If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender
Eprocure
Opening Date17 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 32,55,560
Costs
EMD
₹ 35,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RVUNL_994018_1Bid Award Id
ViewTender No
RFQ-6000007177Tender Authority
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited ViewPurchaser Address
-Website
http://https://uprvunl.org/uprvunl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cleaning of 0 m to 19 m main boiler (from column E to column M) including air heaters and pulverized coal pipes for Unit no. 9,10,11,12 & 13. (Frequency daily except holiday) (One job means work of one unit).
625
-
-
... More
Cleaning of the main boiler (19 m to 35 m) including 36 m level along with grills at 27 m Deaerator floor for unit no. 9,10,11,12 & 13. (Frequency alternate day except holiday (One job means work of one unit).
313
-
-
... More
Cleaning of Milling system for unit no. 9,10,11,12 & 13. (Frequency daily except holiday) (One job means work of one unit).
625
-
-
... More
Cleaning of FD fans & PA fans for unit no. 9,10,11,12 & 13 (Frequency twice in a week) (One job means work of one unit).
217
-
-
... More
Cleaning of ash from outside area of Air pre-heater hoppers for unit no. 9,10,11,12 & 13 (Frequency twice in a week) (One job means work of one unit.)
217
-
-
... More
Cleaning of ash from area outside area of Economizer hoppers unit no. 9,10,11,12 & 13 (Frequency twice in a week) (One job means work of one unit).
217
-
-
... More
Cleaning of ESP control room floor for unit no. 9,10,11,12 & 13. (Frequency daily except holiday) (One job means work of one unit).
625
-
-
... More
Collection & heaping of Ash/Clinker disposed off outside furnace at 0 m floor area for Unit No. 9,10,11,12 & 13.
1570
-
-
... More
Cleaning of T 9 m floor of unit no. 9, 10, 11,12 & 13 including UCBs, Analyzer Thermal control room, Boiler MCC of unit no. 9,10,11,12 & 13 (Frequency daily except holiday) (One job means work of one unit).
625
-
-
... More
Cleaning of spider/cub web of UCB, unit no. 9,10,11,12 & 13, both MCB, turbine equipment’s and auxiliaries at 9m floor, 0m and -4m except walls, ceiling structures (Frequency weekly or as required).
44
-
-
... More
Cleaning of T 0 m area and machines of unit no. 9,10,11,12 & 13 including its 6.6 KV/0.4 KV switch gear room, battery room and 0.4 KV station switch gear room below MCB and air washer room (Frequency Daily except holidays).
250
-
-
... More
Cleaning of floor of -4 m level of turbine side from MCB to unit side (Frequency Daily except holidays).
250
-
-
... More
Cleaning of all staircases from -4 m to 13 m level of Turbine side from MCB to Unit side (Frequency Daily except holidays).
250
-
-
... More
Cleaning of walkway and floor of cable gallery at 5 m level of turbine side including floor of battery rooms and battery charger of unit no. 9,10,11,12 & 13 and cable gallery room their MCB (Frequency Daily except holidays).
250
-
-
... More
Cleaning of T.G hall walls/structure including various columns up to approachable area of TG hall from MCB to Unit no. 9,10,11,12 & 13 (Twice in a week).
87
-
-
... More
Disposal of Ash/garbage/clinker/scrap up to 3 Kg etc. from various locations of boiler unit no. 9,10,11,12 & 13 to scrap yard.
280
-
-
... More
Disposal of ash garbage mixed coal dust from various locations of boiler unit no. 9, 10, 11, 12 &13 to ash disposal yard.
264
-
-
... More
Cleaning of main turbine & generator cover of unit no. 9,10,11,12 & 13 (Daily, except holiday).
625
-
-
... More
Cleaning of crossover pipes, BFP, Cond. Pump, SOP, A/C Lube oil pump, seal oil and lube oil pumps along with all other pumps 0 m level and -4 m level for Unit No. 9, 10, 11, 12 & 13 (Daily except holiday).
625
-
-
... More
Cleaning of erection bay and 0.4 KV S/G room, battery room near 11th unit erection bay of unit 3xx200 MW & unit 2x200MW (Frequency Daily except holidays).
250
-
-
... More
Cleaning of T/F yard of one unit (near GT / UAT). Cleaning of one unit transformer yard means one job for unit 3xx200 MW & unit 2x200MW (Frequency twice in a week).
217
-
-
... More
Cleaning of galleries of offices at 5 m & 9 m floor from MCB to Unit side unit 3xx200 MW & unit 2x200MW (Daily except holidays).
250
-
-
... More
Cleaning of oil from Turbine/Gen. Brg. & seal round the clock will constitute one job in a unit (Daily except holiday).
625
-
-
... More
Cleaning of cooling tower floor area of unit no. 9,10,11,12 & 13. (Frequency twice in a week) (One job means work of one unit).
217
-
-
... More
Cleaning of ID fan area of around of unit no. 9,10,11,12 & 13 (Alternate day except holiday).
313
-
-
... More
Cleaning around ash slurry pumps (As and when required during S/D).
10
-
-
... More
Cleaning of floor area of EP hopper at 0 m level of one unit (For 5x200 MW only) Cleaning one unit means one job. (Daily except holiday).
375
-
-
... More
Cleaning of floor area and building at 0 M level in new compressor house (Daily except holiday).
125
-
-
... More
Cleaning all IR make compressor in new building, (Alternate day or if required day)
65
-
-
... More
Disposal of ash accumulated in canteen near 9th & 13th Unit.
23
-
-
... More
Collection & removal of ash from pump house floor (As and when required during S/D).
3
-
-
... More
Cleaning of ID fan motors LOP System etc. (As and when required during S/D).
15
-
-
... More
Cleaning of M.C.B. Floor area of panel room, compressor room & sump pump house of ATPS and cleaning of table, chair, and glass door of UCB preparing of tea/breakfast/ refreshment to operation personnel (Per shift).
456
-
-
... More
Cleaning of table, chair, and glass door of UCB {2x200 MW), preparing of tea /breakfast/ refreshment to operation personnel per shift & serving of official letters to operation personnel in morning, evening & night shift (Per shift).
456
-
-
... More
Cleaning of area between contractor cabin and unit # 12, 13 around dustbin (Frequency twice in a week).
44
-
-
... More
Cleaning of mechanical workshop ATPS and removing of mud/garbage from unit no.12, 13 both outside galleries Freq. twice in a week.
44
-
-
... More
Cleaning of floor of CW pump house along with grills, gallery of C.W pump house etc. (Frequency twice in a week).
44
-
-
... More
Removal of cub web at the operating floor equipment’s including all the pumps and gallery. Cleaning of all above one time means one job of 2x200 MW (Frequency twice in a week).
44
-
-
... More
Cleaning of Mechanical Workshop, BTPS, Obra (Frequency twice in a week).
44
-
-
... More
Collecting / removing ash from tranches of boiler side whenever there is leakage in pipeline and pump.
84
-
-
... More
Cleaning of floor area at 0 m level D. G. Set house (Frequency Daily except holidays).
125
-
-
... More
Cleaning of new compressor situated in front of GT of Unit no.12,13 (1) Cleaning of floor (Daily except holidays). (2) Cleaning of equipment (Daily except holidays).
125
-
-
... More
Cleaning of newly constructed bay control unit (BCU) of 400 KV S/Yard (Daily except holidays).
125
-
-
... More
Cleaning of floor of -4 m cable gallery from MCB to Unit no.12 (Daily except holidays).
125
-
-
... More
Cleaning of floor of -4 m cable gallery. (a)Unit no.09,10 & 11 (Daily except holidays) OGD-I
(b) Unit no. 12 & 13 (Daily except holidays) OGD-II
250
-
-