If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Projects Corporation Limited - UPPCL Tender
Building Construction
Eprocure
Opening Date30 Nov 2020
Closing Date10 Dec 2020
Tender AmountRefer Documents
Costs
EMD
₹ 1,70,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UPPRC_534159_1Bid Award Id
ViewTender No
18/GM-5/UPPCL/2020-21Tender Authority
Uttar Pradesh Projects Corporation Limited ViewPurchaser Address
-Website
http://http://upprojects.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size)
77.92
-
3895
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work.
58.95
-
950
Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete.
-
-
-
(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm
-
-
-
(4) Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution)
449.12
-
137.75
R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. including cost of binding wire. The rate excludes making of drip course which shall be paid extra.
-
-
-
Ground Floor
4.61
-
6438.54
First Floor
2.64
-
6502.92
Second Floor
2.69
-
6567.95
As in item no. 6 above but for slabs (Using 1:1.5:3 Mix concrete)
-
-
-
Ground Floor
63.94
-
6628.54
First Floor
64.07
-
6694.82
Second Floor
69.49
-
6761.22
As in item 6 but for the lighter beams i.e. having spans upto 6 m. (Using 1:1.5:3 Mix concrete)
-
-
-
Ground Floor
48.69
-
6818.54
First Floor
27.52
-
6886.73
Second Floor
28.72
-
6955.59
As in item 6 above but in R.C.C. Raft foundation and footing with approved stone ballast.(Using 1:1.5:3 Mix concrete)
92.05
-
6058.54
As in item 6 above but in R.C.C. columns in 1:1.5:3 having strength not less than M-20.
-
-
-
Ground Floor
17.3
-
6935
First Floor
13.74
-
7004.35
Second Floor
15.25
-
7074.39
M-150 brick work in 1:6 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work.
41.25
-
5082.5
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size)
62.83
-
330.5
Painting on D.P.C. with two coats of airblown bitumen 85/50 or 85/25 @ 1.7kg/sqm approx including cost of fuel if any.
62.83
-
104.5
Same as in item No. 11 above but in super-structure above plinth level up to floor two level ( up to two storeys ) including necessary cutting and moulding of brick work as required and also including honeycombed brick work in thickness of wall more than 12cms. (1:6 cement : coarse sand)
-
-
-
Ground Floor
102.82
-
5519.5
First Floor
98.28
-
5519.5
Second Floor
114.53
-
5574.7
P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level.
-
-
-
Ground Floor
268.85
-
5320
First Floor
145.16
-
5320
Second Floor
155.98
-
5373.2
GST Extra as per applicable
-
-
-