Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Civil Works Others
Eprocure
Opening Date2 Aug 2019
Closing Date19 Aug 2019
Tender Amount₹ 14,33,960 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cutting or filling undulated land for proper leveling and dressing the area including cutting and filling the earth upto 100mm depth if required and as per direction of E/I, complete with all material, labour and TandP etc. required for proper completion of work.

300

-

7

... More
Local Fine sand of 1.25 F.M. filling in plinth including supply of necessary quantity of sand from a river/canal nearest to the site of work including watering, ramming and dressing etc. Rate to include cost of all materials, labour and TandP etc. required for proper completion of work.

5.5

-

1430

... More
Clearing Jungle including uprooting of rank vegetations, grass, bush wood, trees and saplings of girth upto 20 cm measured at a height of one meter above ground level and removal of rubbish upto a distance of 50 meters outside the periphery of area cleared.

500

-

7

... More
Earth filling in Bulk in open areas including cost of the earth when obtained from outside Corporation's area including its carriage, loading/unloading, spreading, watering and ramming in 20 cm layers and dressing of earth etc. Rates including cost of earth, labour, TandP and ROYALITY of earth etc. required for proper completion of the work.

65

-

390

... More
Concrete with 4cm gauge down graded Stone ballast , coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundation and under floors and supply of all materials, labour, tools and plants etc. required for proper completion of the work.

9

-

5200

... More
Cement concrete with 2cm gauge Stone ballast, coarse sand and cement in the proportion 4:2:1 including supply of all materials, labour and TandP etc. required for proper completion of work.

5

-

6800

... More
Precast cement concrete door sills, Chaukhats, boundary posts, shelves and similar small work with cement, approved coarse sand and 20mm gauge down graded stone ballast in proportion of1:1.5:3. excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. binding wire including the cost of binding wire, moulds and all other materials, labour and TandP etc. required for proper completion of the work.

1

-

8930

... More
RCC work with cement, approved coarse sand and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3. For raft excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and TandP etc.

15

-

7750

... More
RCC work with cement, approved coarse sand and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3. in T-beam, columns and walls upto 1.50mt. Ht. (Only web of T or L beam shall be measured.) excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and TandP etc.

10

-

12010

... More
Concreting of 40 mm thick R.C.C. trench cover of mild steel frame work with CC 1:1.5:3 in cement coarse sand, 12 mm down graded stone ballast with smooth finishing on both top and bottom surfaces matching with floor colour complete with all labour, materials, TandP etc. required for proper completion of the work but excluding cost of cover of steel frame.

25

-

450

... More
Placing of trench cover of all size in proper position including transporting from different places within the s/s area including all labour TandP etc. required for proper completion of the work as per direction of Engineer-in charge.

60

-

6

... More
Providing cement concrete with cement, approved coarse sand (F.M. 1.5 to 2.5) and 12 mm gauge down graded approved stone ballast in the proportion of 1:1.5:3 in the grouting of Edge and brackets of trenches including necessary centering and shuttering etc. including supply of all materials, labour and TandP etc. required for proper completion of work.

2

-

8980

... More
Placing and fixing of precast items such as shelves, blocks etc. in line and level as per direction of E/I, including cost of labour and TandP etc. required for proper completion of work.

10

-

138

... More
1st class brick work in 1:4 cement and coarse sand of 2.25 F.M. mortar in foundation and plinth including supply of all material, labour and TandP etc. required for proper completion of work.

15

-

4930

... More
1st class brick work in 1:4 cement and coarse sand of 2.25 F.M. mortar in superstructure for wall of one brick (230 MM) including supply of all material, labour and T&P etc. required for proper completion of work.

2

-

5416

... More
Mild steel or iron work in heavy small section like (J/U) hooks, holding down bolts, hold fast, tie rod, record recks, door/window frame, trench recks and edges, angle post etc. (when not included in overall rates) wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work.

1.2

-

69440

... More
Mild steel or iron work in heavy large size sections such as trusses, built-up gates, roof work, window/boundry grill or railing, trench covers, grating, T/F rail etc. wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work.

1.5

-

72870

... More
Mild steel or iron work in heavy large size sections such as trusses, built-up gates, roof work, window/boundry grill or railing, trench covers, grating, T/F rail etc. wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work. (in case the steel supplied by department free of cost.)

0.5

-

35250

... More
As above item in 9.02 but for using steel like hollow pipes railing, chequered/plain sheets and cast iron articles, pile liner, well curb etc. wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work.

0.1

-

84070

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks, and authorized overlapping as required for proper completion of the work.

2

-

69410

... More
Supply of 28 mm dia M.S. Anchor bolts (conforming to IS 266) 900 mm. Long with base plate (75x75x6mm) welded with anchor bolts inclduing its threading upto a length of 10cm and galvnized coating up to a depth of 150mm also supply of a pair of standard nuts with therading including supply of 5mm thick washer and cost of labour material and TandP etc. required for proper completion of the work.

56

-

710

... More
Fixing and grouting the Anchor bolts 28mm dia to 32mm dia in proper alignment level and setout with the help of a template complete including supply of all labour and TandP etc. requiired for proper completion of the work.

56

-

105

... More
Supply of 25 mm dia. M.S Anchor bolts (conforming to IS-266) 500 mm long with base plate (50x50x6 mm) welded with anchor bolts, including its threadng up to a length of 10 cm and galvnized coating up to a depth of 150mm and also supply of a pair of standard nuts with theading including supply of 5mm thick washer and cost of labour material and TandP etc. required for proper completion of the work.

156

-

380

... More
Fixing and grouting the 25mm dia and below size Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour TandP etc. reqd. for proper completion of the work.

156

-

85

... More
Placing of template in position, level and alignment for grouting of Anchor bolt in main gantry (Labour only)

4

-

175

... More
Placing of template in position, level and alignment for grouting of Anchor bolt in Auxillary Structures (Labour only)

28

-

60

... More
Fixing and grouting of trench edging and rack in proper level and alignment including cost of all labour and TandP etc required for proper completion of the work but excluding cost of C.C.

80

-

14

... More
Supply & Fixing high tensile steel colour coated Anti rust, high temp resistant sheet with tensile strength 550 PMA hot dip metallic (Zinc Aluminum) alloy (Nn-55%) Al, (45%) coating 70 GSM with total thickness not less than 0.45 mm (TCT) durashine or equivalent make with necessary over laps incl. S/F galvanized J/V hook with bolts, nuts, washer and bitumen washers etc. including cost of material, labour T&P etc. required for proper completion of work as per direction of E/I confirming I.S. 1397 : 1993

5

-

757

... More
12mm thick plaster with cement mortar of 1 part cement and 4 parts of approved coarse sand 2.5 F.M. over Brick work, min. thickness not less than 10mm including supply all material, labour and TandP required for proper completion of work.

150

-

176

... More
Champhering the edge of concrete 35mm wide triangular section at the junction of concrete foundations and trench edging etc.as per direction of E/I, inclduing cost of all material labour and TandP etc. required for proper completion of the work.

200

-

21

... More
Rendering, smoothening and proper finishing with cement mortar/slurry (mortar 1:2 cement and coarse sand) in horizontal and vertical surface of foundations/roof etc. as per direction of E/I inclduing supply of all material labour and T and P etc. required for proper completion of wrok.

75

-

160

... More
3 mm thick neat cement floating coat inclduing cost of all material labour and TandP etc. required for proper completion of the work.

60

-

25

... More
40 mm thick 1:2:4 cement concrete floor with cement, approved coarse sand and 20mm graded stone aggregate laid in panels finished with 3mm floating coat of neat cement, over base concrete. Rate includes cost of all materials, labour and TandP required for proper completion of work but excluding cost of base concrete.

60

-

380

... More
S/F 6 or 8 mm thick glazed/matt finish tiles SOMANI or equivalent approved quality and size upto 400x400 in floor, skirting or dado laid with 1:3 cement and coarse sand mortar and joints finished with white cement including polishing etc. complete including supply of all materials, labour and T&P etc. required for proper completion of work.

8

-

992

... More
S/F 10 mm thick glazed / matt finish antiskid, scretchfree, jointfree hard Industrial / Acid Proof floor tiles like group 25 (SOMANY) or equivalent make of size 300 x 300 mm or more of approved shade, colour or pattern in floor, skirting or in dado laid with 1:3 cement and coarse sand mortar and joints finished with white cement slurry and polishing complete including supply of all materials, labour and T&P etc. required for proper completion of work.

8

-

1493

... More
S/F 10mm thick glazed / matt finish Fully Vitrified tiles of size 600 x 600 mm or more of approved company like RAK, JOHNSON, SOMANY or equivalent make of approved shade, colour and pattern as directed by E/I in floor, skirting or dado laid with 1:3 cement and coarse sand mortar, finished with white cement and pigment to match the tiles shade etc.complete including supply of all materials, labour and T&P etc. required for proper completion of work.

10

-

1875

... More
Providing and fixing 15 mm or more thick polished GRANITE stone BLACK/GREEN or other approved shade and pattern in floor or in column etc. laid with 1:3 cement and coarse sand mortar, jointing with white cement & pigment slurry to match the shade of stone including supply of all materials, labour and T&P etc. required for proper completion of work.

5

-

3800

... More
Painting or varnishing on iron works in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mixed paint or clear synthetic varnish including supply of all materials, labour and TandP etc. required for proper completion of the work. Paint to be used should confirm to the ISI no. 103-1950.

60

-

62

... More
Painting or varnishing on iron works in small areas or wood work with every coat after Ist coat of approved superior quality ready mixed paint or clear synthetic varnish including supply of all materials, labour and TandP etc. required for proper completion of the work. Paint to be used should confirm to the ISI no. 103-1950.

40

-

32

... More
Painting or varnishing on iron works in small areas or wood work with every coat on previously painted old wood or steel work of approved superior quality ready mixed paint or clear synthetic varnish including supply of all materials, labour and TandP etc. required for proper completion of the work. Paint to be used should confirm to the ISI no. 103-1950.

20

-

44

... More
Applying BIRLA PUTTY or equivalent putty on OLD interior or exterior surface after cleaning the old painted surface as per requirement and direction of E/I, including cost of all material, labour and T&P required for proper completion of work.

80

-

55

... More
Finishing walls with water proof exterior emulsion paint of APEX ULTIMA (ASIAN)/Weather Shield Max (ICI) or equivalent brand on for every additional coat to give an even shade including thorough washing with water as per direction E/I including cost of all material labour & T&P required for proper completion of work.

40

-

55

... More
Finishing walls with water proof exterior emulsion paint of APEX ULTIMA (ASIAN)/Weather Shield Max (ICI) or equivalent brand each coat of water proof exterior emulsion of approved brand on old surface including cleaning at Apex/Weather shield Max emulsion paint to give an even shade including thorough washing with water as per direction E/I including cost of all material labour & T&P required for proper completion of work.

40

-

75

... More
One coat synthetic / acrylic distemper on every coat after the first coat of all materials, labour and T&P etc. required for proper completion of the work.

40

-

26

... More
One priming coat & one coat synthetic / acrylic distemper on every coat on previously old distempered surface work including supply of all materials, labour and T&P etc. required for proper completion of the work.

40

-

33

... More
Dismantling plastered or unplastered brick work or stone masonry work in lime or cement mortar and inclduing stacking of materials as directed by Engineer-in-charge within a distance of 60 meters.

1

-

420

... More
Dismantling reinforced cement concrete or reinforced brick work or Cement Concrete including stacking of dismantled material as directed by the Engineer-in-charge within a distance of 60 metres.

1

-

938

... More
Dismantling cement concrete or brick or granolithic floor, inclduing base concrete as and where required including stacking of dismantled material as directed by Engineer-in-charge within a distance of 60 meters.

1

-

48

... More
Dismantling existing plaster including disposal of refuse as directed by the Enginer-in-charge within a distance of 60 metres.

10

-

34

... More
Dismantling of existing pale/security chain link fencing including posts and stacking properly as per direction of E/I including all labour and TandP etc. required for proper completion of work.

5

-

72

... More
Cutting and chipping of R.C.C. work in small works and at senstive places and highly alert zones smoothly and gently with pneumatic drilling with sharp chiesel/bit of required size or mannualy and also cutting of reinforcement bars by gas cutter as per direction of E/I including disposal of refuse outside the periphery of corporation area inclduing cost of all labour, TandP, gas, plant etc. required for proper completion of work.

1

-

2412

... More
Preparation of sub grade / sub base in proper shape and camber in required width by rolling with road roller in layer of 20 cm. and compaction the same to the optimum moisture content complete for laying brick soling including cost of labour and TandP etc. required for proper completion of work but excluding cost of earth work which shall be paid separately.

25

-

58

... More
Brick soling with first class bricks laid on edge and dry including preparation of sub grade to prescribed camber and including supply of birck filling joints with fine sand by spreading and blinding over entire surface of brick soling as per direction of E/I including cost of material, labour and TandP etc. required for proper completion of work.

25

-

526

... More
Laying cement concrete road slab 10 cm or more thick consisting of 1 part cement 1.5 part approved coarse sand and 3 part approved 20 mm down graded stone aggregate over prepared sub grade after its rectification and bringing it to proper camber and shape and making good to the satisfaction of E/I including cost of all materials, labour and TandP etc. required for proper completion of the work. [8810 + (7120 - 6800)] = 9130.00

5

-

9130

... More
Providing and laying non-pressure NP3 class RCC pipes with collars with stiff mixture of cement mortar in the proportion 1:2 (1-Cement, 2-Coarse sand) including testing of joints including cost of all material, labour, TandP etc. required for proper completion of the work. a- 150 mm dia RCC pipe

20

-

670

... More
Finishing the surface of road slab with the help of power trowel after dewatering of road slab and finishing with pre blended cementations floor hardener (Product Dr. Fixit Piditop 333) as per the specification provided by the department before executing of work incl. all labour material TandP etc. as per direction of E/I but excluding the cost of concrete and reinforcement.

25

-

250

... More
Cutting of Road Slab 6 mm wide and 40 mm deep with special cutting tool including cleaning and filling joint with 85/25 grade bitumen after heating bitumen at required temp. including cost of all labour , TandP etc. required for proper completion of work.

20

-

70

... More
Providing and Laying 80 mm thick factory made Interlocking CC tile M-25 grade over prepared subgrade with 50 mm thick fine sand layer making joints filled properly and finished in proper level and alignment including cost of all material, labour and TandP required for proper completion of work as per direction of E/I.

50

-

890

... More
Providing and fixing 110 mm dia PVC Pipe of 6Kg. Per sq.cm.pressure wit specials for rain water in Buildings as per dir. Of E/I complete.

5

-

293

... More
Supply and fixing of welded mesh of approved quality and size as approved by E/I, over M.S.Angle frame with M.S. flat, nuts and bolts or welding as required , Rate including cost of all material, labour and TandP etc. required for proper completion of work. (Excluding cost of M.S.Angle frame with M.S. flat)

140

-

107

... More
Dismentalling and resoling brick on edge / intrlocking tile floor with existing old bricks/tile laid dry joints filled with sand including preparation of base to proper slope and camber, its ramming including supply of labour, T&P etc. (Labour only)

20

-

138

... More
Boring hole 3.5 m. deep below the cut-off level in sandy or clayey soil including clearing of the bore upto cutoff level, all loose materials and disposing the excavated earth as directed including cost of all materials, labour and T&P etc. as may be required for proper completion of the work. (a) For 300 mm dia. Piles

8

-

878

... More
Cutting the bore hole for providing under ream of 2.5 times the dia of pile up to 3.5 metre. below the cut off level including cost of all material, labour and T&P etc. as may be required for proper completion of the work. (a) For 300 mm dia. Piles

8

-

502

... More
Extra for every additional metres boring work as described in item no. 20.01 above but beyond 3.50 metre below the cut off level. (a) For 300 mm dia. Piles

20

-

500

... More
As in item no.20.02 above but for under ream beyond 3.50 metre the cut off level. (a) For 300 mm dia. Piles

8

-

638

... More
Providing and filling bentonite solution in pile bore under unstable and or high water table soil condition for retaining shape of bore, 5 kg. of bentonite will be used in 100 litres clear water (Bentonite solution shall be used with continuous process of circulation) including all materials, labour and T&P etc. the measurement shall be done as per design dia and depth of pile upto cut off level.

1

-

1203

... More
Supply and fabrication of M.S. Tor reinforcement cages for piles including cutting, bending, welding if required as per design and placing of the cage in the pile bore including cost of all materials, labour and T&P etc. as may be required for proper completion of the work including all incidental wastage.

0.75

-

69410

... More
Cutting and chipping the piles top above the cut off level including bending and straightening the pile reinforcement as directed including cost of all material, labour and T&P etc. as may be required for proper completion of the work. (a) For 300mm dia piles

8

-

277.5

... More
R.C.C. work with cement, approved coarse sand, and 2 cm. Gauge approved stone ballast in 1:1.5:3. proportion for concreting in pile including cost of all materials, labour and T&P etc. required for proper completion of the work. Measurements of work will be done according to design diameter and depth of the pile up to cut off level under reamed concrete shall be measured as per IS 2911 part 2.

1.5

-

7525

... More
R.C.C. work with cement, approved coarse sand, and 2 cm. Gauge approved stone ballast in 1:1.5:3. proportion for concreting in pile cap including cost of all materials, labour and T&P etc. required for proper completion of the work. Measurements of work will be done according to design diameter and depth of the pile up to cut off level under reamed concrete shall be measured as per IS 2911 part 2.

0.5

-

7857

... More
R.C.C. work with cement, approved coarse sand, and 2 cm. Gauge approved stone ballast in 1:1.5:3. proportion for concreting (bore under loose unstable/under water) by displacement method using trimming pipe and excluding cost of 10% extra cement as required for the normal 1:1.5:3 mix including cost of all materials, labour and T&P etc. required for proper completion of the work. Measurements of work will be done according to design diameter and depth of the pile up to cut off level under reamed concrete shall be measured as per IS 2911 part 2.

2

-

8052

... More
Brick work with old or dismantled bricks in 1:6 cement and coarse sand mortar in (230mm) thick wall in foundation and other place including cost of all materials, labour and TandP etc. required for proper completion of work.

2

-

2350

... More
Disposal of rubbish/debris outside the corporation area as per direction of Engineer in-charge including cartage labour and T&P etc. required for proper completion of the work.

50

-

200

... More
Providing and fixing 50mm Dia union including supply of all materials, labour and T&P etc. required for proper completion of the work.

2

-

506

... More
Providing and fixing 25mm Dia union including supply of all materials, labour and T&P etc. required for proper completion of the work.

2

-

228.8

... More
Providing and fixing 15mm Dia union including supply of all materials, labour and T&P etc. required for proper completion of the work.

2

-

103.4

... More
Providing and fixing 15mm dia B-class (T.T./ Swastik make) ISI marked G.I. Pipe complete with G.I. specials as bends, tee, socket cross, clamps, etc. Earth work including filling the trenches etc. required for proper completion of the work. The rate also includes concealed G.I. fitting where required, cutting and making good the walls etc. including cost of all materials, labour TandP etc complete (External work).

20

-

172

... More
Providing and fixing 20mm dia B-class (T.T./ Swastik make) ISI marked G.I. Pipe complete with G.I. specials as bends, tee, socket cross, clamps, etc. Earth work including filling the trenches etc. required for proper completion of the work. The rate also includes concealed G.I. fitting where required, cutting and making good the walls etc. including cost of all materials, labour TandP etc complete

5

-

204

... More
Providing and fixing 25mm dia B-class (T.T./ Swastik make) ISI marked G.I. Pipe complete with G.I. specials as bends, tee, socket cross, clamps, etc. Earth work including filling the trenches etc. required for proper completion of the work. The rate also includes concealed G.I. fitting where required, cutting and making good the walls etc. including cost of all materials, labour T and P etc complete

10

-

284

... More
Providing and fixing 50mm dia B-class (T.T./ Swastik make) ISI marked G.I. Pipe complete with G.I. specials as bends, tee, socket cross, clamps, etc. Earth work including filling the trenches etc. required for proper completion of the work. The rate also includes concealed G.I. fitting where required, cutting and making good the walls etc. including cost of all materials, labour T and P etc complete

10

-

541

... More
Providing and fixing 65mm dia B-class (T.T./ Swastik make) ISI marked G.I. Pipe complete with G.I. specials as bends, tee, socket cross, clamps, etc. Earth work including filling the trenches etc. required for proper completion of the work. The rate also includes concealed G.I. fitting where required, cutting and making good the walls etc. including cost of all materials, labour TandP etc complete

10

-

682

... More
Providing and fixing 80mm dia B-class (T.T./ Swastik make) ISI marked G.I. Pipe complete with G.I. specials as bends, tee, socket cross, clamps, etc. Earth work including filling the trenches etc. required for proper completion of the work. The rate also includes concealed G.I. fitting where required, cutting and making good the walls etc. including cost of all materials, labour TandP etc complete.

10

-

844

... More
Providing and fixing full way Brass G.M. gate valve 25mm dia with wheel valve ISI marked heavy quality including supply of all materials, labour and TandP etc. required for proper completion of the work.

2

-

1148

... More
Providing and fixing full way Brass G.M. gate valve 50mm dia with wheel valve ISI marked heavy quality including supply of all materials, labour and TandP etc. required for proper completion of the work.

2

-

3479

... More
Providing and fixing full way Brass G.M. gate valve 15mm dia with wheel valve ISI marked heavy quality including supply of all materials, labour and TandP etc. required for proper completion of the work.

2

-

633



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.