Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Civil And Construction
Eprocure
Opening Date19 Oct 2024
Closing Soon25 Nov 2024
Tender Amount₹ 18,61,216.13 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement, Concrete with 40 mm First class brick work in 1:4 cement, coarse sand of mortar in foundation and in plinth as per drawing including the supply of material labour & T&P etc. required for completion of work satisfactory with brickwork 1:4 (including cost of cement) with all cost of labour and T&P etc. required for completion of the work satisfactory.

93.76

3905

366132.8

... More
Cement, Concrete with 40mm brick/stone ballast coarse sand and cement in ratio of 1:2:4 on the top of plantform on the foundation including material, labour & T&P etc. required for completion of work satisfactory as per tech. specn. & drawing (including cost of cement) with all cost of labour and T&P etc. required for completion of the work satisfactory.

2.29

3800

8702

... More
12mm thick plaster work with mortar in ratio 1:4 cement & coarse sand including cost of all material labour & T&P etc. required for completion of work satisfactory as per tech. specn. (including cost of cement) with all cost oflabour and T&P etc. required for comletion of the work satsifactory.

233.18

590

137576.2

... More
Earth filling under floor and in area for the revetment for the tower including the cost of earth to be obtained from outside including watering ramming in 200 mm layers and dressing of earth etc.complete including the cost of earth royalty, taxes etc with all cost of labour and T&P etc. required for comletion of the work satsifactory.

160

141

22560

... More
First class brick soling work in flooring including laying of brick on 75mm edge and filling of Ganga sand in between the route including the preparation of base with all cost of labour and T&P etc. required for competion of the work satisfactory.

64

550

35200

... More
REVETMENT OF TOWER NO. 35A

-

-

-

... More
Excavation of foundation in including lift upto 2.3 mtr. Filling watering & rammaning excacated earth in the trench up to the space of building and the side of the foundation as per techanical specification and drawing with all cost of labour and T&P etc. required for complition of the work satisfactory.

205

141

28905

... More
Cement, Concrete with 40 mm brick/stone ballast coarse sand and cement in ratio of 1:4:8 in foundation under floor (in the size of 1.8m wide and 0.2 mtr. Thick including of supply of all material/ labour & tools etc. required for completion of work satisfactory with all cost of labour and T&P etc. required for completion of the work satisfactory.

22.36

3551

79400.36

... More
Cement, Concrete with 40 mm First class brick work in 1:4 cement, coarse sand of mortar in foundation and in plinth as per drawing including the supply of material labour & T&P etc. required for completion of work satisfactory with brickwork 1:4 (including cost of cement) with all cost of labour and T&P etc. required for completion of the work satisfactory.

193.17

3905

754328.85

... More
Cement, Concrete with 40mm brick/stone ballast coarse sand and cement in ratio of 1:2:4 on the top of plantform on the foundation including material, labour & T&P etc. required for completion of work satisfactory as per tech. specn. & drawing (including cost of cement) with all cost of labour and T&P etc. required for completion of the work satisfactory.

3.72

3800

14136

... More
12mm thick plaster work with mortar in ratio 1:4 cement & coarse sand including cost of all material labour & T&P etc. required for completion of work satisfactory as per tech. specn. (including cost of cement) with all cost oflabour and T&P etc. required for comletion of the work satsifactory.

381.88

590

225309.2

... More
Earth filling under floor and in area for the revetment for the tower including the cost of earth to be obtained from outside including watering ramming in 200 mm layers and dressing of earth etc.complete including the cost of earth royalty, taxes etc with all cost of labour and T&P etc. required for comletion of the work satsifactory.

363.68

141

51278.88

... More
First class brick soling work in flooring including laying of brick on 75mm edge and filling of Ganga sand in between the route including the preparation of base with all cost of labour and T&P etc. required for competion of the work satisfactory.

132.25

550

72737.5

... More
Note-

-

-

-

... More
1.GST shall be paid at the rate applicable at the time of invoice.

-

-

-

... More
2.Bidders have to submit their % Rates above or below the Estimated Rates (Excluding "%" symbol in "Blue Box" only).

-

-

-

... More
3.Bidders will submit their Rates by putting "X" for "X"% of Higher than Estimated Rates (ie.will put simply 1 for quoting 1.0% higher than Estimated Rates)

-

-

-

... More
4.Bidders will submit their Rates by putting "-X" for "-X"% of Lower than Estimated Rates (ie.will put simply -1 for quoting 1.0% lower than Estimated Rates)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.