Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Eprocure
Opening Date14 Aug 2019
Closing Date9 Sep 2019
Tender Amount₹ 7,69,556
Costs
EMD
₹ 16,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UPCTL_372617_1Bid Award Id
ViewTender No
Tender Notice 02(05)/ECTC/GKP/2019-20Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Concrete with 4cm gauge I class brick ballast (class 150) , coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundations and under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No.5.01 )
8
-
5630
Concreting of 40 mm thick RCC trench covers in mild steel frame work with RCC 1:1.5:3 in Cement,Chopan coarse sand (F.M. 1.8 to 2.5) and 2cm gauge graded hard stone ballast with 3mm thick floating coat of neat cement finish on top of cover complete with all labour, materials and placing the same in proper position at required location of cable trench within the substation area. (CSI No. 5.18)
2
-
409
Cement concrete with 2cm gauge approved hard stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 1:1.5:3. including supply of all materials, labour,side shuttering if required and T&P etc. required for proper completion of work (CSI No. 5.21)
4.5
-
9043
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries and approved coarse sand in proportion 1:1.5:3 in raft foundation and footings , excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27)
2
-
9985
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries and approved coarse sand in proportion 1:1.5:3 in RCC pile caping, gantry walls/column foundation and RCC pedestals, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire and including cost of all materials, binding wire, labour and T&P. etc. required for proper completion of the work. (CSI No. 5.28)
7
-
10306
First class brick (class-150) work in 1:4 cement and coarse sand (F.M.1.8 to 2.5)mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work (CSI No. 6.03)
18
-
5897
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor.(CSI No. 9.01)
0.5
-
76551
TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor)(CSI No. 9.03)
1.2
-
67942
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14)
76
-
293
Fixing and grouting 25 mm dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15)
76
-
43
Providing M.S. Frames work, rack etc for R.C.C. Trench covers and edging with M.S. angles and M.S reinforcement including cutting, bending and welding as per approved drawing. The rate is including cost of all labour, materials etc. as required for proper completion of the work. (CSI No. 9.20)
0.75
-
72568
Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (CSI No. 9.30)
125
-
12
Fixing of template in position level and alignment for grouting of Anchor bolt in auxiliary structure (labour rate only). (CSI No. 9.32)
125
-
144
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (CSI No. 9.33)
125
-
9
12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07)
150
-
214
6 mm. thick plaster with 1:3 cement & coarse sand including labour, materials & T&P etc. required for proper completion of the work. (CSI No. 11.17)
150
-
174
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)
325
-
8
3 mm thick floating coat of neat cement finish including supply of all materials,labour and T&P etc. required for proper completion of the work.(cement consumtion 0.044 bag/Sq.m.) (CSI No. 11.20)
161
-
18
2.5 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work.without base PCC (CSI No. 12.02)
24
-
310
Straight over burnt bricks on edge floor laid dry, joints sand filled, including preparation of base to proper slope and its ramming including supply of all material labour & T&P etc. required for proper completion of the work. (CSI No. 12.09)
50
-
520
Painting or varnishing new iron work in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mix paint "Luxol" or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01)
47
-
70
As in item 13.01 above but for every coat after first coat. (CSI No. 13.02)
47
-
33
Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position (CSI No. 13.28)
80
-
12
Laying cement concrete road slab consisting of 1 part cement 1.5 part approved coarse sand and 3 part approved 20mm down graded stone aggregate over prepared sub grade after its rectification and bringing it to proper camber and shape and making good to the satisfaction of E/I inclduing cost of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.13)
12
-
9450
Filling of 20 mm. wide 100/150 mm. deep joint with coarse sand and saw dust mixed with hot bitumen etc. complete including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.14)
40
-
45
Placing of trench cover of all size in proper position including transportation from different places within the S/S area including all labour, T&P etc. required for proper completion of the work as per direction of Engineer - in - charge. (CSI No. 20.11)
80
-
9
CONTRACTORS OFFER
-
-
-
Coloured cell is compulsory to be filled by the Contractor
-
-
-
Departmental estimated amount for above work (exclusive of GST) as per B.O.Q.
-
-
-
Our rates are at :-
-
-
-
Total Cost of Civil Works:-
-
-
-
Total cost of civil works in Indian Rupees in Words :-
-
-
-
If any problem TENDERERS QUOTES HIS RATES MANUALLY HERE :-
-
-
-
Please struck out two words “above / at par / below” which are not applicable for your offer, failing which the tender shall be summarily rejected
-
-
-
Tenderers are required to quote their offer “above / at par / below” the estimated cost, in case, any tenderer quoted rates against any individual items, then the offer shall not be entertained.
-
-
-
The offer rates shall remain firm (not variable) for entire execution period.
-
-
-
Departmental rates are exclusive of GST. Rates quoted by firm shall exclude GST which will be borne by department as per applicable rules.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements