Uttar Pradesh Projects Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Projects Corporation Limited - UPPCL Tender

Works
Cable and Wires
Eprocure
Opening Date27 Dec 2021
Closing Date5 Jan 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.C.C works with cement approved coarse sand F.M (2.2 to 3.6) and 20mm guage approved stone grit in the proportion of 1:1.5:3( 1cement: 1.5 approved coarse sand : 3 graded stone aggregate 20mm) in Raft Foundation & Footing excluding supply of reinforcement and its bending the same with 24 BWGGI Binding wire and including necessary centering and shuttering etc. and also including supply of all materisls, labour and T&P and curing etc required for proper completion of the work.Stength of the concrete shall not be less than M-20

25.83

-

7400.5

... More
R.C.C works with cement approved coarse sand F.M (2.2 to 3.6) and 20mm guage approved stone grit in the proportion of 1:1.5:3( 1cement: 1.5 approved coarse sand : 3 graded stone aggregate 20mm) in Column excluding supply of reinforcement and its bending the same with 24 BWG Binding wire and including necessary centering and shuttering etc. and also including supply of all materisls, labour and T&P and curing etc required for proper completion of the work.Stength of the concrete shall not be less than M-20 upto (upto floor two level) SI no. 289

26.87

-

9082

... More
R.C.C works with cement approved coarse sand F.M (2.2 to 3.6) and 20mm guage approved stone grit in the proportion of 1:1.5:3( 1cement: 1.5 approved coarse sand : 3 graded stone aggregate 20mm) in beam excluding supply of reinforcement and its bending the same with 24 BWGGI Binding wire and including necessary centering and shuttering etc. and also including supply of all materisls, labour and T&P and curing etc required for proper completion of the work.Stength of the concrete shall not be less than M-20

29.97

-

8987

... More
Mild Steel or iron in plain work such as reinforced brick work( when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured

130.2

-

4574

... More
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire

7465.83

-

9.72

... More
Jungle Cleaning

3100

-

2.8

... More
M.S GATE (2 NOS.)

-

-

-

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches including all T & p etc complete

5.76

-

114

... More
Cement concrete with 4 CM guage approved stone ballast approved coarse sand and cement in the proportion of 8:4:1 including supply of all material labour and tools and plants etc required for proper completion for the work.

0.86

-

5163

... More
R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in Foundation excluding supply of reinforcement and its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item.

1.1

-

7400.5

... More
R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in Column excluding supply of reinforcement and its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item.

1.29

-

9082

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work ( when not wrought to include in overall rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level.TMT FE 500(SI no. 504)

2.81

-

4574

... More
12mm thick plaster with cement mortar consisting of 1 part cement and 6 part of approved coarse sand minimum thickness not to be less than 10mm including supply of all material labour & T & P etc required for proper completion of work.

14.4

-

121.6

... More
Finishing walls with water-proofing on cement paint of approved make and quality on new work with two coat to give an even shade including supply of all material labour tools and plants etc required for proper completion of the work but for each coat of water proof cement paint after the first two coats eo give an even shade (PWD-660+661)

14.4

-

61.7

... More
Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes,fine steel/wood scrappers sand preparing and knotting including cost of all materials,labour and T&P etc. required for proper completion of the work.

25.2

-

43.7

... More
Mild Steel or iron work in heavy sizes such as trusses,built up gates,door frames record racks roof work,gates etc. wrought to required form including drilling holes rivetting or welding where necessary and also including supply of steel bolts nuts etc & their required for proper completion of the work. pwd 503

378

-

48.9

... More
Revolving Gate

-

-

-

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches including all T & p etc complete

2.88

-

114

... More
Cement concrete with 4 CM guage approved stone ballast approved coarse sand and cement in the proportion of 8:4:1 including supply of all material labour and tools and plants etc required for proper completion for the work.

0.43

-

5163

... More
R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in Foundation excluding supply of reinforcement and its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item.

0.55

-

7400.5

... More
R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in Column excluding supply of reinforcement and its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item.

0.28

-

9082

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work ( when not wrought to include in overall rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level.TMT FE 500(SI no. 504)

0.82

-

4574

... More
12mm thick plaster with cement mortar consisting of 1 part cement and 6 part of approved coarse sand minimum thickness not to be less than 10mm including supply of all material labour & T & P etc required for proper completion of work.

3.68

-

121.6

... More
Finishing walls with water-proofing on cement paint of approved make and quality on new work with two coat to give an even shade including supply of all material labour tools and plants etc required for proper completion of the work but for each coat of water proof cement paint after the first two coats eo give an even shade (PWD-660+661)

3.68

-

61.7

... More
Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes,fine steel/wood scrappers sand preparing and knotting including cost of all materials,labour and T&P etc. required for proper completion of the work.

8.4

-

43.7

... More
Mild Steel or iron work in heavy sizes such as trusses,built up gates,door frames record racks roof work,gates etc. wrought to required form including drilling holes rivetting or welding where necessary and also including supply of steel bolts nuts etc & their required for proper completion of the work. pwd 503

126

-

48.9

... More
G.S.T. Will be paid Extra as per GST Notification

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.