Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Machinery and Tools
Eprocure
Opening Date22 Oct 2024
Closing Date29 Nov 2024
Tender Amount₹ 27,37,124 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Maintenance of CW pumps and its associated duct. , valves, EOT etc. except TWS of Unit No 07 CTPS, Kasimpur, Aligarh for the period of Two Years.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.04 M.S.Pipe line of 175,200, 250, 300mm

10

-

-

... More
2. Leakage attending:- 2.01 Pipe size 50,75,100mm

20

-

-

... More
2.02 Pipe size 125, 150,200mm

20

-

-

... More
3. Fabrication and fitting of cut bends. 3.01 Pipe size dia 50,60,80mm

10

-

-

... More
3.02 Pipe size dia 100,125,150,200mm

10

-

-

... More
4. Fabrication and fitting of flanges by welding. 4.01 size 100,125,150mm dia

10

-

-

... More
4.02 size 175,200mm dia

10

-

-

... More
4.03 size 250,300mm dia

8

-

-

... More
5. Attending leakages through lead filling 5.01 To attend leakages from 100/150mm dia CI Underground line.

2

-

-

... More
6. Floor Cleaning and up keeping of Intake Pump House, ABC Pump House and C.T. Pump House in general shift.

730

-

-

... More
7. Complete cleaning of Basin of ABC, cooling tower

2

-

-

... More
8. Complete cleaning of Pit of Sump Pump at ABC Pump House

2

-

-

... More
9. Round the Clock cleaning of wire mesh frame installed at inlet gate of CW Pump suction pit and preventive maintenance, up keeping, attending of breakdown minor fault only, and to meet out operational requirement of all ABC Pumps, ABC cooling tower, service/sealing pumps, CT Pumps, CW high head Pump, Makeup Pumps, Tube-wells, Sump Pumps and Trolley pumps etc.

1095

-

-

... More
10. Shifting of unworkable pump and placing new repaired pumps 10.01 Sump pumps (vertical)

1

-

-

... More
10.02 Trolley pump

1

-

-

... More
10.03 Auxiliary Bearing cooling pumps

1

-

-

... More
10.05 Service/ Sealing pumps

1

-

-

... More
10.05 Condensate transfer pump

1

-

-

... More
10.06 Make-up pump

1

-

-

... More
11.0 Overhauling of defective pumps at site 11.01 Sump pumps (vertical)

5

-

-

... More
11.02 Trolley pump

9

-

-

... More
11.03 Auxiliary Bearing cooling pumps

10

-

-

... More
11.04 Service /Sealing pumps

10

-

-

... More
11.05 Make-up pump

2

-

-

... More
11.06 Condensate transfer pumps

4

-

-

... More
12.0 Decoupling alignment and coupling of pumps with motor 12.01 Sump pumps(vertical/ Horizontal)

8

-

-

... More
12.01ABC Pumps

10

-

-

... More
12.03 service/Sealing pumps

10

-

-

... More
12.04 Make up pumps

2

-

-

... More
12.05Condensate transfer pump

3

-

-

... More
13.00 Replacement/Inspection of bearing & sleeve (both) 13.01 Auxiliary Bearing cooling pumps

5

-

-

... More
13.02 Condensate transfer pumps

3

-

-

... More
14.00Replacement/repairing of Gear box fan of ABC/CW cooling tower 14.01Replacement & alignment of fan blades

2

-

-

... More
14.02 Replacement of Gear box

2

-

-

... More
14.03 Repairing/overhauling of Gear box

1

-

-

... More
15. Replacement of tube-well complete

3

-

-

... More
16.00 Replacement of components of auxiliaries/ equipment’s: 16.01 Expansion joints

1

-

-

... More
16.02 Butterfly valves

2

-

-

... More
16.03 Gate valves/NRVs of 25mm, 40mm, 50mm size

6

-

-

... More
16.04 Gate valves/NRVs of 65mm, 75mm 100mm ,125mm , 150mm

6

-

-

... More
16.05 Gate valves/NRVs of 175mm 200mm, 250mm, 300mm

1

-

-

... More
16.06 Valve of size 450mm

1

-

-

... More
17.00 Servicing of Water valves of size 17.01 Gate valve/NRV of 25mm, 40mm, 50mm

3

-

-

... More
17.02 Gate valve/NRV of 65mm, 75mm, 100mm

6

-

-

... More
17.03 Gate valve/NRV of 125mm, 150mm

8

-

-

... More
17.04 Gate valve/NRV of 175mm, 200mm

2

-

-

... More
17.05 Gate valves/NRV of 250mm, 300mm, 450mm

1

-

-

... More
17.06 Butterfly valves of 900mm

1

-

-

... More
17.07 Gear box of butterfly valve

1

-

-

... More
18. Inspection of Butterfly valve/sheet size 900mm

1

-

-

... More
19 Inspection/Bearing replacement of Butterfly valve Gear box

1

-

-

... More
Repairing of Component High Head Pump 1 Head Shaft

1

-

-

... More
2 Transmission Shaft

1

-

-

... More
3. Impeller Shaft

1

-

-

... More
4. Upper Bowl

1

-

-

... More
5. Lower Bowl

1

-

-

... More
6. Spider

1

-

-

... More
7. Bearing Insert Bush

1

-

-

... More
8. S.S. Impeller

1

-

-

... More
(B )Fabrication and fitting of Sleeve 1. Fabrication of Gland Sleeve and fitted on Head Shaft with circlip.

1

-

-

... More
2. Fabrication of Hot Sleeve and fitted on Transmission Shaft with circlip.

1

-

-

... More
3. Fabrication of Sleeve for Impeller Shaft. (I ) Sleeve under lower bowl (material Bronze)

1

-

-

... More
(II) Sleeve under upper bowl (material Bronze)

1

-

-

... More
(III) Cast Iron distance sleeve of size:- a) L-340mm, OD-130mm, ID-120 mm,

1

-

-

... More
b) L-200mm, OD-130mm, ID-120 mm

1

-

-

... More
c) L-185mm, OD-130mm, ID-120

1

-

-

... More
d) L-25mm, OD-150mm, ID-120

1

-

-

... More
4. Fabrication of Collar (material CI)

1

-

-

... More
5. Fabrication of Shell of rubber Bearing

2

-

-

... More
6. Fabrication of Impeller Nut(Bronze)

1

-

-

... More
7. Fabrication of Lock Nut & Lift Nut(S.S.)

1

-

-

... More
8. Fabrication of Key

4

-

-

... More
9. Fabrication of S.S. Studs with double nuts

125

-

-

... More
(C) Rerubberisation of Shell of high head pump 1. Spider Shell(OD162,ID 130,280L)

1

-

-

... More
2. Insert Bush Shell(OD147,ID 130,240L)

1

-

-

... More
(D) Rebabbiting old bearing of high head 1. Rebabbiting of Thrust bearing housing

1

-

-

... More
(E) Dismantling and Commissioning of Pump at Site

1

-

-

... More
(F) Make up water pump (No of Installed Qty-3) 1. Dismantling of pump for internal inspection of parts at site.

1

-

-

... More
2.0 Complete repairing of the following components 2.1 Stage Body

1

-

-

... More
2.2 Impeller

1

-

-

... More
2.3 Dynamic Balancing of rotating components within accuracy (Rotor, Impeller)

1

-

-

... More
3.0 Repairing of shaft by metalizing and machining to get original profile and removal of shaft run out within 0.02mm. 3.1 Head shaft

1

-

-

... More
Impeller shaft

1

-

-

... More
4.0 Fabrication of following components as per actual/sample and fitting in pump from own material of the contractor 4.1 Re-rubberization brass bearing

1

-

-

... More
4.2 Threaded barrel coupling (SS Material)

1

-

-

... More
4.3 Distance sleeve (SS Material)

1

-

-

... More
4.4 Gland Sleeve(SS Material)

1

-

-

... More
4.5 Lifting Nut(SS Material)

1

-

-

... More
4.6 Lock Nut(SS Material)

1

-

-

... More
4.7 Thrust Bearing housing (C.I.)

1

-

-

... More
4.8.0 S.S. Fastners 4.8.1Re-rubberization brass bearing

1

-

-

... More
4.8.2 Length 85 MM,OD 12 MM

1

-

-

... More
4.9 Neck ring/wear ring for Bell mouth

1

-

-

... More
4.10Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts nipples/packing’s etc. to be arranged by firm at their own cost.

1

-

-

... More
4.11 Erection & commissioning of the pump at site.

1

-

-

... More
(G) Auxiliary Bearing Cooling Pump (No of Installed Qty-5) 1. Dismantling of pump for internal inspection of parts at site.

1

-

-

... More
2.0 Fabrication and replacement of undernoted parts from the own material of the contractor 2.1 Shaft of EN-8 steel

1

-

-

... More
2.2 Gland sleeve (S.S.)

1

-

-

... More
2.3 Sleeve Nut / Lock Nut (S.S.)(2 DE&2NDE)

1

-

-

... More
2.4 Packing gland Assembly / gland stocker(C.I.)

1

-

-

... More
2.5 Wearing Ring for casing (C.I.)

1

-

-

... More
2.6 Lock Nut for Bearings with Lock washer (S.S)

1

-

-

... More
3. Repairing of pump casing at bearing portion by welding with CI electrodes and machining

1

-

-

... More
4. Repairing of bearing housing

1

-

-

... More
5. Repairing of impeller (gun metal)

1

-

-

... More
6. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost

1

-

-

... More
7. Erection & commissioning of the pump at site.

1

-

-

... More
(H) Sealing Pumps :- ( (No of Installed Qty-5) 1. Dismantling of pump for internal inspection of parts at site.

1

-

-

... More
2.0 Fabrication and replacement of undernoted parts from the own material of the contractor 2.1 Shaft of EN-8 steel

1

-

-

... More
2.2 Gland sleeve (SS)

1

-

-

... More
2.3 Impeller Nut (S.S.)

1

-

-

... More
2.4 Packing gland Assembly/Gland Stoker (C.I.)

1

-

-

... More
2.5 Wearing Ring for casing (G.M.)

1

-

-

... More
3 Repairing of impeller

1

-

-

... More
4 Repairing of pump casing at bearing portion by welding With CI electrodes and machining

1

-

-

... More
5 Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost

1

-

-

... More
6. Erection & commissioning of the pump at site.

1

-

-

... More
(I)Sump Pump(vertical / horizontal) (installed Qty. 6 Pumps) 1.0 Fabrication and replacement of undernoted parts from the own material of the Contractor. 1.1 Gland Sleeves (S.S)

1

-

-

... More
1.2 Shaft of EN-8 Steel for horizontal Sump pump

1

-

-

... More
1.3 Shaft of EN-8 Steel- for vertical Sump pump

1

-

-

... More
1.4 Impeller Nut(SS)

1

-

-

... More
1.5 Packing gland Assembly Gland Stoker(C.S)

1

-

-

... More
1.6 Wearing Ring for casing.

1

-

-

... More
1.7 Impeller C.I.

1

-

-

... More
1.8 Bush (Material GM)

1

-

-

... More
2. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost.

1

-

-

... More
Diesel trolley pump (No of Installed Qty-1) 1.0 Fabrication and replacement of undernoted parts from the own material of the Contractor. 1.1 Gland Sleeves (S.S)

1

-

-

... More
1.2 Shaft of EN-8 Steel-

1

-

-

... More
1.3 Impeller Nut(SS)

1

-

-

... More
1.4 Packing gland Assembly Gland Stoker(C.S)

1

-

-

... More
1.5 Wearing Ring for casing (Gun Metal)

1

-

-

... More
1.6 Impeller C.I.

1

-

-

... More
1.7 Bush (Material GM)

1

-

-

... More
2. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost

1

-

-

... More
(K)Dewatering Trolley Pump (No of Installed Qty-4) 1.0 Fabrication and replacement of undernoted parts from the own material of the Contractor. 1.1 Gland Sleeves (S.S)

1

-

-

... More
1.2 Shaft of EN-8 Steel-

1

-

-

... More
1.3 Impeller Nut(SS)

1

-

-

... More
1.4 Packing gland Assembly Gland Stoker(C.S)

1

-

-

... More
1.5Wearing Ring for casing (Gun Metal)

1

-

-

... More
1.6 Impeller C.I.

1

-

-

... More
1.7 Bush (Material GM)

1

-

-

... More
2. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost.

1

-

-

... More
(L) Condensate Transfer pumps :- (No of Installed Qty-3) 1. Complete dismantling of the pump at site and checking of its all internals for measuring the run outs, status of wear out etc

1

-

-

... More
2.0 Fabrication and replacement of following spares from the own material of the contractor 2.1 Gland sleeves (Material Phosphorus Bronze)

1

-

-

... More
2.2 Wearing rings (Material Gun Metal)

1

-

-

... More
2.3 Distance bushes (Material Gun Metal)

1

-

-

... More
2.4 Balancing disc (Material Gun Metal)

1

-

-

... More
2.5 Fabrication & Fixing of Impellers (Mat. Phosphor Bronze)

1

-

-

... More
3. Repairing of wearing disc.

1

-

-

... More
4. Repairing of stage bodies and suction & discharge covers

1

-

-

... More
5. Dynamic balancing of rotor with impeller assembly

1

-

-

... More
6. Repairing of impeller (gun metal )

1

-

-

... More
7. Repairing of bearing housing

1

-

-

... More
8. Repairing of shaft

1

-

-

... More
9. Repairing of diffuser

1

-

-

... More
10. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost

1

-

-

... More
11. Erection & commissioning of the pump at site.

1

-

-

... More
(M) Submersible pumps of tube-well (Qty. 03Job) 1. Complete repairing and fabrication of different parts of submersible pump for tube-well.

2

-

-

... More
(N)Overhauling of motor (1000KW) of High head of CW Pump of Unit No. 7, (110 MW), HTPS Kasimpur, Aligarh

2

-

-

... More
(O) Complete repairing of weda/mody submersible pump including Rewinding of motor & replacement of damaged parts.(capacity of 7.5 KW)

3

-

-

... More
(P) Complete repairing of weda/mody pump including Rewinding of motor & replacement of damaged parts.(capacity of 3.7/3.8/5 KW)

3

-

-

... More
(Q) Operation and Up keeping works of EOT Crane having capacity 15MT installed at intake pump house of unit no. #7 (110 MW) HTPS, Kasimpur, Aligarh.

300

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.