Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date24 Oct 2024
Closing Date5 Dec 2024
Tender Amount₹ 71,74,322
Costs
EMD
₹ 1,14,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RVUNL_967658_1Tender No
ET-01 OMC-III CIMD-I Hdj DTPS 2024-25Tender Authority
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited ViewPurchaser Address
-Website
http://https://uprvunl.org/uprvunl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
HEA Igniter
192
-
-
240 VAC/220 VDC solenoid actuators for oil, steam, air & scavenge valve and 240VAC solenoid operated gate
576
-
-
SADC (SECONDARY AIR DAMPER CONTROL)
730
-
-
Gravimetric RC Feeders
144
-
-
Max – DCS System
384
-
-
Pneumatics Actuator
984
-
-
Solenoid valves
4248
-
-
POWER CYLINDER
240
-
-
UPS & BATTERY SYSTEM
1460
-
-
Field Instruments
44448
-
-
Hydrastep and its ckt. (BHEL vision -20M for drum level)
240
-
-
Annunciation system and Unit Control Panel
72
-
-
VMS System
96
-
-
HP Bypass & LP Bypass system
96
-
-
Turbovisory A)Vibration probes B)Differential C) Expansion probes
D)Axial shift probes
E)Speed sensor
48
-
-
Turbine control A) Turbine interlock and protection B) EHTC
48
-
-
Auxiliaries control A) Auxiliary interlock and protection B) Auto control loops
48
-
-
PART-B Breakdown maintenance:-
-
-
-
SAFE FLAME SCANNERS CALIBRATION
80
-
-
CHECKING OF IGNITOR SPARK TIP /CORNER
20
-
-
Gravimetric RC Feeders Calibration Assistant and Checking
20
-
-
Pneumatics Actuator
136
-
-
Solenoid valves
292
-
-
POWER CYLINDER
10
-
-
Field Instruments
5800
-
-
REPLACEMENT OF ELECTRODES IN HYDRASTEP
44
-
-
LIMIT SWITCH MAINTENANCE
560
-
-
ELECTRICAL ACTUATORS/STROKE CONTROLLER
156
-
-
Replacement of vibration probe of VMS
44
-
-
Cable laying as and when required.
3400
-
-
Breakdown maintenance fo 0.4 KV modules and closed loop circuit of Soot blower .
4
-
-
Checking, servicing/repairing of Limit Switches, push buttons, ON/OFF contacts and checking of control cable &power cable as and when required.
20
-
-
Overhauling of soot blower motors along with repairing of DE/NDE bearing seat, DE/NDE side motor end covers and key groove on rotor shaft.
10
-
-
Replacement of terminal plate , motor end covers , grease plate and groove key if found damaged.
8
-
-
Servicing/seal kit replacement of power cylinder of HAG & Feeder O/L gate, SADC & Burner tilt.
6
-
-
Servicing/calibration of positioner used in SADC, burner tilt.
20
-
-
Servicing/calibration of I/P used in SADC, burner tilt.
80
-
-
Servicing/calibration of air filter regulator, air lock relay used in SADC, burner tilt.
80
-
-
HP Bypass & LP Bypass system
48
-
-
Work pertain to 1x110 MW, CTPS (Routine , Preventive & Breakdown Maintenances)
-
-
-
Round the clock routine operation, checking, periodic logging, healthiness, safeness of C&I system in reserve condition of 1x110 MW Unit No.#07, Harduaganj Thermal Power Station,under jurisdiction of C&IMD-I, DTPS
130
-
-
Round the clock routine operation, checking, periodic logging, healthiness, safeness of C&I system in reserve condition of 1x110 MW Unit No.#07, Harduaganj Thermal Power Station, under jurisdiction of C&IMD-II, DTPS
130
-
-
Round the clock operation, routine&Preventive maintenance of C&I system in running condition of 1x110 MW Unit No.#07, Harduaganj Thermal Power Station, under jurisdiction of C&IMD-I, DTPS
600
-
-
Round the clock operation, routine&Preventive maintenance of C&I system in running condition of 1x110 MW Unit No.#07, Harduaganj Thermal Power Station, under jurisdiction of C&IMD-II, DTPS
600
-
-
Up-keeping & Cleaning of all the C&I equipment, including floor cleaning of various PLC/ UPS/ AC Rooms of UCR &/ EWS/Lab/ Battery/SWAS/AC Chiller plant & AHU Room Analyzer rooms etc. of 1x110 MW Unit No.#07, H.T.P.S., Kasimpur, as per scope of work under jurisdiction of C&IMD-II, DTPS
626
-
-
Work pertain to Preventive & Breakdown maintenance of Hirel-Hitachi make UPS System for DTPS & CTP
-
-
-
Preventive Maintenance Services, 06 Visits (Four Monthly)/(01 man x 2days/visit) as per scope of work for DTPS for a period of 02 years (Non Comprehensive AMC) related to C&IMD-I&II div.
12
-
-
Preventive Maintenance Services, 06 Visits (Four Monthly)/(01 man x 1days/visit) as per scope of work for CTPS for a period of 02 years (Non Comprehensive AMC) related to C&IMD-I div.
6
-
-
Breakdown Maintenance Services, 04 Visits (as and when required)/(01 man x 1days/visit) as per scope of work for DTPS as per site requirement for a period of 02 years(Non Comprehensive AMC) related to C&IMD-I&II div.
4
-
-
Breakdown Maintenance Services, 02 Visits (as and when required)/(01 man x 1days/visit) as per scope of work for CTPS as per site requirement for a period of 02 years (Non Comprehensive AMC) related to C&IMD-I div.
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%