Uttar Pradesh Projects Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Projects Corporation Limited - UPPCL Tender

Works
Eprocure
Opening Date22 Feb 2021
Closing Date27 Feb 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & laying R.C.C. 1:1.5:3 in lighter beams complete in all respects. First Floor

16.24

-

8583

... More
Providing & laying R.C.C. 1:1.5:3 in Havier beams complete in all respects. First Floor\

3.62

-

8773

... More
Providing & laying R.C.C. 1:1.5:3 in slabs complete in all respects. Fist Floor

96.96

-

8360

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured. First floor

153.64

-

4574

... More
First Class brick work 1:6 cement mortor with cement & fine sand 1.25 FM in super - structure above plinth level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of 230 mm wall. First Floor

289.82

-

4602

... More
First Class brick work in 1:3 Cement and Coarse Sand mortar in superstructure for wall thickness 12 cms & below. Fist Floor

25.18

-

5462

... More
12 mm Cement plaster in single coat on smooth surface of single or half brick wall for interior plastering including brick wall for interior plastering including internal rounded angles chamfers, and/ or rounded angles not exceeding 80mm in girth and finished even and smooth No. extra for mixing any additive. (1) 1 Cement : 6 fine sand Ground Floor

2097.69

-

114

... More
TYPE-1 Building Works

-

-

-

... More
R.C.C. work with cement approved coarsesand and 2 cm. (3/4") guage approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc,required for proper completion of the works. Strength of the concrete shall not be less than

-

-

-

... More
Lintal (First Floor)

2.42

-

7514

... More
Sunshade (First Floor)

1.09

-

8360

... More
R. C. C. Work in lighter beams i.e. having spans upto 6 (First Floor)

0.51

-

8583

... More
R. C. C. Work in Slab (First Floor)

7.28

-

8360

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in anover all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. (First Floor)

11.74

-

4574

... More
Class 150 brick work in 1:6 cement and Fine sand of 1.25 modulus mortar in super structure including supply of all materials, labour and tools and plants etc. required for proper completion of the work. thickness of wall more than 23 cms. (First Floor)

38.92

-

4602

... More
Class 150 brick work in 1:3 cement and coarse sand mortar in superstructure for wall thickness 12 cms & below. (First Floor)

1.47

-

5462

... More
12mm Thick Plinth Plaster with 1 : 4 cement plaster below plinth

82.98

-

128

... More
15 mm Cement plaster in single coat on Rough side of single or half brick wall for outer plastering including brick wall for outer plastering including internal rounded angles chamfers, and/ or rounded angles not exceeding 80mm in girth and finished even and smooth. No extra for mixing any additive. (1)1 cement : 6 Fine sand (Ground Floor)

124.36

-

114

... More
15 mm cement plaster in single coat on Rough side of single or half brick wall for interior plastering upto floor two level including brick wall for interior plastering including internal rounded angles chamfers, and/ or rounded angles not exceeding 80 mm in girth and finished even and smooth No. extra for mixing. (1)1 cement : 6 Fine sand

-

-

-

... More
Ground Floor

231.6

-

127

... More
First Floor

231.6

-

127

... More
G.S.T. will be paid extra as per applicable against G.S.T. notification.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.