified water building, CWPH, Raw water Pump house , Raw water Intake ,fuel oil handling/ Unloading ,Training centre, Chemical Lab , fire station, Gate house , Dispensary , store building,, SO2 Analiser, Canteen Building etc. in BOP area of 1x660MW, PTEP, Panki, Kanpur

-

-

-

... More
Replacement of 1.5 Ton burnt compressor with gas charging (R-32).

4

-

-

... More
Replacement of 2.0 TR Split/ 2.0TR Cassette AC burnt compressor with gas charging (R-32).

6

-

-

... More
Gas charging in 1.5 Ton Compressor (R- 32).

6

-

-

... More
Gas charging in 2.0 TR Compressor of Split and Cassette Type AC (R-32).

8

-

-

... More
Replacement of Strainer filter of 2.0 TR split type & Cassette Air conditioner

8

-

-

... More
Replacement of Strainer filter of 1.5 Ton Split AC

8

-

-

... More
Replacement of Starting capacitor/ running capacitor of 2.0 TR split type & Cassette Air conditioner capacitor of 2.0/3.0 Ton split type Air conditioner

12

-

-

... More
Replacement of Starting capacitor/ running capacitor of 1.5 Ton split AC

6

-

-

... More
Replacement of Thermostat of 2.0 TR split type & Cassette Air conditioner

12

-

-

... More
Replacement of Thermostat of 1.5 Ton split type Air conditioner

6

-

-

... More
Replacement of Blade of fan blower of 2.0TR split type & Cassette Air conditioner

6

-

-

... More
Replacement of Blade of fan blower of 1.5 Ton split type Air conditioner

4

-

-

... More
Replacement of Fan motor capacitor of 2.0 TR split type & Cassette Air conditioner/3.0Ton split type Air conditioner

12

-

-

... More
Replacement of Fan motor capacitor of 1.5 Ton split type Air conditioner

8

-

-

... More
Rewinding of outer blower motor of 1.5/2.0 TR split type & Cassette Air conditioner

10

-

-

... More
Rewinding of inner blower motor of 1.5/2.0 TR split type & Cassette Air conditioner

10

-

-

... More
Replacement of Starting relay of 2.0TR split type & Cassette Air conditioner

12

-

-

... More
Replacement of Starting relay of 1.5 Ton split type Air conditioner

6

-

-

... More
Repairing of PCB 1.5/2.0 TR split type & Cassette Air conditioner

12

-

-

... More
Replacement of PCB 1.5/2.0 TR split type & Cassette Air conditioner

6

-

-

... More
Repairing of Remote kit of 1.5/2.0TR split type & Cassette Air conditioner

12

-

-

... More
Replacement of Remote kit of 1.5/2.0/ TR split type & Cassette Air conditioner

6

-

-

... More
Top up of refrigerant of unit as per requirement (R-32).

100

-

-

... More
Shifting of wall mounted complete Split AC of 1.5TR, 2.0TR Split Type & 2.0 TR Cassette Air Conditioner as per requirement of site, including supply of inlet/outlet copper piping with insulation, cutting, brazing & gas charging. Supply of inlet/outlet copper piping, insulation material, brazing & gas charging will be in the contractor scope.

10

-

-

... More
Replacement of Condenser/Evaporator coil of 1.5 TR AC

4

-

-

... More
Replacement of Condenser/Evaporator coil of 2.0 Ton Split AC

4

-

-

... More
Replacement of Condenser/Evaporator coil of 2.0 Ton Cassette AC

4

-

-

... More
Replacement of Fan Motor of 1.5 ton AC

6

-

-

... More
Replacement of Fan Motor of 2.0 TR split type & Cassette Air conditioner

6

-

-

... More
Engagement of Field Operation Assistant (Operator) in shift (Round the clock) for assistance in operational activities from Unit Control room (CCR) of 1X660 MW, PTEP - Panki, Kanpur

-

-

-

... More
Engagement of Field Operation Assistant (Operator) in shift(Round the clock) for assistance in operational activities from Unit Control room(CCR) of 1X660 MW, PTEP, Panki Kanpur, {Each shift will be of 08 Hrs. and in 24 Hrs.(Day & Night) total 03 shifts will be carried-out and so in one year total shifts = 3X 365 = 1095 Shifts)}

2190

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.