Uttar Pradesh Projects Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Projects Corporation Limited - UPPCL Tender
Civil And Construction
Road Construction
Eprocure
Opening Date4 Mar 2024
Closing Date11 Mar 2024
Tender AmountRefer Documents
Costs
EMD
₹ 47,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPPRC_910859_1Bid Award Id
ViewTender No
25/PM-10/UPPCL/2023-24Tender Authority
Uttar Pradesh Projects Corporation Limited ViewPurchaser Address
-Website
http://http://upprojects.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.
77.4
1610
124614
... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.
79.7
3515
280145.5
... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete
34.1
5035
171693.5
... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P
708
19
13452
... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work
70.78
5320
376549.6
... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.
236
52
12272
... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.
75
123
9225
... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)
2.4
6365
15276
... More
M.S. work in RCC
2.36
7680
18124.8
... More
Fixing of sign board & photography
1
6175
6175
... More
from Roshni House to Pawan Nishad Tube Well
-
-
-
... More
Earth work in embankment b y cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete.
308.7
194
59887.8
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.
90.3
1445
130483.5
... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.
93.75
3515
329531.25
... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete
43.92
5035
221137.2
... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P
822
19
15618
... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work
87.9
5320
467628
... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.
274
52
14248
... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.
99
123
12177
... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)
1.44
6365
9165.6
... More
M.S. work in RCC
0.9
7680
6912
... More
Fixing of sign board & photography
1
6175
6175
... More
GST Extra as per applicable
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements