Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Machinery and Tools
Eprocure
Opening Date11 Jul 2024
Closing Date7 Aug 2024
Tender Amount₹ 88,17,052 
Notes
Download

Costs

Summary

Maintenance Contract Of Boiler Pressure Parts Of All Three Units Of 3x210 M.w, Atps, Anpara

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Routine Maintenance of wall blowers and LRSB’s of Boiler of unit No. 01, 02 &03. Frequency- as follows: Monday: Unit#1 wall blower Tuesday: Unit#2 wall blower Wednesday: Unit#3 wall blower Thursday: Unit#1 LRSB Friday: Unit#2 LRSB Saturday: Unit#3 LRSB

624

-

-

... More
Complete servicing repairing/replacement of jammed/ damaged wall blowers of unit no.1, 2 & 3 for their smooth operation as and when required.

200

-

-

... More
Complete servicing repairing/replacement of jammed/ damaged long retractable soot blowers of unit no.1.2 &3 for their smooth operation as and when required

160

-

-

... More
Complete servicing /repairing/replacement of steam valves of wall blowers & LRSB’s of unit no.1.2 &3 for their smooth operation as and when required

200

-

-

... More
Mobilization the team & attending the leakages of pressure parts in different zones of Boiler up to ten joints.

20

-

-

... More
Replacement of eroded /damaged tubes/bends of pressure parts in different zones of Boiler during preventive maintenance or after 10 joints during attending leakages.

400

-

-

... More
Fixing of sky climber in boiler furnace after making proper platform on bottom ash hopper, its operation during execution of the works and dismantling and removal of ash hopper platform after completion of jobs. Rates should be quoted on as per job basis.

2

-

-

... More
Shifting of sky climber in boiler furnace at different location for attending and inspection of various pressure part zones. Rate should be quoted on as per job basis.

8

-

-

... More
Erection of Scaffolding and plate form in Economizer hopper (above)

4

-

-

... More
Erection of Scaffolding and plate form in S-Panel & bottom ash hopper

4

-

-

... More
Erection of Scaffolding and plate form in Reheater inlet & outlet

6

-

-

... More
Erection of Scaffolding and plate form Water wall screen tube / final super heater / super heater screen tube

4

-

-

... More
Erection of Scaffolding and plate form in Platen super heater tube zone

4

-

-

... More
Stitch Welding of fins of water / steam cool wall for securing of respective positions of tubes

400

-

-

... More
Build up of eroded portion of the tubes caused by ash / steam erosion using suitable welding electrodes matching with parent metal composition. Depth of erosion up to 2.5 mm, length of erosion up to 250 mm

200

-

-

... More
Fabrication of Hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating gas to required temperature of Carbon Steel

2

-

-

... More
Fabrication of Hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating gas to required temperature of Alloy Steel.

2

-

-

... More
Removal of damaged U clamps and replacement/ refitting of the same with new/repaired one in different zones of the pressure parts.

100

-

-

... More
Removal of damaged Scallop bars and replacement/ refitting of the same with new/repaired one in different zones of the pressure parts.

100

-

-

... More
Removal of damaged Binders, support band, lugs and replacement/ refitting of the same with new/repaired one in different zones of the pressure parts.

100

-

-

... More
Removal of damaged Flexible connectors (male/female) and replacement/ refitting of the same with new/repaired one in different zones of the pressure parts.

100

-

-

... More
Rectification / replacement of tubular (half round) in the following pressure part zones.

60

-

-

... More
Rectification / replacement of box type Protector /Cassette baffles found damaged / eroded / dislocated in in the following pressure part zones.

60

-

-

... More
Lifting and taking out the complete coils in pair of LTSH horizontal coils (upper or lower) after cutting clamps supports, clits, stoppers and releasing from subsequent headers and coil & their restoration after placement of coil

4

-

-

... More
Lifting and taking out the complete coils of Economizer (upper or lower) after cutting clamps supports, clits, stoppers and releasing from subsequent headers and coil & their restoration after placement of coil

4

-

-

... More
Rectification of Buck Stay / Putting buck stay pin on its position in second pass of Boiler / corner No.1, 2, 3 & 4

4

-

-

... More
Cutting and removal of skin casing / high crown plate by grinder and welding the same with suitable electrode by High pressure welding method, after completion of repair jobs of pressure parts if any of Thickness - up to 15 mm

20

-

-

... More
Cutting and removal of skin casing / high crown plate by grinder and welding the same with suitable electrode by High pressure welding method, after completion of repair jobs of pressure parts if any of Thickness -16 mm or above

40

-

-

... More
Repairing/replacement of skin casing plates, expansion plates of one pannel complete of boiler roof in pent house above sealing Super heater from drum to platen superheater tubes.

8

-

-

... More
Repairing/replacement of skin casing plates, expansion plates of 1/5th pannel complete of boiler roof in pent house above sealing Super heater tubes from drum to platen superheater tubes.

4

-

-

... More
Repairing/replacement of casing plates pannel of platen superheaters, reheaters of pent house of boiler.

20

-

-

... More
Repairing/replacement of damaged side plate below/side of boiler drum by cutting, grinding and welding with suitable electrode

40

-

-

... More
Repairing/replacement of damaged skin casing plates in second pass by cutting, grinding and welding with suitable electrode

40

-

-

... More
System line up for filling of feed water through Boiler Fill Pumps & Pressurization of pressure parts of Boiler Feed pump for hydraulic Test of Boiler, Normalization of the same after hydraulic Test and Making system ready for Light-up.

20

-

-

... More
Servicing of feed line gate control valves NRV size NB- 300mm NP-250 Kg./ cm² valves covered are E-1, E-2, BF-29, 30,33,34,37&BF-38.

4

-

-

... More
Servicing of low load line gate & control valves size NB-200mm NP-250Kg/ cm² valves covered are BF-31, 32,35,36,39 & BF-40

4

-

-

... More
Servicing of Pneumatically operated S/H, R/H attemperation control valves & RH Spray block valves.

8

-

-

... More
Servicing of main Isolating valve BF-61 at the inlet of SH spray station, size: Nb- 150mm, NP-250Kg / cm²

4

-

-

... More
Servicing of main isolating valve of main steam line (L&R) M.S.-29 & M.S.-30,Nb-250mm, NP-250Kg/ cm²

2

-

-

... More
Servicing bypass valves of main steam valves, MS-29A, and MS-30A, Nb-25mm, NP-250Kg/ cm²

4

-

-

... More
Servicing of bypass valves of feed station, low load line valve and main isolation valve of inlet to SH-Nb-25mm, NP-250Kg/cm².

4

-

-

... More
Servicing of boiler drum safety valves and safety valve on main steam line on right hand side of boiler at 52meter elevation

4

-

-

... More
Servicing of electromagnetic relief valve (implies safety valve).

2

-

-

... More
Servicing of safety valves installed on hot reheat and cold reheat line at about 50meter elevation.

2

-

-

... More
Servicing of safety valve on soot blower line at 52mtr elevation

2

-

-

... More
Servicing of high-pressure valve & NRV’s at different elevation from ‘0’meter level to 54 meter level, in dozing hall nominal bore may vary from Ø10mm to Ø100mm.

2000

-

-

... More
Replacement of H.P. Valves/NRV of sizes-Nb-10 / 15 / 25mm (H/ O, M/O) at different floors from ‘0’meter level to 54meter level, Dozing hall and at Dearator floor by cutting of damaged valve and welding of new valve after its revisioning.

8

-

-

... More
Servicing/replacement of hydra motor valves of oil station at AB / CD / EF elevation

8

-

-

... More
Servicing of oil line valves and NRV’s of oil station at AB / CD / EF elevation of boiler

1000

-

-

... More
Servicing/overhauling of pneumatic operated dia150mm/dia 250mm valves on Aux. PRDS line and Dearator.

8

-

-

... More
Servicing /overhauling of electrically drive steam valve dia 100mm to 250mm on Aux. PRDS line

8

-

-

... More
Servicing/overhauling of electrically driven Nb- 400mm gate valve at Dearator

2

-

-

... More
Servicing/overhauling of electrically drove Nb- 50mm valves on Aux. PRDS line.

4

-

-

... More
Servicing/overhauling of pneumatic operated control valve size 50 to 100mm

4

-

-

... More
Servicing/overhauling of hand operated valve/NRV’s of size 150 to 250mm

8

-

-

... More
Servicing /overhauling of hand operated valves /NRV’s of size 300/350 mm.

4

-

-

... More
Servicing and revisioning of steam valves & NRV’s of Aux. PRDS line and Dearator. Rate to be quoted per mm basis.

1600

-

-

... More
Changing flange gaskets of valves & flange at different elevation of boiler. Rate should be quoted on per MM basis

2000

-

-

... More
Replacement of gland packing with new one from valves leaking from glands. Rate should be quoted on per MM basis.

4000

-

-

... More
Replacement of various safety valves of critical piping such as Boiler Drum, Super Heater, CRH, HRH, etc

2

-

-

... More
Replacement of 150 mm Motorized Valve (PRDS (BiG), BF-61 and similar Valves)

2

-

-

... More
Replacement of 100 mm Motorized Valve (PRDS (small) and similar Valve )

2

-

-

... More
Attending leakages of pipeline & headers etc. of main boiler, Dearator and aux. PRDS of 3x210 MW by cutting grinding and H.P. welding of damaged portion putting new spools/bends if required.

200

-

-

... More
Servicing/overhauling of pneumatically operated actuators of valve. Size dia 40 to 100mm.

24

-

-

... More
Servicing/overhauling of pneumatically operated actuators of valves size dia 202 to 300mm

4

-

-

... More
Fabrication of H.P. drip/drain line bends out of available pipe by cutting, grinding & H.P. welding.

4

-

-

... More
Servicing / Replacement/overhauling of safety valve of Aux. PRDS.

4

-

-

... More
Servicing/Replacement/overhauling of safety valves of Dearator/CBD Tank/Pegging Line.

4

-

-

... More
Blanking of hot reheat and cold reheat NRV by blanking device & normalizing the same

20

-

-

... More
Replacement of H.P. valves /NRV of size 100 mm at Dearator floor by cutting of damaged valves/NRV and welding with New/repaired valve/NRV after its revision

2

-

-

... More
Replacement of H.P. valves /NRV of size 150 mm at Dearator floor by cutting of damaged valves/NRV and welding with New/repaired valve/NRV after its revision

2

-

-

... More
Replacement of H.P. valves /NRV of size 200 mm at Dearator floor by cutting of damaged valves/NRV and welding with New/repaired valve/NRV after its revision

2

-

-

... More
Replacement of H.P. valves /NRV of size 250 mm at Dearator floor by cutting of damaged valves/NRV and welding with New/repaired valve/NRV after its revision

2

-

-

... More
Replacement of H.P. valve (H/O, M/O, Pneumatic)/ NRV of the following sizes at Dearator floor of flange end Type by opening Nut and Bolts of flange and installation of new /repaired valves/NRV on it properly after replacement of gasket and servicing of valve. size 200 / 250mm valve / NRV

2

-

-

... More
Replacement of start up vents (R /H & S / H) at 54-mtr elevation

2

-

-

... More
Replacement of high Pressure valves (motor operated / hand operated/Pneumatic) of critical piping of Boiler of size:Nb-40mm to 65mm

2

-

-

... More
Replacement of Electrical / Pneumatic actuators of valve size up to Nb-300mm at different elevations;

2

-

-

... More
Replacement of H.P. drain/drip pipes of size Nb-200mm, Thickness- 6mm, Material- Carbon Steel. Rate will be quoted on joint basis.

10

-

-

... More
Replacement of H.P. drain/drip pipes of size Nb-150 mm, Thickness- 8mm, Material- Carbon Steel. Rate will be quoted on joint basis.

10

-

-

... More
Replacement of 150 mm PRDS Control Valve

2

-

-

... More
Replacement of 100 mm PRDS Control Valve.

2

-

-

... More
Replacement of DSH of PRDS line

2

-

-

... More
Servicing /revisioning of gear box of Phosphate dozing Pump

2

-

-

... More
Servicing / revisioning of gear box of hydrazine dozing Pump

2

-

-

... More
Servicing of Phosphate dozing pump (Suction & Discharge NRV of pump body)

2

-

-

... More
Servicing of hydrazine dozing pump (Suction & Discharge NRV of pump body)

2

-

-

... More
Servicing of pressure relief valve of phosphate / hydrazine dozing pumps

2

-

-

... More
Complete cleaning & removal of foreign materials from phosphate metering, temporary preparation tanks and their strainers. Its servicing and back washing of M/ tank.

2

-

-

... More
Complete cleaning & removal of foreign materials from Hydrazine metering, temporary preparation tanks and their strainers. Its servicing and back washing of M/ tank

2

-

-

... More
Cleaning / flushing of pipe lines of phosphate / hydrazine dozing system to remove any chocking in the system

2

-

-

... More
Repairing/Reconditioning of 100mm, class 1500, flange end, Deaerator (D/A) drain valve

2

-

-

... More
Repairing/Reconditioning of 18 ata 250 NB, C.C.S. gate valve, flanged end, hand operated valves.

2

-

-

... More
Repairing/Reconditioning of 200 mm, C.C.S. gate valve, BW, flanged end, class-300, hand operated valve

2

-

-

... More
Repairing/Reconditioning of 150 mm, C.C.S. gate valve, BW, flanged end, class-600, hand operated valve.

2

-

-

... More
Repairing/Reconditioning of150 mm, BFP recirculation gear operated hand valve, BW, class-2500, seat & disc.

2

-

-

... More
Repairing/Reconditioning of 150 mm, class -600, lift check valve(NRV)

2

-

-

... More
Repairing/Reconditioning of 200 mm,class -600, BW, swing check valve (NRV).

2

-

-

... More
Repairing/Reconditioning of 250 mm, class-600, BW, swing check valve (NRV).

2

-

-

... More
Repairing/Reconditioning of Superheater/ Reheater startup vent, size-100 mm, class-2500.

2

-

-

... More
Repairing/Reconditioning of Superheater spray control valve and M/O valve & R/H spray block valve.

2

-

-

... More
Repairing/Reconditioning of Boiler drum air vents & similar valve size-65mm glove.

2

-

-

... More
Repairing/Reconditioning of R/H spray control valve and M/O valve

2

-

-

... More
Inspection & removal of minor defects of Deaerator

2

-

-

... More
Repairing of manholes of boiler

40

-

-

... More
Repairing of peepholes of Boilers

40

-

-

... More
Servicing /replacement of spring hangers, supports Anchors and restraints of boiler critical piping & ducts and resetting the spring hangers on cold set values

20

-

-

... More
Replacement of coal nozzle assembly complete (coal nozzle and adj. coal nozzle tip / seal plate) with new or repaired one

48

-

-

... More
Repairing / servicing of burner tilting lever.

48

-

-

... More
Replacement of coal inlet elbows (long / short )

48

-

-

... More
Servicing / repairing / replacement of gun guide assembly at AB, CD and EF elevation

24

-

-

... More
Replacement / Servicing of Igniter guide assembly at AB, CD and EF elevation

20

-

-

... More
Repairing of wind box (L&R).

200

-

-

... More
Servicing of S/A dampers in wind box (L&R).

104

-

-

... More
Repairing / Servicing of scanner guide assembly

10

-

-

... More
Repairing / Servicing of scanner air fan.

12

-

-

... More
Attending coal dust leakages from FI Elbow / Coal Nozzle casting by Patch Welding

20

-

-

... More
Repairing & Hard facing of S.S. Adjustable Coal Nozzle Tips.

48

-

-

... More
Repairing and Hard facing of Coal Nozzle Casting

48

-

-

... More
Hard facing of Coal Nozzle Casting

48

-

-

... More
Repairing and Hard facing of Fuel Inlet Elbows.

48

-

-

... More
Repairing of oil gun assembly.

20

-

-

... More
Erection / repair of grating at different elevation of boiler and other places

1600

-

-

... More
Fabrication and erection of steel structure work vize chute, plate form stair at boiler side.

4

-

-

... More
Repairing / replacement of plate-form railing in boiler side.

500

-

-

... More
Cleaning of Cold PA ducts (left and right) from P.A. fans outlet dampers to APH.

6

-

-

... More
Cleaning of Cold SA ducts (left and right) from S.A. fans outlet dampers to APH.

6

-

-

... More
Cleaning of Dog House.

12

-

-

... More
Cleaning of Hot SA duct (Right)

6

-

-

... More
Cleaning of Hot SA duct (Left)

6

-

-

... More
Cleaning of Wind Box (Right)

12

-

-

... More
Cleaning of Wind Box (Left)

12

-

-

... More
Cleaning of Gooseneck cat house front and rear.

12

-

-

... More
Cleaning of Economiser chamber of boiler

16

-

-

... More
Cleaning of gallery between Reheater and arch tubes.

16

-

-

... More
Cleaning of gallery between exit super heater and hangers tubes to conv. super heater

16

-

-

... More
Cleaning of second pass (LTSH)

16

-

-

... More
Cleaning of from water wall of first pass (furnace) from ‘0’ meters to 48 meters elevation.

4

-

-

... More
Cleaning of Pent house above furnace.

2

-

-

... More
Cleaning of gallery between platen super heater and cold reheat headers in pent house.

2

-

-

... More
Cleaning between exit super heater and convector super heater headers in pent house.

2

-

-

... More
Cleaning of space between header No.10 & rear sidewall in pent house.

2

-

-

... More
Cleaning of gallery between cold reheat headers in pent house.

2

-

-

... More
Cleaning of gallery in left and right of pent house between water wall and skin casing.

2

-

-

... More
Cleaning of Space below boiler drum between front water wall and front drum houseman hole.

2

-

-

... More
Cleaning second pass of pent house (above ceiling tube of pent house)

2

-

-

... More
Cleaning of all four Economiser hoppers.

16

-

-

... More
Cleaning of all the four flue gas ducts from air pre-heater to ESP inlet.

16

-

-

... More
Cleaning of inter connecting duct of flue gas at ESP inlet.

16

-

-

... More
Cleaning of flue gas duct hopper just before and after F.G.-3 and F.G.-4 dampers.

16

-

-

... More
Cleaning and removal of accumulated fly ashes / foreign materials / debris / scraps etc. from the boiler roof and its disposal to ‘0’Mtr.level boiler and from ‘0’Mtr. to dumping yard.

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.