Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date18 Mar 2024
Closing DateCancelled
Tender Amount₹ 1,10,000
Costs
EMD
₹ 2,000Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Work Of Replacement Of 10 Mvar Capacitor Bank
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_919077_1Tender No
13/ETDD/2023-24Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
33 KV 10 MVAR capacitor bank unit
2
-
-
... More
Safe loading of Dismantlled 33Kv Capacitor bank material at 400KV S/S sec- 148 Noida and safely unloading at 220Kv S/S Nehtaur with the help of hydraulic crane and skilled labour as per direction of engineer in charge.
1
-
-
... More
Safe Carriage of loaded 33 KV Capacitor bank unit with all accessorise from 400KV S/S sec- 148 Noida to 220 KV Nehtaur with the help of private vehicle (approx distance - 200 km)
1
-
-
... More
Erection of Following equipment and auxiliary structure as per instruction of manual of various equipment and technical specifications including shifting of material/equipment from store to erection site including all other associated work to complete the job satisfactorily as per direction of supervising engineer.
-
-
-
... More
33 KV NCT
2
-
-
... More
33 KV Series reactor
4
-
-
... More
Erection of capacitor bank unit (1x10 MVAR) by erection of its structure with the help of post insulator, nut, bolt and then fixing of cells properly and jumpering between each cells and other associated work to complete the job satisfactorily as per direction of supervising engineer.
1
-
-
... More
Inter connection and jumpering work of equipment with 33 KV bus.
1
-
-
... More
Laying of 2C x 2.5 Sq mm. control cable in the cable trench from control relay panel to various equipments/marshalling boxes and JB etc. In switchyard as per cable schedule.
300
-
-
... More
Termination of cables as per cable schedule including making necessary holes in glands plates or box where ever required supply and fixing of cable glands of appropriate size, supply & providing ferrules & Nos for each core of cable and its termination with crimping type lugs of dowell/tension make and all other associated work to complete the job satisfactory.
35
-
-
... More
Earthing of NCT, Reactor, Capacitor bank unit by 50x6 Ms Flat by cutting, bending, laying. Work also include excavation, back filling, painting of MS flat with one coat of red oxide and two coat of green synthetic enameled paint first grade. MS flat shall be provided by the department free of cost.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements