If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Eprocure
Opening Date19 Oct 2024
Closing Date18 Nov 2024
Tender Amount₹ 5,19,400 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 6,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_966956_1Bid Award Id
ViewTender No
ETC-29/2024-25Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Inspection and rectification Siemens make Substation Automation System, installed at 132 KV S/S Aligarh-(V)
-
-
-
The Following work are including of BCU,s relays configuration and its ICD files for healthy communications with SCADA, restoring the rectified backup files of SCADA, checking the data healthiness at local SCADA, Replacing the defective FO multimode patch cord, Checking & Rectifying the healthiness of LIUs and it communication ports, Checking the healthiness of IEC 61850-7 Ethernet switches, Replacing the defective if any CAT-5/LAN cables and checking its healthiness Re-installation aof old backup to SCADA if required, Checking the healthiness of all protection relay’s communication to SCADA, Checking of all required events, alarm, numerical data’s status and signals to SCADA from various bays & feeders Checking the SLD of S/S to SCADA screen checking the all required operations of equipment from SCADA if required. At the time of rectification all required material and computer parts will be arranged by department without extra charges, except the following given material will be arranged by department without extra charges, except the following given material will be provided by contractor, Scada license key, activation key, old SAS backup, and software CD will be provided by department. Note :- After the completion of above work contractor has to submit the restored files and backup to the department represenentative via CD/Hard Drive.
1
155000
155000
Supply & fixing of Fibre optical Multimode patch cards for ST-ST, LC-LC, ST-LC, ports (As per requirement at site, having length of 05 mtr each)
6
2400
14400
Note-
-
-
-
1.GST shall be paid at the rate applicable at the time of invoice.
-
-
-
2.Bidders have to submit their % Rates above or below the Estimated Rates (Excluding "%" symbol in "Blue Box" only).
-
-
-
3.Bidders will submit their Rates by putting "X" for "X"% of Higher than Estimated Rates (ie.will put simply 1 for quoting 1.0% higher than Estimated Rates)
-
-
-
4.Bidders will submit their Rates by putting "-X" for "-X"% of Lower than Estimated Rates (ie.will put simply -1 for quoting 1.0% lower than Estimated Rates)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements