Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Machinery and Tools
Eprocure
Opening Date30 Jan 2025
Closing Date21 Feb 2025
Tender Amount₹ 1,36,22,000 
Notes
Download

Costs

Summary

Biannual Maintenance Contract Of Boiler Pr Part And Associated Works

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Attending tube leakage from economizer and convective super heater as per procedure a) Attending tube leakage up to first 10 joints (irrespective of weld joints in one frequency)

8

-

-

... More
b) Attending tube leakage of each weld joint beyond 10 joints.

182

-

-

... More
Attending leakage of following parts (i) Platen super heater, (ii) Ceiling super heater tubes situated on the furnace top before paten super heater as per procedure annexed. A) Attending Tube leakages up to first 10 joints.

10

-

-

... More
B) Attending tube leakages of each weld joint beyond 10 joints.

170

-

-

... More
Attending tube leakages of following parts-i)Cold Reheat, ii)Hot Reheat, iii)Arch tubes, iv)Screen tubes, v)Extended water wall tubes, vi)Hanger tubes, vii)Exit S/H tubes, viii)Ceiling S/H tubes, ix)Headers Nipple tubes. a) Attending tube leakages up to 10 joints.

7

-

-

... More
b) Attending tube leakage of each weld joint beyond 10 joints.

150

-

-

... More
Attending tube leakages in SCW and extended super heater as per procedure annexed. a) Attending tube leakages up to first 10 joints.

7

-

-

... More
b) Attending tube leakages of each weld joint beyond 10 joints.

120

-

-

... More
Attending Pin hole crack of boiler tubes, headers stubs etc. in entire first pass, second pass, furnace zone, pent house etc.

16

-

-

... More
Attending the leakage of hand hole plates of different pressure part header by removing hand hole plates with hand hole cutting equipment, re-welding of the same after complete preparations and stress relieving of the same after welding if required.

8

-

-

... More
Attending the leakage of header stubs up to Ist ten stubs joints in one frequency of different pressure parts headers of boiler.

8

-

-

... More
Removal of damaged clamps/binders/scallop bars etc. and replacement/refitting of the same with new/repaired one in different zones of the pressure parts- a) 'U' Clamps

150

-

-

... More
b) Scallop Bars

150

-

-

... More
c) Binders, Support band, lugs

150

-

-

... More
d) Flexible Connectors (male/female)

150

-

-

... More
Fabrication of Hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating gas to required temperature of following materials - a) Carbon Steel.

24

-

-

... More
b) Alloy Steel.

24

-

-

... More
Replacement of eroded/damaged tubes/bends of pressure parts in different zones of boiler during preventive maintenance as per procedure mentioned in annexure of the following - a)Carbon Steel/Low alloy (T-11) joint.

8

-

-

... More
b)High alloy (T-22) joint.

8

-

-

... More
c)Stainless Steel joint.

8

-

-

... More
Cutting and removal of skin casing/high crown plate by grinder and welding the same with suitable electrode by high pressure welding method, after completion of repair jobs of pressure parts if any - a) Thickness - upto 15 mm

80

-

-

... More
b) Thickness - above 15 mm

80

-

-

... More
Erection of scaffolding and plateform in S-Panel and bottom ash hopper

6

-

-

... More
Fins welding of water wall & steam cooled wall (Single side of fin welding length).

1800

-

-

... More
Complete washing of Boiler - a) Complete washing of False Ceiling.

12

-

-

... More
b)Complete washing of Pent House.

12

-

-

... More
c)Complete washing of Dog House.

12

-

-

... More
d)Complete washing of Cat House.

12

-

-

... More
Complete washing of Re-heater gallery.

12

-

-

... More
Complete washing of all plateform (from 8m/l to 52m/l).

12

-

-

... More
Washing Over SA duct from APH outlet to wind box (L&R).

12

-

-

... More
Washing of wind box (L&R).

12

-

-

... More
Washing of area between front side of Boiler & RC Bunker

12

-

-

... More
Rectification/replacement of ash protectors/ shielding/cassette baffles found damaged/eroded /distorted or providing new protectors in the following pressure parts Zone of Boiler a)Tubular protectors/shielding of SH tubes,RH tubes,Water Wall tubes,LTSH Coils, Economizer coils and other area of boiler. For installation of protectors necessary scaffolding has to be made by the agency.

1500

-

-

... More
Box type protectors/cassette baffles of LTSH Coils, Economizer coils etc. For installation/rectification of protectors necessary scaffolding has to be made by the agency.

500

-

-

... More
Inspection of Pressure Parts Tubes and Build-up of eroded portion caused by ash/steam erosion using suitable welding electrode matching with parent metal composition by Arc/Argon welding of 250mm length, 35mm width.

610

-

-

... More
Erection of scaffolding and making approaches for checking of pressure parts tubes for rectification of defect, If any, in the following areas/zones and dismantling after completion of work a)Super Heater/RH /W.W. Screen tube/SH screen tube/Low temperature super heater/ Economizer etc in single layer/elevation.

28

-

-

... More
b)Super Heater/RH/W.W. Screen tube/SH screen tube/Low temperature super heater/ Economizer etc in multi layer/elevation.

16

-

-

... More
Mobilization of team, Installation & Fixing of sky climber in boiler furnace after making proper plateform on bottom ash hopper. Dismantling and removal of sky climber/ash hopper plateform after completion of job.

12

-

-

... More
Shifting of sky climber in boiler furnace at different location and inspection of various pressure part zones.

26

-

-

... More
Operation of Sky Climber up to 24 hrs.

12

-

-

... More
Operation of Sky Climber outside of boiler for checking its healthiness.

5

-

-

... More
Servicing of control panel box of sky climber (motorized rope climbing machine).

4

-

-

... More
Servicing of gear box, break assembly, internal drums and rollers of sky climber motor assembly.

4

-

-

... More
Work of Loading/unloading/stacking & up keeping of site stor/transportation of material/spares from Sore Division to site store of BMD-I/BMD-III, Obra.

400

-

-

... More
Removal of accumulated soot from heating surface by way of wall blowers No. 01 to 56 for unit no 9th 10th & 11th, 3×200MW, BTPS, Obra. (During 8:00 hrs. Time-9:30 hr to 17:30 hr)

640

-

-

... More
Removal of accumulated soot from heating surface by way of wall blowers No. 01 to 56 for unit no. 12th & 13th, 2×200MW, BTPS, Obra. (During 8:00 hrs. Time-9:30 hr to 17:30 hr)

640

-

-

... More
Servicing of RWSE water wall deslagger

750

-

-

... More
Replacement of Flange Gasket of head valve assembly of Wall Blower &Orifice of soot blowing system

264

-

-

... More
Servicing of gear boxes of Rotary/Traverse motion of wall blowers.

36

-

-

... More
Replacement of damaged Swivel Tube of Wall Blowers

36

-

-

... More
Complete servicing/Provisioning of head valve of wall blower.

130

-

-

... More
Rectification of LTSH lower bank coils by replacing U bends, 90̊ bends and straight tubes (Rectification will involve at least 16 nos. joints which may be more depending on condition of coil)

40

-

-

... More
Rectification of economizer coils by replacing U-bends, Straight tubes, their alignment & clamping (Rectification will involve 16 nos. joints which may be more depending on condition of coil).

40

-

-

... More
Rectification of Re-heater coils by replacing bends, Straight tubes, their alignment & clamping (Rectification will involve 16 nos. joints which may be more depending on condition of coil. And fabrication of bend is also included in scope of work, if bends are not available).

20

-

-

... More
Work of breakdown maintenance of main boiler, round the clock boiler checking and gun cleaning in units-9 10 11 12 and 13 of 5x200 MW units” Servicing of oil gun guide assy at AB, CD & EF elevation by replacement of damaged parts by new one.

16

-

-

... More
Repairing of eroded adjustable coal nozzle tip when the same is lying outside

24

-

-

... More
Repairing of eroded coal nozzle when the same is lying outside

22

-

-

... More
Replacement of coal burner assy. by new/repaired one.

12

-

-

... More
Replacement of oil gun assy at AB, CD & EF elevation by new/ repaired one.

32

-

-

... More
Repairing of guide assembly at elevation AB, CD & EF.

8

-

-

... More
Repairing/replacement of scanner guide assly.

8

-

-

... More
Repair/replacement of scanner and opening the bolts of flange & taking it out.

8

-

-

... More
Repair/Refitting of scanner guide assembly.

8

-

-

... More
Replacement of air nozzle by new/repaired one.

8

-

-

... More
Repairing of buldge/burnt air nozzles.

8

-

-

... More
Repairing & replacement of defective/burnt air nozzle.

8

-

-

... More
Servicing of secondary air damper in wind box.

32

-

-

... More
Repairing of secondary air damper in wind box.

32

-

-

... More
Repairing of Manhole of boiler.

12

-

-

... More
Replacement of packing of manholes.

20

-

-

... More
Repairing of Boiler Peep Holes.

24

-

-

... More
Replacement of packing of Boiler peep holes.

24

-

-

... More
Providing pin of spring/hanger supports of feed line,steam lines.

24

-

-

... More
Furnace Ceiling repairing by cutting & welding in Pent House.

40

-

-

... More
Welding of Hot & cold primary & secondary air ducts.

200

-

-

... More
Alignment and fixing of supports of hot air ducts.

12

-

-

... More
Laying of HP steam/water pipelines of dia 15 mm to 100 mm.

70

-

-

... More
Two coat hard facing (One horizontal & one vertical at the distance of ½” on any equipment).

5

-

-

... More
Cleaning & disposal of fly ash and foreign material Wind box (Right)

5

-

-

... More
Cleaning & disposal of fly ash and foreign material Wind box (Left)

5

-

-

... More
Cleaning & disposal of fly ash and foreign material Cat house (Front & rear)

5

-

-

... More
Removal fly ash from economizer chamber at 35 M/L.

5

-

-

... More
Removing fly ash from the gallery between Re-heater & arch tubes.

5

-

-

... More
Removing fly ash form the gallery between exit super heater & hanger tubes of convective super heater.

5

-

-

... More
Removing fly ash from second pass.

5

-

-

... More
Removing fly ash from the gallery between platen super heater and cold reheat headers in pent house

5

-

-

... More
Removing fly ash from the galleries in left & right of the pent house, between water tubes & skin cashing.

5

-

-

... More
Removing fly ash from the gallery between cold reheat and hot reheat header in pent house.

10

-

-

... More
Cleaning of riser tube economizer water wall & connecting tubes of super heaters by means of wire brush and old clothes.

8

-

-

... More
Alignment and providing proper supports to rods of buck stay furnace economizer & super heater zone from 16 M/L to 48 M/L in boiler.

12

-

-

... More
Rectification of guide pipe & plates of hydraulic seals at all the four sides above bottom ash hopper.

20

-

-

... More
Rectification of hinge supports of wind box of boiler at 19 M/L (L&R).

6

-

-

... More
Rectification of Tie Rods in Pent House of 48 M/L side at boiler.

6

-

-

... More
Servicing & repairing of hanger supports of Main steam, cold reheat,hot reheat, feed line and down corners of boiler form 13 M/L to 54 M/L.

20

-

-

... More
Making coal compartment assly by making coal nozzles with seal plate & adjustable seal nozzle SS tips.

20

-

-

... More
Replacement of worn out and damaged railing of boiler from zero meter to 54 M/L by old & used economizer tubes.

20

-

-

... More
Repairing/replacement of corner attachment of water wall and super heater.

8

-

-

... More
Alignment of buck stay beam (Horizontal & Vertical) from 8 M/L to 48 M/L.

8

-

-

... More
Strengthening & alignment of scanner angles of furnace.

8

-

-

... More
Cleaning & disposal of fly ash and foreign material From Dog House

7

-

-

... More
Cleaning & disposal of fly ash and foreign material Above furnace top and inside Pent House.

6

-

-

... More
Cleaning & disposal of fly ash and foreign material Below drum inside the Pent House.

6

-

-

... More
Servicing/Overhauling of fill pump.

7

-

-

... More
Servicing/Overhauling of Washing Pump

4

-

-

... More
Shifting washing pump from 10th Unit Boiler 16 mtr, corner no.1 to 12th Unit Boiler 16 mtr, corner no.1 & then after completion of work again shifting to 10th Unit.

6

-

-

... More
Fitting of chucker plates/plates/new/old grills with supporting ‘I’ beams/Channels /angles up to 150 mm by replacements.

60

-

-

... More
Replacements of ‘I’ beams/Channels 200/250 mm size of the required length up to 5m long of platform by cutting and welding.

6

-

-

... More
Replacements of ‘I’ Beams of size 300 mm and above of required length up to 5m long of platform by cutting and welding.

6

-

-

... More
Fabrication and Repairing of ladders.

30

-

-

... More
Cleaning of Filter of Scanner Fan

52

-

-

... More
Replacement of scanner Fan Impeller

8

-

-

... More
Round the clock Checking of Boiler, Oil Gun Cleaning/ replacement, Cleaning of coal dust from furnace zone for Unit 9, 10 &11.

2190

-

-

... More
Round the clock Checking of Boiler, Oil Gun Cleaning/ replacement, Cleaning of coal dust from furnace zone for Unit 12&13

2190

-

-

... More
Annual breakdown /running maintenance of H.P./ L.P. valve of Boiler sde of 5X200MW, BTPS, Obra Servicing of Feed line / Steam line gate valves / control valves viz.V2-116/V2-117/V2-85/V2-86/FCV-1&7/ V2- 48/56 (L/R) / E2 etc.

18

-

-

... More
Servicing of E-2 NRV (Nb-300mm, Np-250 Kg/cm2).

4

-

-

... More
Servicing of Low Load line gate valves / Control Valve(FCV-2).

4

-

-

... More
Servicing of pneumatically operated S/H spray valve (E-19). Valve size Nb150mm, NP-250Kg/cm2.

4

-

-

... More
Servicing of pneumatically operated R/H spray (R-17) valve.

4

-

-

... More
Servicing of pneumatically operated S/H / R/H spray control /isolating valves.

9

-

-

... More
Servicing of bypass valve of main steam line valve.

4

-

-

... More
Servicing of boiler drum safety valves at 52meter elevation.

6

-

-

... More
Servicing of electromagnetic relief valve (implus safety valve).

2

-

-

... More
Servicing of safety valves installed on hot reheat, cold reheat line and main steam line on right hand side of boiler at 52meter elevation.

6

-

-

... More
Servicing of safety valve on soot blower line at 52mtr elevation.

4

-

-

... More
Servicing of following sizes Valves- a)15 mm to 25 mm Valves.

10

-

-

... More
b)40 mm to 50 mm Valves.

8

-

-

... More
c)65 mm Valves.

10

-

-

... More
d)100 mm Valves.

10

-

-

... More
e)150 mm to 200 mm Valves.

8

-

-

... More
Servicing of high-pressure valve & NRV’s at different elevation from ‘0’meter level to 54meter level nominal bore may vary from Ø10mm to Ø100mm.

1108

-

-

... More
Servicing of L.P. Valves of Air Line,/Oil Line / Water Line

1100

-

-

... More
Replacement/Servicing of the following Actuators- a)V2-116/ 117/ V2-85 / 86/ V2-48/56 (L/R)/ E-2 Valves.

10

-

-

... More
b) B-55/ S-16 and soot blower isolating Valve size 65 mm.

7

-

-

... More
Replacement of following sizes Valves - a)15 mm to 25 mm Valves.

7

-

-

... More
b)40 mm to 50 mm Valves.

7

-

-

... More
c)65 mm to 70 mm Valves.

7

-

-

... More
d)100 mm Valves.

6

-

-

... More
e)150 mm to 200 mm Valves.

6

-

-

... More
f)R-17 Valves.

4

-

-

... More
Changing flange gasket of valve at different elevation of boiler.

2400

-

-

... More
Replacement of gland packing with new one.

2400

-

-

... More
Replacement of various safety valves of such as Boiler Drum/Main Steam/CRH/HRH line etc.

4

-

-

... More
Replacement of high Pressure valves (motor operated / hand operated/ Pneumatic operated) of critical piping of Boiler of size: Nb-40mm to 65mm.

2

-

-

... More
Replacement of Bends/Straights of High Pr. Drain Line/Air Vent Line/Air Line (Up to one meter length) - a)Size Ø 16 mm X 1.5 mm to Ø 44.5 mm X 4.5mm.

12

-

-

... More
b)Size Ø 45 mm X 4.5 mm to Ø 80 mm X 7.1 mm.

12

-

-

... More
Welding of Main Steam Line Joint By TIG Welding.

2

-

-

... More
Repairing of Main Steam Line Joint.

2

-

-

... More
Welding of Cold Reheat / Hot Reheat Line.

6

-

-

... More
Attending minor leakage from Pipe & Bends.

10

-

-

... More
Replacement of 300 mm Valves of Feed Line /Main Steam Line.

2

-

-

... More
Replacement/Repairing of shade at the different area of Boiler side.

4

-

-

... More
Replacement of gasket of manhole of boiler drum.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.