Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Environmental Service
Eprocure
Opening Date22 Oct 2024
Closing Date21 Nov 2024
Tender Amount₹ 2,59,15,830 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Complete cleaning of outer surface of hoppers, walls, equipment’s of ESP & DFA system and pipelines in ESP of 2X500 M.W. ‘B' TPS, Anpara & General upkeep of the silo area of DFA Extraction Plant (located outside of plant premises).

730

-

-

... More
Replacement /revisioning of bearing/rotor/DE & NDE bush / DE shaft/end cover of rotary air lock valve.

192

-

-

... More
Replacement of damaged blade of rotor of rotary air lock valve.

192

-

-

... More
Repairing of damaged/squeezed blades of rotor of rotary air lock valve by gas heating & pressing to bring them back in their original shape/angle.

192

-

-

... More
Replacement of rotary air lock valve by new / repaired one.

12

-

-

... More
Repairing of rotary vane shaft by welding with SS electrode (SS-304) and matching.

20

-

-

... More
Repairing of end cover of rotary air lock valve by filling of material with cast iron electrode in the eroded portion and machining of end cover.

20

-

-

... More
Repairing of cracked cast iron body/flange of rotary air lock valve by welding with CI electrode and machining /grinding of the same.

12

-

-

... More
Servicing of Gear Box of rotary air lock valve including replacement of damaged part if any.

20

-

-

... More
Replacement of Gear Box of rotary air lock valve by new/serviced/repaired gear box.

20

-

-

... More
Attending leakage from ash pan by providing patch and welding with MS electrode.

200

-

-

... More
Minor repairing of large/medium/small flushing apparatus of ESP/APH/FG duct/chimney hoppers.

128

-

-

... More
Replacement / servicing of nozzle tips of flushing pan.

598

-

-

... More
Repairing of deflected / damaged grating of sluiceways / drains of ESP area by cutting and welding / heating with gas and hammering. Big size: 1300 mm X 1000 mm.

36

-

-

... More
Repairing of deflected / damaged grating of sluiceways / drains of ESP area by cutting and welding / heating with gas and hammering. Small size: 1000 mm X 1000 mm.

36

-

-

... More
Cleaning of ash trenches of ESP area along with tightening of nut & bolts of liners of sluiceways.

64

-

-

... More
Repairing / attending leakages of miscellaneous pipes /discharge pipes, equipment by patch welding with MS electrode.

200

-

-

... More
Repairing of nozzle pipe / nozzle holder assembly of flushing pan.

100

-

-

... More
Repairing of Expansion bellows by hammering, grinding and welding.

192

-

-

... More
Cleaning of trenches of economizer/ APH / FG duct hoppers.

8

-

-

... More
Cleaning of chimney duct hopper trenches and its surrounding area.

4

-

-

... More
Cleaning of main sluiceways of ESP area located at south of ESP.

4

-

-

... More
Replacement / repairing of following wear plates of large/ medium / small size flushing pans: Base wear plate.

20

-

-

... More
Replacement / repairing of following wear plates of large/ medium / small size flushing pans: Side wear plate.

40

-

-

... More
Replacement / repairing of following wear plates of large/ medium / small size flushing pans: vertical wear plate.

20

-

-

... More
Replacement of gasket / jointing sheet of plate valve installed in transition pipe of large/ medium/ small size flushing pan.

192

-

-

... More
Replacement of flange gaskets of LP water line / header in ESP area.

192

-

-

... More
Checking & inspection thoroughly inside and outside, cleaning of large size flushing pan after dismantling and refitting of the same.

192

-

-

... More
Checking & inspection thoroughly inside and outside, cleaning of medium and small size flushing pan after dismantling and refitting of the same.

192

-

-

... More
Servicing / replacement of butterfly valves of following sizes: 50 mm NB

200

-

-

... More
Servicing / replacement of butterfly valves of following sizes: 65 / 80 mm NB

60

-

-

... More
Servicing / replacement of butterfly valves of following sizes: 150 mm NB

32

-

-

... More
Servicing / replacement of gate valves installed in service water line. Size: 25 mm NB.

24

-

-

... More
Servicing / replacement of gate valves installed in service water line. Sze:50 mm NB.

12

-

-

... More
Servicing / replacement of gate valves installed in service water line. Size: 80 mm NB.

8

-

-

... More
Servicing/Replacement of plate valve. size: 300 mm NB.

64

-

-

... More
Servicing/Replacement of plate valve. Size: 200 mm NB.

64

-

-

... More
Recouping of flanges / bends /T-bends/ reducers of different size from old / damaged pipe, flushing pans etc. by cutting & smoothening of their rough surface.

9000

-

-

... More
Fabrication of M.S. flanges of different sizes from M.S. plate by gas cutting, chipping, grinding & drilling etc.

4000

-

-

... More
Fabrication and erection / repairing of steel structure of different steel sections.

2

-

-

... More
Providing tapping of different size M.S. /C.S. water pipe.

5000

-

-

... More
Replacement of worn out/damaged MS pipes. Size: 12 mm to 125 mm NB.

16000

-

-

... More
Replacement of worn out/damaged MS pipe. Size: 150 mm to 450 mm NB.

10000

-

-

... More
De-silting/cleaning of various water pipe. Size: 20/25 mm NB.

50

-

-

... More
De-silting/cleaning of various water pipe. Size: 40/50 mm NB.

850

-

-

... More
De-silting/cleaning of various water pipe. Size: 65 mm NB.

400

-

-

... More
De-silting/cleaning of various water pipe.Size:80 mm NB to 150 mm NB.

200

-

-

... More
Dismantling of pipe/valves, supports etc of various sizes by gas cutting and transportation from site-to-site store/scrap yard.

4

-

-

... More
Providing of valve / flanges /bends /reducers /'T'-bends in existing / replaced pipeline as per scope of work.

10000

-

-

... More
Replacement of damaged gaskets of different sizes of flanges of bottom ash evacuation system of ESP, APH, FG duct & chimney as well as of HP/LP water line.

10000

-

-

... More
Replacement of filter cloth and cleaning of fluidizing pads of ESP hoppers

200

-

-

... More
Fabrication & installation of pipe support / clamp of pipeline

20

-

-

... More
Fabrication & replacement of 300 mm NB transition pipes of hoppers of 1st to 3rd row of ESP.

50

-

-

... More
Fabrication & replacement of 200 mm NB transition pipes of hoppers of 4th to 7th row of ESP and FG duct /APH /chimney.

50

-

-

... More
Fabrication & replacement of 200 mm NB transition pipes of hoppers of FG duct /APH /chimney.

8

-

-

... More
Painting with one coat of red oxide primer & two coats of reputed make synthetic enamel paint of approved colour on pipe and steel structure.

400

-

-

... More
Fabrication of bellow type expansion joints for 1st to 3rd row of ESP hoppers of Unit No. 4&5.

64

-

-

... More
Fabrication of bellow type expansion joints for 4th to 7th row of ESP hoppers and for APH/FG duct hoppers of Unit No. 4&5.

60

-

-

... More
Erection of bellow type expansion joints for 1st to 3rd row of ESP hoppers of Unit No. 4&5.

64

-

-

... More
Erection of bellow type expansion joints for 4th to 7th row of ESP hoppers and for APH/FG duct hoppers of Unit No. 4&5.

60

-

-

... More
Fabrication of M.S. pipe bends, reducers & 'T'-bends of different sizes.

5000

-

-

... More
Fabrication of Large Size Flushing Apparatus including its 250 mm NB discharge bends for 1st to 3rd Row of ESP hoppers of unit # 4 & 5.

26

-

-

... More
Fabrication of small/ medium size Flushing Apparatus of APH/FG duct hoppers including its 150 mm NB discharge bends of unit No. 4 &5.

26

-

-

... More
Major repairing of large size flushing apparatus of ESP hoppers.

16

-

-

... More
Major repairing of medium size flushing apparatus of ESP hoppers

12

-

-

... More
Major repairing of small size flushing apparatus of APH/FG duct/Chimney hoppers

16

-

-

... More
Erection of Large Size fabricated/major repaired Flushing Apparatus for 1st to 3rd Row of ESP hoppers of unit # 4 & 5.

32

-

-

... More
Erection of small/medium size Flushing Apparatus of APH / FG duct/ESP hoppers of unit No. 4 & 5.

26

-

-

... More
Painting of large size flushing apparatus.

10

-

-

... More
Painting of Small/ Medium size flushing apparatus.

10

-

-

... More
Complete overhauling of rotary air lock valve, chain, sprocket drive etc. by checking, replacement & cleaning of all parts from NDE side to DE side

96

-

-

... More
Replacement / refitting of sluice ways liners of 12" size

50

-

-

... More
Overhauling of medium/small size flushing pans by repairing / replacement of liners and nozzles/nozzle pipe/base plate, manhole cover to discharge end pipe by cutting and welding.

20

-

-

... More
Overhauling of large size flushing pans by repairing / replacement of liners and nozzles/nozzle pipe/base plate, manhole cover to discharge end pipe by cutting and welding

48

-

-

... More
Complete overhauling of fluidizing valve of ESP hopper by dismantling the pipe, servicing of airline valves, repairing/replacement of worn-out parts.

224

-

-

... More
Servicing of fluidizing pads installed inside the ESP hoppers by dismantling, cleaning of membrane/ strainer etc and refitting.

448

-

-

... More
Dismantling of transition pipe of size 200 mm NB of medium/small size flushing pans for washing of electrodes of ESP during overhauling/long shut down of unit & refitting

136

-

-

... More
Removal of choking of chimney hoppers by inserting pressurising water jet through the bypass opening, poking and evacuation of ash heap including of cleaning of sprinkled ash / slurry in the ground floor of chimney hopper area

4

-

-

... More
Round the clock PLC based operation of Ash Water Recirculation System at AWRS Pump house, Anpara

2190

-

-

... More
Routine & preventive maintenance of 9 Nos. (VT Multistage) Ash water recirculation Pumps, 3 Nos Submersible pumps etc. and associated equipment’s

2190

-

-

... More
Daily checking & maintenance of ABB make 0.4 kv modules of switch gear rooms of AWRS System

730

-

-

... More
To carry out internal and external cleaning of AWRS Electrical panels MCCs, JB's etc

100

-

-

... More
Maintenance of control & instrumentation field equipment’s of ash water recirculation system of 'A' & 'B'TPS, Anpara.

24

-

-

... More
Cleaning & Removal of Dust, Cobweb& Grease/Oil etc. From ash water recirculation pumps And Other Connected Equipment’s, Pipes and Valves Inside the Pump House and Valves System.

30

-

-

... More
General Upkeep of Floor, Walls and Roof of Ash Water Recirculation Pump House, Control Room, Switch Gear Room, External Cleaning of Electrical Panels etc.

730

-

-

... More
Removal Choking of Septic Tank / Sewage Line Up to Septic Tank for Proper Flushing of Sewage from Toilets Located in Ash Water Recirculation Pump House.

8

-

-

... More
Complete servicing/ overhauling including replacement of worn-out parts of AWRS pump.

26

-

-

... More
Checking and servicing / replacement of ball/Thrust roller bearings of AWRS pumps.

26

-

-

... More
Complete Servicing / overhauling including replacement of worn-out parts of Sump pumps of AWRS.

6

-

-

... More
Complete overhauling of SS Gates of channel of AWRS.

6

-

-

... More
Complete overhauling of overhead cranes of AWRS pump house.

4

-

-

... More
Dewatering and cleaning and AWRS Sump pits including digging of wet sludge and disposal of the same.

12

-

-

... More
Servicing of gate valve of 250/ 350 mm NB.

40

-

-

... More
Overhauling of air release vents of 800 mm Dia AWRS pipes.

18

-

-

... More
Servicing of non-return valve of 150 mm NB.

6

-

-

... More
Servicing of non-return valve of 350 mm NB.

18

-

-

... More
Servicing of butterfly valves of AWRS Pipelines of 800 mm NB.

12

-

-

... More
Maintenance of motors of up to 275 Kw of AWRS system. Complete overhauling of LT Motor

6

-

-

... More
Rewinding of 0.4 KV motor above 5 KW up to 275 KW (rate is to be quoted in Rs. /KW).

550

-

-

... More
Tightening of connection plates of 0.4 kv motors (one job means tightening of connection plates of one motor)

8

-

-

... More
Revisioning of cooling /fans tightening.

8

-

-

... More
Cable box / terminal box repair, change of insulation / leads etc.

6

-

-

... More
Rewinding of motor/ replacement of bearing of ceiling fans.

6

-

-

... More
Rewinding of motors above 1 KW up to 5 KW.

4

-

-

... More
Break down maintenance due to flashover on any portion of the bus bar including re-commissioning in LT Switchgear.

6

-

-

... More
Overhauling/break down maintenance of breakers including replacement of defective parts in LT Switchgear.

8

-

-

... More
Replacement of HT/LT, Neutral bushing/ Gasket of transformer .

6

-

-

... More
Arresting oil leakage from radiators and associated pipelines and valves etc.

4

-

-

... More
Centrifuging of transformer oil of transformer/ storage tank.

4

-

-

... More
Overhauling of L.T. Transformer.

4

-

-

... More
Dismantling and reassembling of breaker (0.4 KV).

10

-

-

... More
Cleaning of transformer yard area and its surroundings.

4

-

-

... More
Testing/replacement of 11/33 KV CT/PT & its connected circuit.

6

-

-

... More
Daily routine/Preventive maintenance works, up keeping, attending faults of minor nature of submerged scrapper conveyor, clinker grinder, furnace bottom ash hopper gates, their hydraulic drive/actuator system and their associated equipment’s round the clock. One job includes the above work in three shifts (one shift is of duration 8.00 hrs.) in a day for one unit of 2X500 MW.

1400

-

-

... More
Disposal of ash/clinker debris from the oversize bund of furnace bottom ash disposal system by tractor, trolly, truck at a distance of 2.5 KM to 3.0 KM radius within the premises of powerhouse. (The above work also includes the removal of ash/clinker, debris and cleaning of floor nearby the SSC and equipments e.g. power pack, ash gates, supporting structures of ash hooper & SSC etc. with water/clothe in case of breakdown of SSC/clinker grinder & ash hopper gates etc.)

15000

-

-

... More
Reclamation/ Repairing of old & used worn out flight bar of Submerged Scraper Conveyor of Furnace Bottom Ash Disposal System in unit no. 4 & 5, 2x500 MW, BTPS, Anpara.

400

-

-

... More
Complete servicing of Ash Gate hydraulic cylinder with connected oil actuator and oil supply lines.

8

-

-

... More
Cutting of elongated chain link, refitting of chain links and successful trial Run of SSC.

110

-

-

... More
Dismantling and replacement /reversing and refitting of flight bar with new / workable/repaired flight bar & successful trial run of SSC.

600

-

-

... More
Straightening of bent &distorted flight bars with the help of heating torch and hydraulic jack.

400

-

-

... More
Remounting of SSC chain in case of dislocation of chain from sprocket Head end snub shaft /bottom/top trough /tail end rollers and its successful trial run.

180

-

-

... More
Repairing & re-strengthening by welding on different sizes of pipes, ash Hopper casing, SSC body etc. double coat (run) with suitable welding.

300

-

-

... More
Replacement/servicing of bearing of clinker grinder after removing Bearing housing &cleaning of grease &re-grease.

8

-

-

... More
Replacement/servicing of bearing of Head end shaft assembly and alignment if required & successful trial run.

4

-

-

... More
Replacement/servicing of bearing of head end snub shaft/bottom trough shaft/tail end shaft, alignment of rollers and successful trial run.

4

-

-

... More
Complete servicing of hydraulic chain tensioning unit including cleaning oil replacement of reservoir, seals replacement on hydraulic rams of Chain tensioner, servicing of pressure relieves valves etc. and its successful trial run.

8

-

-

... More
Replacement of Hydraulic cylinder of chain tensioning unit.

8

-

-

... More
Repairing/replacement of damaged oil pipelines of hydraulic chain tensioning unit/ ash gate actuator by cutting it with grinder preparation of 'V' for welding & welding with suitable electrode.

4

-

-

... More
Replacement of defective oil hose pipe of hydraulic chain tensioning unit/ ash gate actuator, clinker grinder/SSC hydraulic motor etc.

4

-

-

... More
Overhauling of Head shaft assembly /replacement of defective parts with new /old healthy parts.

4

-

-

... More
Complete servicing /replacement of damaged parts of top trough stub shaft assy. Including cover plate.

64

-

-

... More
Alignment of old chain/replacement of chain of SSC with new one.

640

-

-

... More
Servicing/Replacement of hydraulic pump of clinker grinder and its successful. trial run.

8

-

-

... More
Fabrication/Repairing of thrust washer of stub shaft roller assembly

64

-

-

... More
Servicing/Repairing/Replacement of spidex insert / coupling of SSC, Clinker Grinder/Ash Gate.

8

-

-

... More
Servicing/Replacement of oil pump of hopper ash gate & its successful trial run.

6

-

-

... More
Servicing/Replacement of oil pump of SSC & its successful trial run.

8

-

-

... More
Cleaning of seal trough of boiler.

14

-

-

... More
Evacuation of SSC body in case of breakdown by taking out all the ash/ clinker manually.

36

-

-

... More
Cleaning of inner & outer filters power pack system.

8

-

-

... More
Servicing of hydraulic motor of clinker grinder & its successful trial run.

2

-

-

... More
Replacement of oil seals of hydraulic motor of SSC & its successful trial run.

2

-

-

... More
Repairing of rollers of top trough shaft, tail end shaft, idler shaft assy.

16

-

-

... More
Repairing /servicing /replacement of quenching nozzle body.

8

-

-

... More
Closing & opening of ash discharge gate of furnace bottom ash hopper manually.

16

-

-

... More
Repairing /servicing of sight peep holes.

4

-

-

... More
Cleaning/ Flushing of bottom ash hopper spray drain collecting pipe.

4

-

-

... More
Servicing of valves of water line of FBAD system.

3600

-

-

... More
Repair. of top trough shaft by welding and machining to finished surface.

8

-

-

... More
Replacement of hydraulic motor of SSC.

2

-

-

... More
Removal of chocking of furnace bottom ash hopper.

12

-

-

... More
Repairing/servicing/ replacement of rollers of snub/idler shaft of bottom trough & tail end shaft. It includes -(a) Removal of shaft from the SSC.(b) Removal of rollers from the shaft(c) Build-up of worn-out portion with the help of welding with suitable electrode.(d) Grinding/machining of the rollers to achieve smooth surface.(e) Refitting of the rollers on the shaft.(f) Refitting of the shaft on the SSC body.

2

-

-

... More
Repairing /fabrication &erection of grating at the discharge of ash/clinker from the SSC to the clinker grinder.

8

-

-

... More
Flushing of cooling pipeline for oil cooler and bush bearing of stub Shaft assly.

4

-

-

... More
Repairing/fabrication &erection of liner plate near head end shaft /return idler shaft.

8

-

-

... More
Patch work on worn out portion of furnace bottom ash hopper, discharge chute of SSC body over the clinker grinder and clinker grinder chute.

16

-

-

... More
Fixing of new tiles/Ms plate in place of worn-out tiles over the mother plate of SSC. It includes(a) Provide scaffolding where ever required for removal of worn tiles.(b) Removal of tiles & its fixing material from the mother plate.© Grinding of mother plate for smooth surface.(d) Cutting of the tiles in the required shape with the help of diamond cutting machine.(e) Fixing of new tiles and leveling them after applying fixing material over the mother plate & successful trial run of SSC.

40

-

-

... More
Repairing /servicing/replacement of bearing housing & its assembly of top trough stub shaft assy. It includes (a) Removal of bearing housing assy. And its dismantling. (b) Build-up of worn out portion with the help of suitable electrode.© Grinding/machining of the bearing housing assembly to achieve smooth surface and profile.(d) Refitting of bearing housing assy. with stub shaft and it successful trial run.

12

-

-

... More
Repairing of drain collecting pipe assy. of furnace bottom ash hopper.

2

-

-

... More
Servicing/Replacement of Hydraulic Motor (Model: CA 50) of Clinker grinder.

2

-

-

... More
Replacement of old, used and worn-out snub/tail end/idler shaft of SSC.

4

-

-

... More
Replacement of old and clogged seeping water line to various aux. of FBAD system.

400

-

-

... More
Cleaning of pipeline.

60

-

-

... More
Fabrication of the flange with the help of MS plate.40 mm NB.

24

-

-

... More
Welding works of joining pipe to pipe for lying of pipeline per joint. Size: 50mm NB.

20

-

-

... More
Welding works of joining pipe to pipe for lying of pipeline per joint. Size: 40 mm NB.

24

-

-

... More
Welding works of joining pipe to pipe for lying of pipeline per joint. Size: 25 mm NB.

32

-

-

... More
Welding works of joining pipe to pipe for lying of pipeline per joint. Size: 15 mm NB.

60

-

-

... More
Fabrication of bends with the help of cutting of pipe into desired section & its welding. Size: 50 mm NB.

64

-

-

... More
Fabrication of bends with the help of cutting of pipe into desired section & its welding. Size: 40 mm NB

16

-

-

... More
Erection of valves in the pipeline after revisioning of the valve. Size:40 mm NB.

12

-

-

... More
Erection of valves in the pipeline after revisioning of the valve. Size: 25 mm NB.

32

-

-

... More
Fabrication of pipe support by welding the angle / channel and other Steel sections and its grouting as & when required.

24

-

-

... More
Laying alignment of pipeline of size 150/100mm for different location.

440

-

-

... More
Painting of outer surface of pipeline with coat of primer and two coat of paint with approved color and quality of synthetic enamel. Paint after surface preparation.

120

-

-

... More
Replacement /Repairing of Chain protection angle at bottom of both side wall of Top trough.

4

-

-

... More
Replacement of the valves of water lines of FBAD system.

50

-

-

... More
Replacement of water let nozzle of chain cleaning line.

8

-

-

... More
Repairing/Fabrication &erection of eroded flap at the discharge of ash/clinker from the SSC to the clinker grinder.

4

-

-

... More
Repairing of guide wheel protection box.

4

-

-

... More
Servicing of furnace bottom ash hopper gate with roller assembly.

6

-

-

... More
Servicing of spur gear of clinker grinder & its successful trial run.

2

-

-

... More
Complete overhauling of clinker grinder.

8

-

-

... More
Provide scaffolding inside the complete bottom ash hopper for different works in FBAD system.

2

-

-

... More
Removal of clinker grinder with complete hydraulic motor assly. from its position for maintenance works and replacing the same on its position after completion of work.

6

-

-

... More
Removal of SSC complete assy. from its position for maintenance. Works & replacing the same on its original position there after servicing of travelling wheels of the SSC body.

2

-

-

... More
Fabrication and erection of steel structures to facilitate the various maintenance works of furnace bottom ash disposal system.

2

-

-

... More
Fabrication and erection of chute and body of clinker grinder of FBAD System.

2

-

-

... More
Fabrication and erection of furnace bottom ash hopper (inner & outer) Chute and refitting in same position.

2

-

-

... More
Repairing of Drive and Driven shaft of clinker grinder.

2

-

-

... More
Replacement of new/repaired furnace bottom ash hopper gate of FBAD System.

2

-

-

... More
Repairing of old & used worn-out teeth and collar of clinker grinder teeth segment of clinker grinder of 2X500MW, BTPS, Anpara.

8

-

-

... More
Dismantling, Servicing, Fabrication/Repairing of damaged parts, assembling of Hydraulically operated Bottom Ash Hopper Discharge gate of 2x500MW, BTPS, Anpara.

2

-

-

... More
Reclamation/Repairing of various critical old and used, worn out head end shafts of Submerged Scrapper Conveyor of Furnace Bottom Ash Disposal System of 2x500MW, BTPS.

2

-

-

... More
Reclamation/Repairing of various critical old and used, worn out tail end shafts of Submerged Scrapper Conveyor of Furnace Bottom Ash Disposal System of 2x500MW, BTPS.

2

-

-

... More
Reclamation/Repairing of various critical old and used, worn out Snub / Idler Shaft of Submerged Scrapper Conveyor of Furnace Bottom Ash Disposal System of 2x500MW, BTPS.

2

-

-

... More
Reclamation/Repairing of old, used and worn-out chain drive sprockets of Submerged Scrapper Conveyor of Furnace Bottom Ash Disposal System of 2x500MW, BTPS, Anpara.

4

-

-

... More
Dismantling, servicing, fabrication of damaged parts, Assembling of Hydraulic pump of SSC of furnace Bottom Disposal system.

4

-

-

... More
Dismantling, Servicing, Fabrication of damaged parts, Assembling of hydraulic pump of Clinker Grinder of furnace bottom ash disposal system.

4

-

-

... More
Dismantling, servicing, fabrication of damaged parts & assembling of hydraulic motor of Clinker Grinder (CA-50) for furnace bottom ash disposal system.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.