Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Agriculture or Forestry Works
Eprocure
Opening Date27 Oct 2020
Closing Date30 Nov 2020
Tender Amount₹ 14,05,129 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Odonil

12

-

276.1

... More
Vim

60

-

60

... More
Napthaline Balls

36

-

112.85

... More
Harpic/ Phenyl

120

-

74.45

... More
NSR- Cleaning of septic tank of 700 users including removal and disposal of waste garbage and disposal within a lead of 2Km. and also including dewatering and cleaning of accessories and removal of chocking, including cost of all materials, labour,T&P etc, complete also removing and placing the cover in position complete

2

-

686.21

... More
NSR- Sweeping and cleaning of rooms labs etc. at various floors such 0.00M, 5.50 M, 11.00M, 16.00M ,21.00M, excluding galleries and lobbies including collection of garbage at specified place at ground level but beyond 100M distance including cost of all materials, labour T&P etc. required for proper completion of work.

1500

-

14.55

... More
NSR- Keeping stair cases neat and clean by cleaning and sweeping the same from (-) 4.00 M to 26.00 M including rubbing and wiping the floors and steps with wet clothes including disposal of garbage at specified place at ground level but beyond 100M distance and also cleaning of all projections structures coming in the galleries such as railing, walls, chipping, windows, foot mat etc. and also removal of pan spots or any other things including cost of all materials, labour T&P etc. required for proper completion of work VIM shall be provided by the deptt. Free of cost when necessary

300

-

21.8

... More
NSR- Keeping neat and clean various galleries and lobbies at 0.00M, 5.00M, 11.00M, 16.00M and 21.00M by cleaning and sweeping including rubbing and wiping the surface with wet clothes including disposal of garbage at specified place at ground level but be yond 100 M distance including cost of all material, labour T&P etc. required for proper completion of work vim shall be supplied by the Deptt. Free of cost whenever necessary to be provided. Rate is also inclusive of cleaning of jhajjas, projections at various floors.

1500

-

17.45

... More
NSR- Cleaning of roofs at 26.00M level along with roof of stair case and all structures around the drinking water tanks area and also parapet as and when required including disposal of garbage at specified place at ground but beyond 100M distance and removing of choking including cost of all material. Labour T&P etc. required for proper completion of work.

12

-

231.1

... More
NSR- Cleaning of dust, dirt and jala (cob web) from floor 0.00 M to 21.00M from the wall surface ceiling or any other structure including cost of all scaffolding consumable T&P etc. also precautionary measure complete.

12

-

145.25

... More
NSR- Contractor shall have to uproot wild vegetation of all kinds of vertical and Horizontal faces of buildings upto first floor of ATPS power house area including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer in Charge.

100

-

53.47

... More
NSR- Cleaning ducts containing various pipes etc. from 0.00 M to 26.00M including disposal of waste materials at specified place at ground level but beyond 100M distance including cost of all materials, labour T&P etc. required for proper completion of work.

12

-

14.55

... More
NSR- Keeping neat and clean by sweeping and cleaning of area in front and south and north sides of service house building lying between / up to the road of 29B+42, 8A+06 and 9A+80 including all platform of car / scooter / cycle stand cooling towers, covers of cable trenches and all drains lying in this area including removing and placing the cover including scrubbing oily surface if necessary and also disposal of garbage at specified place including cost of all material , T & P etc. required for proper completion of work. Rate is also inclusive of cleaning of roofs of car / scooter / cycle stand and sprinkling lime in drain etc.

156

-

72.65

... More
NSR- Same as item no. 12 above but when cleaned /washed by sprinkling / spraying water.

36

-

108.95

... More
NSR- Cleaning of the aluminum / iron glazed doors windows and fixed portion both sides lying in the galleries at various floors but excluding glazing work of the various rooms including removing of posters etc. including cost of all labour, materials, T&P etc. required for proper completion of work as directed by Engineer-incharge.

52

-

36.3

... More
NSR- Cleaning of committee room including rubbing and wiping the floor surface by wet clothes including cost of all materials, labour T&P etc. required for proper completion of work as directed by Engineer-in-charge.

300

-

7.25

... More
NSR- Cleaning of glass panes both sides of fixed portion in the galleries at various floors with the help of colin or sprit including cost of all material, labour T&P etc. required for proper completion of work as per direction of Engineer-in-charge.

4000

-

3.65

... More
NSR- Providing and sprinkling the lime in all drains and in water logging area including cost of all material, labour T&P etc. required for proper completion of work.

6

-

407.3

... More
NSR-Cleaning of the choked C.I. sewer line by Roding from the manhole to manhole including opening and closing of manhole cover and also disposal of sludge within 50 M lead at specified place etc. also including cost of all material,

-

-

-

... More
Up to 100 mm internal dia.

15

-

62.85

... More
100 mm internal dia and above

20

-

88.4

... More
NSR- Pumping of sewage or sludge from man hole / septic tank surface drains and pits and ditches including cost of all labour, T&P etc. required for proper completion of work by using 5HP pump which is to be arranged by the contractor.

100

-

92.25

... More
NSR- Cleaning of manholes connecting pipe of 100mm dia by removing its cover and disposal of waste water and sludge up to a distance of 100M and to put the manhole covers in proper position including the cost of all labour, T&P etc. required for proper completion of work.

36

-

62.85

... More
NSR- Collection & transportation of loose earth , garbage, debries, rock, ash rubbish, grass, brick, bats etc., from different location already ed places for measure ments and its disposal by truck, Tractor, Trolley within 3 KM distance including leveling and dressing of disposed earth in disposal yard and also including cost of all labour ,materials, T&P etc. required for proper completion of work (The rates will be applicable to net qty. after deduction of 20% for voids).

35

-

57.85

... More
PART -A-II- SWEEPING AND CLEANING OF H-TYPE OFFICE SHED COMPLEX INSIDE P.H.AREA AT A.T.P. ANPARA

-

-

-

... More
NSR- Sweeping and cleaning of various roads and their side pateries H-type office shed area including removing of garbage and its disposal within 50M. distance and including cost of all materials labour T&P etc. required for proper completion of work

528000

-

0.9

... More
NSR- Cleaning of Pucca/Katcha drains of various sizes including removal of deposited earth, brick bats, boulders, ash and other debris from the bed of drains and its collection within in a distance of 50 M. from the length clean including cost of all material labour,T&P etc. required for proper completion of work .

-

-

-

... More
Drain of bed width 0.50 M and depth 1.5 M

20300

-

0.3

... More
Drain of bed width 0.50 M to 1.0 M & depth 1.5 M & top width up to 2.50M

15000

-

0.5

... More
NSR- Cleaning of grass including bushes and all kind of wild growth and removal of rubbish from major field road, footpath etc. up to a distance of 50 M out side the periphery of area cleaned.

1625

-

5.6

... More
NSR- Cleaning of toilet of NRB’s like H-Type office shed including washing of floors, wash basin, windows, w.c. seats, pipes etc. with vim, phenyle, odonil, Harpic and also including cleaning of dust, debries, cob web etc. from the walls / ceiling and also removing choking of toilets including all labour, materials T&P etc. required for proper completion of work excluding the cost of vim, Nepthalene, harpic, odonil which shall be paid separately.

-

-

-

... More
Cleaning of toilet consisting two or more in one room of non residential building

1800

-

21.05

... More
Cleaning of toilet consisting one toilet in one room of NRB

4000

-

8.9

... More
NSR- Cleaning and sweeping of NRB’s like H-Type office shed including cleaning of dust , dirt jala (Cob web) from wall surface and ceiling and sweeping of surrounding area as and when required with disposal of garbage into dust bin within 50 M distance including all labour T&P , material etc. required for proper completion of work.

990000

-

16.2

... More
NSR- Collection & transportation of loose earth , garbage, debries, rock, ash rubbish, grass, brick, bats etc., from different location already ed places for measure ments and its disposal by truck, Tractor, Trolley within 3 KM distance including leveling and dressing of disposed earth in disposal yard and also including cost of all labour ,materials, T&P etc. required for proper completion of work (The rates will be applicable to net qty. after deduction of 20% for voids).

50

-

57.85

... More
NSR- Removal of dead body of animals and their disposal to the site as directed by Engineer-in charge.

-

-

-

... More
Big animal like cow, buffalow etc.

6

-

584.15

... More
Small animal like cat, Dogs ,etc.

15

-

157.4

... More
NSR- Cleaning of choking 50mm to 100 mm dia C.I.Pipes of toilet /bath rooms and kitchen including cleaning of fully chamber and taking out the pipe and refixing the same if necessary including supply of all material , fixing the pipe in proper position also disposal of debries etc. to dust bins within 50 M distance including supply as all material , labour , T&P required for a proper completion of work (pipe if required shall be supplied by the Deptt, free of cost ) one no. choking will be considered for cleaning of the pipe line between floor trap upto gully trap /chamber for ground floor

25

-

19.45

... More
NSR- Providing and sprinkling the lime in all drains and in water logging area including cost of all material, labour T&P etc. required for proper completion of work.

6

-

407.3

... More
NSR- Cleaning of choked pipe /sewerage pipe of following internal dia by rodding from the manhole and well flushing after cleaning including openings and closing the manholes covers and also disposal of sludge within 50 M lead at specified place including cost of all material, Labour T&P etc. required for proper completion of work (one no. will be considered for cleaning of particulars dia of pipe line between two manhole) (100m internal dia.)

10

-

62.85

... More
NSR- Cleaning of septic tank / soakpit of any size including dewatering and taking out sludge from septic tank and disposal of the same within a distance out side the H-type office shed (by truck / Tractor /Trolley) as per direction of Engineer-incharge.

1

-

686.21

... More
NSR- Cleaning jungle including uprooting of rank vegetation, grass brush wood, trees and sapling of girth up to 30 cm measured at a height of 1 M above ground level and removal of rubbish up to a distance of 50 M out side the periphery of the area cleaned

2500

-

11

... More
NSR- Contractor shall have to uproot wild vegetation of all kinds of vertical and Horizontal faces of buildings of H TYPE office sheds including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer in Charge.

100

-

53.47

... More
NSR- Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.

-

-

-

... More
NSR- Beyond 30 cm girth upto and including 60 cm girth

1

-

333.7

... More
NSR- Beyond 60 cm girth upto and including 120 cm girth

1

-

1485.65

... More
CMR- Providing following materials for proper Completion of works.

-

-

-

... More
Odonil

12

-

276.1

... More
Vim

40

-

60

... More
Napthalene Balls

12

-

112.85

... More
Harpic / Phenyl

65

-

74.45

... More
PART-B-I- SWEEPING OF ROADS AND CLEANING OF DRAINS AND CLEANING OF GRASS / JUNGLE OF "A"TPS POWER HOUSE AREA

-

-

-

... More
NSR- Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared.

9700

-

5.6

... More
NSR- Surface dressing of the ground including removing vegetations and inequalities not exceeding 15cm deep and disposal of rubbish lead upto 50M and lift upto 1.5 M

100

-

21.35

... More
NSR- Removal of dead bodies of animals and their disposal from the site as directed by Engineer incharge.

-

-

-

... More
Big Animals like cow, buffalo etc.

10

-

584.15

... More
Small animals like cat ,dog etc.

10

-

157.4

... More
NSR- Supplying and sprinkling lime in drains and marking along the road, etc. in P.H. area in proper quanity as per direction of Engineer incharge Including the cost of all materials, laboures, T&P etc. required for proper completion

6

-

407.3

... More
NSR- Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

5000

-

11

... More
NSR- Contractor shall have to uproot wild vegetation of all kinds of vertical and Horizontal faces of buildings upto first floor of ATPS power house area including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer in Charge.

200

-

53.47

... More
NSR- Collection & transportation of loose earth , garbage, debries, rock, ash rubbish, grass, brick, bats etc., from different location already ed places for measure ments and its disposal by truck, Tractor, Trolley within 3 KM distance including leveling and dressing of disposed earth in disposal yard and also including cost of all labour ,materials, T&P etc. required for proper completion of work (The rates will be applicable to net qty. after deduction of 20% for voids).

1000

-

57.85

... More
NSR- Sweeping & cleaning of various roads and their side patries in P.H. area including removing of garbage and its disposal within 50 M distance and including cost of all materials, labour T&P etc. required for proper completion of work.

2400000

-

0.9

... More
NSR- Cleaning of pucca / Katcha drains of various sizes including removal of deposited earth ,brick bats boulders, ash and other debries from the bed of drains and its collection within a distance of 50 M from the length cleaned including cost of all materials , labour T&P etc. required for proper completion of work.

-

-

-

... More
Drain of bed widthupto 0.50 M and deapth 1.50 M

96000

-

0.3

... More
Drain of bed width 0.50 M to1.00 M and depth 1.50 M and top width upto 2.50M

96000

-

0.5

... More
Drain of bed width more than 1.00 M and depth more than 1.5 M and top width more than 2.5 M

72000

-

0.55

... More
NSR- Contractor shall have to uproot wild vegetation of all kinds of vertical and Horizontal faces of buildings upto first floor of ATPS power house area including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer in Charge.

150

-

53.47

... More
NSR- Removing chocking of pipes / Sewer pipes of following internal diameter by rodding from manholes and well flushing after cleaning and opening of manholes covers and disposal of sludge within 50 M lead at specified place including cost of all labour, T&P materials etc. required for proper completion of work (one no. will be considered for cleaning of particular dia pipe lines between two manholes).

-

-

-

... More
100 mm internal dia.

9

-

62.85

... More
NSR- Pumping out sewage from manholes /sewer line surface drains including cost of material, labours, T&P deploying 5HP diesel pump.

10

-

92.25

... More
NSR- Removal of blockage of drain by excavating over are(exceeding 30 Cm in depth & 1.5 M in width as well as 10 Sqm in plan) including disposal of excavated ash and lift upto 1.5 M, disposed ash to be leveled and neatly dressed.

5000

-

9.95

... More
NSR- Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.

-

-

-

... More
NSR- Beyond 30 cm girth upto and including 60 cm girth

1

-

333.7

... More
NSR- Beyond 60 cm girth upto and including 120 cm girth

1

-

1485.65

... More
PART-B-II- SWEEPING OF ROADS AND CLEANING OF DRAINS AND GRASS/JUNGLE CLEANING IN CENTRAL STORE AREA AND JUNGLE CLEANING FROM SWITCHYARD SLOPE ALONG WITH MAIN ROAD AT A.T.P. (3X210 MW) ANPARA.

-

-

-

... More
DSR 2.32 Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared.

2500

-

5.6

... More
NSR- Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

15000

-

11

... More
NSR- Collection & transportation of loose earth , garbage, debries, rock, ash rubbish, grass, brick, bats etc., from different location already ed places for measure ments and its disposal by truck, Tractor, Trolley within 3 KM distance including leveling and dressing of disposed earth in disposal yard and also including cost of all labour ,materials, T&P etc. required for proper completion of work (The rates will be applicable to net qty. after deduction of 20% for voids).

150

-

57.85

... More
NSR- Cleaning of pucca / Kacha drains of various sizes including removal of deposited earth ,brick bats boulders, ash and other debries from the bed of drains and its collection within a distance of 50 M from the length cleaned including cost of all materials , labour T&P etc. required for proper completion of work.

-

-

-

... More
Drain of bed width 0.50 M and depth 1.5 M

9000

-

0.3

... More
Drain of bed width 0.50 M to1.00 M and depth 1.50 M and top width upto 2.50M

4500

-

0.5

... More
NSR- Removal of blockage of drain by excavating over are(exceeding 30 Cm in depth & 1.5 M in width as well as 10 Sqm in plan) including disposal of excavated ash and lift upto 1.5 M, disposed ash to be leveled and neatly dressed.

1000

-

9.95

... More
NSR- Surface dressing of the ground including removing vegetations and inequalities not exceeding 15cm deep and disposal o rubbish lead upto 50M and lift upto 1.5 M

100

-

21.35

... More
NSR- Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.

-

-

-

... More
NSR- Beyond 30 cm girth upto and including 60 cm girth

1

-

333.7

... More
NSR- Beyond 60 cm girth upto and including 120 cm girth

1

-

1485.65

... More
PART C- SWEEPING OF ROAD & CLEANING OF DRAINS IN C.H.P. AREA 'A&B' TPS, ANPARA

-

-

-

... More
NSR- Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared.

1000

-

5.6

... More
NSR- Removal of blockage of drain by excavating over area (exceeding 30 cm in depth and 1.5M in width as well as 10Sqm in plan) including disposal of excavated ash lead upto 50 M and lift upto 1.5M disposed ash to be leveled and neatly dressed.

900

-

9.95

... More
NSR- Surface dressing of the ground including removing vegetations and inequalities not exceeding 15cm deep and disposal o rubbish lead upto 50M and lift upto 1.5 M

300

-

21.35

... More
NSR- Removal of dead bodies of animals and their disposal from the site as directed by Engineer in-charge.

-

-

-

... More
Big animal like cow, buffalo etc

24

-

584.15

... More
Small animal like cat, dog etc.

15

-

157.4

... More
NSR- Supplying and sprinkling lime in drains and marking along the road, diversion channel etc. in P.H. area in proper quantity as per direction of Engineer-in-charge including the cost of all material labours, T&P etc. required for proper completion of work.

12

-

407.35

... More
NSR- Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared.

8000

-

11

... More
NSR- Collection & transportation of loose earth , garbage, debries, rock, ash rubbish, grass, brick, bats etc., from different location already ed places for measure ments and its disposal by truck, Tractor, Trolley within 3 KM distance including leveling and dressing of disposed earth in disposal yard and also including cost of all labour ,materials, T&P etc. required for proper completion of work (The rates will be applicable to net qty. after deduction of 20% for voids).

400

-

57.85

... More
NSR- Sweeping cleaning of various roads and their side patries in P.H. area including removing of garbage and its disposal within 50 M distance and including cost of all materials, labour, T&P etc. required for proper completion of work.

1530300

-

0.9

... More
NSR- Cleaning of pucca / katcha drains of various size including removal of deposited earth, brick s, bats boulders and ash and other debries from the bed of drains and its collection within a distance of 50 M from the length cleaned including, cost of all labour, T&P ,Material etc. required for proper completion of work.

-

-

-

... More
Drain of bed width 0.50M and depth 1.50 m

62000

-

0.3

... More
Drain of bed width 0.50 M to 1.00 M and depth 1.5M and top width upto 2.5 M

65050

-

0.5

... More
Drain of bed width more than 1.00 M and depth more than 1.5 M and top width more than 2.50M

37820

-

0.55

... More
NSR- Cleaning of septic tank / soak pit of any size in ATP (PH) including dewatering and taking out sludge from septic tanks and disposal of the same within 3KM distance out side the site by truck / Tractor.

1

-

686.21

... More
NSR- Removing chocking of pipes / sewer pipe of following internal dia meter by rodding from man holes and well flushing after cleaning and opening of manholes covers and disposal of sludge within 50M lead at specified places including cost of all labour, materials, T&P etc. required for proper completion of work (one no. will be considered for cleaning of particular dia of pipes lines between. Two manholes).

-

-

-

... More
100mm internal dia.

5

-

62.85

... More
Above 100 mn internal dia

5

-

88.4

... More
NSR- Pumping out sewerage from manholes /sewer lines surface drains including cost of materials, labour, T&P deploying 5HP diesel pump

10

-

92.25

... More
CMR- Supply and providing following materials.

-

-

-

... More
Odonil

2

-

276.1

... More
Vim

6

-

60

... More
Nepthalene Ball

3

-

112.85

... More
Harpic/ Phenyle

36

-

74.45

... More
NSR- Keeping neat & clean toilet at ATP track hopper including washing floors, wash basin, windows, w.c. seat pipes etc. with vim, phenyl ,odonil, sanifresh or equivalent twice in a day and also including cleaning of dust ,debries, cow webs etc. from the walls /ceiling also removing chocking including all labour, material, T&P etc. required for proper completion of work but excluding the cost of vim, naphthalene, harpic, phenyl etc. (which shall be supplied by the deptt. Free of cost.

310

-

21.05

... More
NSR- Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.

-

-

-

... More
NSR- Beyond 30 cm girth upto and including 60 cm girth

1

-

333.7

... More
NSR- Beyond 60 cm girth upto and including 120 cm girth

1

-

1485.65



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.