Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Civil And Construction
Eprocure
Opening Date16 Jul 2019
Closing Date24 Jul 2019
Tender Amount₹ 29,03,464 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 30,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UPTCL_364086_1Bid Award Id
ViewTender No
Short Term E-Tender no. 50/2019-20/ETC/VNSTender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cost of concreting for CC Pad in bed of tower including cost of cement, shuttering, forming etc. including cost of reinforcement bar binding with 1:2:4 concrete.
27.23
-
-
... More
Cost of concreting for Column (One on every corner of wall and one Middle of wall) including cost of cement, shuttering ,forming etc. including cost of reinforcement bar binding with 1:2:4 concrete.
5.67
-
-
... More
Cost of concreting for CC Pad in middle of wall including cost of cement ,shuttering ,forming etc. including cost of reinforcement bar binding with 1:2:4 concrete.
11.04
-
-
... More
Concrete with 40mm alone ballast ,coarse sand and cement mortar in ratio 1:4:8 in foundation under floor including the cost of all material labour and T&P etc. required for proper completion of work satisfactorily.
7.4
-
-
... More
Cost of concreting for CC top cover on retaining wall of tower including cost of cement etc. with 1:2:4 concrete.
19.3
-
-
... More
Installation of steel reinforcement bars in R.C.C foundation of CC Pad/Piling/Piller/CC Middle Pad, including cost of steel cutting, placing etc.
4.22
-
-
... More
1st class brick work for the construction of retaining wall in 1:4 ratio cement, mortar in ratio 1:2:4 including the cost of all material, labour and T&P etc. required for proper completion of work satisfactorily.
352.35
-
-
... More
Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to obtained by the contractor from outside including watering ,ramming and dressing of earth etc. complete including the cost of earth , royalty, taxes etc. and cost of material ,labour and T&P required for proper completion of work satisfactorily.
326.87
-
-
... More
12mm plaster work on the wall cement and sand in ratio 1:4 including the cost of material, labour and T&P etc .required for proper completion of work satisfactorily
378.23
-
-
... More
1st class brick on the edge floor laid including preparation of base to proper slope including supply of all material, labour and T&P etc. required for proper completion of work satisfactorily.
163.03
-
-
... More
Making weep holes providing plastic pipe of length 30mtr(cost including the cost of plastic pipe including cutting in accordance size and fitting them in two layers at the span of 2.0mtr at depth of 0.5mtr, 1.25mtr and 2.0mtr respectively from the top of the revetment wall)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements