Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Eprocure
Opening Date1 Feb 2024
Closing Date4 Mar 2024
Tender Amount₹ 34,98,835 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender inviting Notice, Completion time schedule, Instruction to Bidders, PQC, Condition of Contract including special Terms and conditions, Scope of work
Schedule of Rate and Quantity BOQ
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ATTENDING THE LEAKAGES FROM ECONOMIZER / LTSH TUBE.

-

-

-

... More
ATTENDING TUBE LEAKAGE UP TO IST TEN H.P. WELD JOINTS.(IRRESPECTIVE OF NUMBER H.P. WELD JOINTS IN ONE FREQUENCY.

6

-

-

... More
ATTENDING TUBE LEAKAGES FOR EACH H.P. WELD JOINTS BEYOND 10NOS. OF H.P. WELD JOINT.

20

-

-

... More
ATTENDING THE LEAKAGES IN CEILING SUPER HEATER TUBES SITUATED IN FURNACE TOP BEFORE PLATEN SUPER HEATER, PLATEN SUPER HEATER TUBES.

-

-

-

... More
ATTENDING TUBE LEAKAGE UP TO IST TEN H.P. WELD JOINTS.(IRRESPECTIVE OF NUMBER H.P. WELD JOINTS IN ONE FREQUENCY). COMPLETION TIME WILL BE RECKONED AFTER 12 HRS OF BOILER BOXED UP AND INSTALLATION OF SKY CLIMBER.

4

-

-

... More
ATTENDING TUBE LEAKAGES FOR EACH H.P. WELD JOINTS BEYOND 10 NOS. OF H.P. WELD JOINT.

10

-

-

... More
ATTENDING THE LEAKAGES IN COLD REHEAT & HRH TUBES, ARCH TUBES, SCREEN TUBES, WATER WALL HANGER TUBES, SUPER HEATER HANGER TUBES, FINAL SUPER HEATER, EXIT SUPER HEATER TUBES, EXTENDED WATER WALL TUBES, CEILING SUPER HEATER TUBES BEYOND PLATEN SUPER HEATER.

-

-

-

... More
ATTENDING TUBE LEAKAGE UP TO IST TEN H.P. WELD JOINTS (IRRESPECTIVE OF NUMBER H.P. WELD JOINTS IN ONE FREQUENCY). (COMPLETION TIME WILL BE RECKONED AFTER 12 HRS OF BOILER BOXED UP.

4

-

-

... More
ATTENDING TUBE LEAKAGES FOR EACH H.P. WELD JOINTS BEYOND 10 NOS. OF H.P. WELD JOINT.

20

-

-

... More
ATTENDING THE LEAKAGES FROM SCW SUPER HEATER TUBES AND EXTENDED SUPER HEATER TUBES.

-

-

-

... More
ATTENDING TUBE LEAKAGE UP TO IST TEN H.P. WELD JOINTS (IRRESPECTIVE OF NUMBER H.P. WELD JOINTS IN ONE FREQUENCY). COMPLETION TIME WILL BE RECKONED AFTER 12 HRS OF BOILER BOXED UP AND INSTALLATION OF SKY CLIMBER.

4

-

-

... More
ATTENDING TUBE LEAKAGES FOR EACH H.P. WELD JOINTS BEYOND 10 NOS. OF H.P. WELD JOINT.

20

-

-

... More
ATTENDING THE LEAKAGES OF HAND HOLE PLATES OF DIFFERENT PRESSURE PART HEADER BY REMOVING HAND HOLE PLATES WITH HAND HOLE CUTTING EQUIPMENT, REWELDING OF THE SAME AFTER COMPLETE PREPARATIONS AND STRESS RELIEVING OF THE SAME AFTER WELDING IF REQUIRED. RATE SHOULD BE COATED ON AS PER JOINT BASIS.

4

-

-

... More
ATTENDING THE LEAKAGES OF HEADER STUBS UP TO IST TEN STUBS JOINTS IN ONE FREQUENCY OF DIFFERENT PRESSURE PARTS HEADERS OF BOILER. COMPLETION TIME IS GIVEN CONSIDERING PRE HEATING AND STRESS RELIEVING.

4

-

-

... More
REMOVAL OF DAMAGED CLAMPS / BINDERS /SCALLOP BARS ETC AND REPLACEMENT / REFITTING OF THE SAME WITH NEW / REPAIRED ONE IN DIFFERENT ZONES OF THE PRESSURE PARTS. THE RATES SHOULD BE QUOTED ON AS PER NO. BASIS AS UNDER:-

-

-

-

... More
U’ CLAMPS.

100

-

-

... More
SCALLOP BARS.

100

-

-

... More
BINDERS, SUPPORT BAND, LUGS.

100

-

-

... More
FLEXIBLE CONNECTORS (MALE / FEMALE).

100

-

-

... More
FABRICATION OF HOT BENDS OF VARIOUS DEGREES AND RADIUS OF CURVATURE FROM STRAIGHT PRESSURE PARTS TUBES BY FILLING SAND AND HEATING GAS TO REQUIRED TEMPERATURE OF FOLLOWING MATERIALS:-

-

-

-

... More
CARBON STEEL.

10

-

-

... More
ALLOY STEEL.

10

-

-

... More
STITCH WELDING OF FINS OF WATER / STEAM COOL WALL FOR SECURING OF RESPECTIVE POSITIONS OF TUBES.

160

-

-

... More
RECTIFICATION / REPLACEMENT OF ASH PROTECTOR / SHIELDING / CASSETTE BAFFLES FOUND DAMAGED / ERODED / DISLOCATED OR PROVIDING NEW PROTECTOR IN THE FOLLOWING PRESSURE PART ZONES( RATES SHOULD BE QUOTED ON AS PER NO. BASIS)

-

-

-

... More
TUBULAR (HALF ROUND) PROTECTOR OF PLATEN SUPER HEATER / REHEATER INLET ETC AND THEIR SPACER TUBES. PROTECTOR /SHIELDING SHALL BE RECTIFIED / INSTALLED WITH THE HELP OF SKY CLIMBER IF AVAILABLE.

20

-

-

... More
RECTIFICATION / REPLACEMENT OF BOX TYPE PROTECTOR / CASSETTE BAFFLES FOUND DAMAGED / ERODED / DISLOCATED IN LTSH / ECONOMIZER ETC.

20

-

-

... More
TUBULAR PROTECTORS / SHIELDING OF WATER WALL HANGER TUBES / WATER WALL SCREEN TUBES / FINAL SUPER HEATER / LTSH / ECONOMIZER / REHEATER ETC. PROTECTOR / SHIELDING SHALL BE RECTIFIED / INSTALLED WITH THE HELP OF SCAFFOLDING TO BE ERECTED BY AGENCY AS PER REQUIREMENTS.

20

-

-

... More
RECTIFICATION / REPLACEMENT OF BOX TYPE PROTECTOR / CASSETTE BAFFLES FOUND DAMAGED / ERODED / DISLOCATED OF WATER WALL HANGER TUBES / WATER WALL SCREEN TUBES / FINAL SUPER HEATER / REHEATER ETC. PROTECTOR / SHIELDING SHALL BE RECTIFIED / INSTALLED WITH THE HELP OF SCAFFOLDING TO BE ERECTED BY AGENCY AS PER REQUIREMENTS.

20

-

-

... More
ERECTION OF SCAFFOLDING AND PLATFORM IN THE FOLLOWING AREAS:-

-

-

-

... More
ECONOMIZER HOPPER (ABOVE).

4

-

-

... More
S-PANEL & BOTTOM ASH HOPPER.

4

-

-

... More
REHEATER INLET & OUTLET.

4

-

-

... More
WATER WALL SCREEN TUBE / FINAL SUPER HEATER / SUPER HEATER SCREEN TUBE/LTSH UPPER BANK TO BP UPPER REAR WALL.

4

-

-

... More
BUILD UP OF ERODED PORTION OF THE TUBES CAUSED BY ASH / STEAM EROSION USING SUITABLE WELDING ELECTRODES MATCHING WITH PARENT METAL COMPOSITION. DEPTH OF EROSION UP TO 2.5MM, LENGTH OF EROSION UP TO 250 MM.

30

-

-

... More
LIFTING AND TAKING OUT THE COMPLETE COILS IN PAIR OF LTSH HORIZONTAL COILS (UPPER OR LOWER) AFTER CUTTING CLAMPS SUPPORTS, CLITS, STOPPERS AND RELEASING FROM SUBSEQUENT HEADERS AND COIL & THEIR RESTORATION AFTER PLACEMENT OF COIL.

4

-

-

... More
LIFTING AND TAKING OUT THE COMPLETE COILS OF ECONOMIZER (UPPER OR LOWER) AFTER CUTTING CLAMPS SUPPORTS , CLITS, STOPPERS AND RELEASING FROM SUBSEQUENT HEADERS AND COIL & THEIR RESTORATION AFTER PLACEMENT OF COIL.

4

-

-

... More
REPLACEMENT OF ERODED / DAMAGED TUBES / BENDS OF PRESSURE PARTS IN DIFFERENT ZONES OF BOILER DURING PREVENTIVE MAINTENANCE AS PER PROCEDURE MENTIONED IN ANNEXURE OF THE FOLLOWING:-

-

-

-

... More
CARBON / LOW ALLOY (T-11) JOINT.

20

-

-

... More
HIGH ALLOY (T-22) JOINT.

10

-

-

... More
STAINLESS STEEL JOINT.

4

-

-

... More
CUTTING AND REMOVAL OF SKIN CASING / HIGH CROWN PLATE BY GRINDER AND WELDING THE SAME WITH SUITABLE ELECTRODE BY HIGH PRESSURE WELDING METHOD, AFTER COMPLETION OF REPAIR JOBS OF PRESSURE PARTS IF ANY.

-

-

-

... More
THICKNESS -UP TO 15 MM.

20

-

-

... More
THICKNESS-16MM OR ABOVE.

20

-

-

... More
RECTIFICATION OF BUCK STAY / PUTTING BUCK STAY PIN ON ITS POSITION IN SECOND PASS OF BOILER / CORNER NO-1, 2, 3 & 4.

4

-

-

... More
ROUND THE CLOCK ROUTINE AND PREVENTIVE MAINTENANCE WORK OF BOILER INCLUDING OIL GUN CLEANING, VALVES GLAND TIGHTENING, COAL PIPE LEAKAGE ATTENDING AND OTHER MINOR WELDING WORK ON MAIN BOILER OF UNIT #7 (120 MW) HTPS ALIGARH.

2190

-

-

... More
VARIOUS CLEANING WORK ON BOILER OF UNIT NO-7 (120 MW).

-

-

-

... More
CLEANING / WATER WASHING OF BOILER ZERO METER FLOOR EXCEPT BOTTOM ASH, ECONOMIZER HOPPER ETC.

600

-

-

... More
CLEANING OF DIFFERENT FLOORS OF BOILER. (ALL DUCTS, STRUCTURES AND OTHER EXTERNAL SURFACES).

400

-

-

... More
CLEANING OF ALL VALVES AND SKIDS OF FIRING FLOOR.

200

-

-

... More
CLEANING/WATER WASHING OF PENTHOUSE AFTER OPENING MAN HOLES.

2

-

-

... More
CLEANING/WATER WASHING OF GOOSE NECK AREA AFTER OPENING MAN HOLES.

2

-

-

... More
CLEANING OF BOILER II ND PASS (INTERNAL).

2

-

-

... More
CLEANING OF BOILER S-PANEL (INTERNAL).

2

-

-

... More
CLEANING OF WIND BOX L&R (INTERNAL).

2

-

-

... More
VARIOUS BREAKDOWN MAINTENANCE WORK ON BOILER OF UNIT NO-7 (120 MW).

-

-

-

... More
REPAIRING OF MAN HOLES.

6

-

-

... More
REPAIRING OF PEEP HOLES.

2

-

-

... More
SERVICING/REPLACEMENT OF SPRING HANGERS, SUPPORT HANGERS, ANCHORS AND RESETTING OF COLD SETTING VALUES.

2

-

-

... More
REPLACEMENT OF COAL NOZZLE ASSEMBLY (COAL NOZZLE AND ADJACENT COAL NOZZLE TIP/SEAL PLATE) WITH NEW REPAIRED ONE.

10

-

-

... More
REPAIRING /SERVICING OF BURNER TILTING LEVER.

20

-

-

... More
RECTIFICATION OF BUCK STAYS IN FIRST AND SECOND PASS.

2

-

-

... More
ERECTION OF SCAFFOLDING FROM S PANEL (4 METER LEVEL) TO BURNER LEVEL I.E. UP TO 19 METER AND PROVIDING PLATFORM TO FACILITATE INSPECTION / REPAIRING / REPLACEMENT OF COAL BURNER TIPS ETC OF FOUR TIER AT ALL FOUR CORNER (1,2,3&4) OF BOILER FURNACE AND DISMANTLING THE SAME AFTER COMPLETION OF WORK.

2

-

-

... More
CHECKING OF ALL FOUR CORNER COAL BURNER TIPS, OIL BURNER TIPS, AIR NOZZLE TIPS, FLAME SCANNER POSITION.

2

-

-

... More
REPAIRING OF COAL BURNER TIP/OIL BURNER TIP IN INSTALLED CONDITION INSIDE THE BOILER DURING S/D.

2

-

-

... More
REMOVING CHOCKING OF COAL PIPE WHENEVER ANY COAL PIPE FOUND CHOCKED. ONE COAL PIPE OF ANY MILL MAKE ONE JOB.

2

-

-

... More
FIXING OF SKY CLIMBER IN BOILER FURNACE AFTER MAKING PROPER PLATFORM ON BOTTOM ASH HOPPER, ITS OPERATION DURING EXECUTION OF THE WORKS AND DISMANTLING AND REMOVAL OF ASH HOPPER PLATFORM AFTER COMPLETION OF THE JOBS. RATES SHOULD BE QUOTED ON AS PER JOB BASIS.

2

-

-

... More
SHIFTING OF SKY CLIMBER IN BOILER FURNACE AT DIFFERENT LOCATIONS FOR ATTENDING AND INSPECTION OF VARIOUS PRESSURE PARTS ZONES. RATES SHOULD BE QUOTED ON AS PER JOB BASIS.

2

-

-

... More
REPLACEMENT/REPAIRING OF ERODED FLAPS OF VARIOUS FLUE GAS DAMPER MADE OUT OF 3.15MM THICK MS SHEET/ OR PLATE. MS SHEET/ PLATE TO BE PROVIDED BY THE DEPARTMENT FREE OF COST.

2

-

-

... More
FABRICATION OF SEMICIRCULAR BAFFLE OUT OF 6MM OR AVAILABLE PLATES & INSTALLATION OF THE SAME IN THE DUCTS CONNECTION APH OUTLETS TO ESP INLETS.

2

-

-

... More
WELDING OF VARIOUS DUCTS WITH ARC WELDING TO ARREST LEAKAGE OF AIR/GAS.

100

-

-

... More
SERVICING / REPAIRING / REPLACEMENT OF GUN GUIDE ASSEMBLY AT AB AND CD ELEVATION.

2

-

-

... More
SERVICING OF SECONDARY AIR DAMPER IN WIND BOX (L&R).

2

-

-

... More
REPAIRING/SERVICING OF SCANNER GUIDE ASSEMBLY.

2

-

-

... More
REPAIRING / REPLACEMENT OF BRACING OF FLUE GAS DUCT ASSEMBLY.

2

-

-

... More
REPAIRING WORK OF COAL NOZZLE WHEN THE SAME IS LYING OUTSIDE.

2

-

-

... More
REPLACEMENT/SERVICING OF IGNITER GUIDE ASSEMBLY AT AB AND CD ELEVATION.

2

-

-

... More
REPAIRING/FABRICATION OF ADJUSTABLE COAL NOZZLE TIPS BY REPLACING COMPLETE FUEL COMPARTMENT CONSISTING OF SPLITTER PATES WITH NECESSARY HARD FACING AND REPAIRING OF EXTERNAL HOUSING USING STAINLESS STEEL CONFIRMING TO AISI-304.

2

-

-

... More
REPLACEMENT OF PIPE OF DIAMETER 10MM TO 40MM.

100

-

-

... More
ATTENDING MINOR LEAKAGE FROM PIPE, BEND, ETC AT DIFFERENT PLACES/LOCATION OF BOILER SIDE FROM "0"METER TO PENT HOUSE OF BOILER.

2

-

-

... More
REPLACEMENT OF (DAMAGED) GASKET OF MANHOLE OF BOILER DRUM WITH NEW ONE.

2

-

-

... More
REPLACEMENT OF MANHOLE OF BOILER DRUM WITH NEW ONE /REPAIRED /WITH OTHER BOILER DRUM MANHOLE.

2

-

-

... More
REPLACEMENT OF PHOSPHATE DOZING PUMP WITH NEW / SERVICED ONE. (COMPLETION PERIOD-4HRS)

2

-

-

... More
SERVICING OF PHOSPHATE DOZING PUMP.

2

-

-

... More
ALIGNMENT OF PHOSPHATE DOZING PUMP WITH MOTOR OF UNIT NO-7.

2

-

-

... More
DE-SCALING OF PRESSURE PARTS & REMOVAL OF SOOT FROM HEATING SURFACE OF BOILER BY STEAM BLOWING THROUGH WALL BLOWER/ LONG RETRACTABLE SOOT BLOWER (LRSB) FROM LOCAL/UCB PANEL OF BOILER OF UNIT NO-7.

200

-

-

... More
COMPLETE SERVICING/ REPAIRING/ REPLACEMENT OF JAMMED/ DAMAGED WALL BLOWER OF UNIT NO-7 FOR SMOOTH OPERATION AS AND WHEN REQUIRED.

150

-

-

... More
COMPLETE SERVICING/ REPAIRING/REPLACEMENT OF JAMMED / DAMAGED LONG RETRACTABLE SOOT BLOWER (LRSB) OF UNIT NO-7 FOR SMOOTH OPERATION AS AND WHEN REQUIRED.

150

-

-

... More
COMPLETE SERVICING/ REPAIRING/ REPLACEMENT OF STEAM VALVES OF WALL BLOWER AND LRSB'S OF UNIT NO-7 AS AND WHEN REQUIRED.

100

-

-

... More
REMOVAL OF CHOCK.IN APH A/B IN FLUE GAS SEC

2

-

-

... More
REMOVAL OF CHOCK.IN APH A/B IN PRIMARY SEC

2

-

-

... More
REMOVAL OF CHOCK.IN APH A/B IN SEC. SEC

2

-

-

... More
SERVICING OF FEED LINE GATE/CONTROL VALVES/NRV SIZE: NB-250MM, NP-260KG/CM2. VALVES COVERED ARE BFD-17,18,19,20,21,22

6

-

-

... More
SERVICING OF LOW LOAD LINE GATE & CONTROL VALVES SIZE: NB-100MM, NP-260KG/CM2. VALVES COVERED ARE FD-15,16,23.

6

-

-

... More
SERVICING OF PNEUMATICALLY OPERATED S/H, R/H ATTEMPERATION CONTROL VALVES & S/H, RH SPRAY BRANCH BLOCK VALVES.

16

-

-

... More
SERVICING OF SH COMMON BLOCK VALVE SD-1, RH COMMON BLOCK VALVE SD-6 AT THE INLET OF SH & RH SPRAY STATION, NP-254KG/CM2 , TEMP-239OC ( SD-1-NB-6"/4" & SD-6-NB-2")

4

-

-

... More
SERVICING OF MAIN ISOLATING VALVE OF MAIN STEAM LINE (L&R)MS-73 & MS-74,NB-244 MM,NP-260KG/CM2.

4

-

-

... More
SERVICING OF BYPASS VALVES OF MAIN STEAM VALVES- S-75,76,77,78, NB-60 MM, NP-139 KG/CM2.

4

-

-

... More
SERVICING OF BYPASS VALVE OF FEED STATION, NP-186KG/CM2.

4

-

-

... More
SERVICING OF BOILER DRUM SAFETY VALVES AT 44 METER ELEVATION OF BOILER. DESIGN PARAMETERS:- A)      SV1: PR-158.2 KG/CM2, TEMP.-346OC, SIZE-2.5"/6" B)      SV2: PR-162.9 KG/CM2, TEMP.-346OC, SIZE-3"/6"

2

-

-

... More
SERVICING OF ELECTROMAGNETIC RELIEF VALVE. (ERV-1538VX-10W) DESIGN PARAMETERS:- PR.-141.4 KG/CM2, TEMP.-540OC, SIZE-2.5"/4"

2

-

-

... More
SERVICING OF MS LINE SAFETY VALVE (SLSV-1740WD) DESIGN PARAMETERS:- PR-145.0KG/CM2, TEMP-540OC, SIZE-3"/6"

2

-

-

... More
SERVICING OF SAFETY VALVES INSTALLED ON HOT REHEAT AND COLD REHEAT LINE AT ABOUT 42 METER ELEVATION. DESIGN PARAMETERS:- A)      CRH SV-5, PR-41.9KG/CM2, TEMP.-359OC, SIZE 3"/6" B)      CRH SV-9, PR-42.7KG/CM2, TEMP.-359OC, SIZE-3"/6" C)      HRH SV-6, PR-39KG/CM2, TEMP.-540OC, SIZE-6"/8" D)      HRH SV-7. PR-39.80KG/CM2, TEMP.-540OC, SIZE-6"/8"

4

-

-

... More
SERVICING OF SOOT BLOWER LINE SAFETY VALVE INSTALLED AT 42 METER ELEVATION. DESIGN PARAMETER:-SV-8, PR-40.0KG/CM2, TEMP-420OC, SIZE-1.5"/ 2.5"

2

-

-

... More
SERVICING OF HIGH-PRESSURE VALVES & NRV'S AT DIFFERENT ELEVATION OF BOILER FROM '0' METER LEVEL TO 44 METER LEVEL NOMINAL BORE MAY VARY FROM Ф10 MM TO Ф100 MM.

5000

-

-

... More
REPLACEMENT OF FOLLOWING SIZE VALVES:-

-

-

-

... More
15 MM TO 25 MM VALVES

8

-

-

... More
40 MM TO 50 MM VALVES

8

-

-

... More
SERVICING/REPLACEMENT OF PNEUMATIC/MANUAL VALVES OF OIL STATION AT AB/CD ELEVATION.

12

-

-

... More
SERVICING/REPLACEMENT OF OIL LINE VALVES & NRV'S OF OIL STATION AT AB/CD ELEVATION OF BOILER.

500

-

-

... More
SERVICING OF PNEUMATIC OPERATED CONTROL VALVE SIZE NB 40 TO 100 MM AT DIFFERENT FLOORS OF BOILER FROM '0' METER LEVEL TO 44 METER LEVEL.

8

-

-

... More
SERVICING OF HAND OPERATED VALVE/NRV OF SIZE NB 40 TO 300 MM AT DIFFERENT FLOORS OF BOILER FROM '0' METER LEVEL TO 44 METER LEVEL.

8

-

-

... More
CHANGING FLANGE GASKETS OF VALVES AND FLANGE AT DIFFERENT FLOORS FROM '0' METER LEVEL TO 44 METER LEVEL OF BOILER. RATE SHOULD BE QUOTED PER MM BASIS.

5000

-

-

... More
REPLACEMENT OF GLAND PACKING WITH NEW ONE FROM VALVES LEAKING FROM GLAND. RATE SHOULD BE QUOTED PER MM BASIS.

3000

-

-

... More
ATTENDING LEAKAGES OF PIPELINE AND HEADERS ETC OF MAIN BOILER BY CUTTING, GRINDING AND HP WELDING OF DAMAGED PORTION OR PUTTING NEW SPOOLS/BENDS IF REQUIRED.

1400

-

-

... More
REPLACEMENT OF STARTUP VENT (S/H), AT 44-MTR ELEVATION.

2

-

-

... More
SYSTEM LINE UP FOR FILLING OF FEED WATER THROUGH LP DRAINS & PRESSURIZATION OF PRESSURE PARTS OF BOILER THROUGH FEED PUMP FOR HYDRAULIC TEST OF BOILER. NORMALIZATION OF THE SAME AFTER HYDRAULIC TEST AND MAKING SYSTEM FOR LIT-UP.

2

-

-

... More
REPLACEMENT OF HIGH PRESSURE VALVE/NRV OF FOLLOWING SIZES AT DIFFERENT ELEVATION OF MAIN BOILER.

-

-

-

... More
50MM TO 100 MM

4

-

-

... More
150MM

4

-

-

... More
200MM

4

-

-

... More
250MM AND ABOVE

2

-

-

... More
SERVICING/OVERHAULING OF ELECTRICALLY DRIVEN STEAM VALVE DIA-UP TO 100MM.

4

-

-

... More
SERVICING/OVERHAULING OF ELECTRICALLY DRIVEN STEAM VALVE DIA-100MM TO 250MM.

4

-

-

... More
REPLACEMENT OF HP DRAINS PIPE OF ANY SIZE, THICKNESS OF PIPE MORE THAN 6MM. RATE PER JOINT.

4

-

-

... More
PAINTING WORK

300

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.