Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Eprocure
Opening Date27 Mar 2024
Closing Date9 Apr 2024
Tender Amount₹ 10,20,000
Costs
EMD
₹ 11,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_920464_1Bid Award Id
ViewTender No
162-ETC-I(A)/ 2023-2024Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Replacement of Damaged Gasket of 100 MVA T/F -II , at 220 KV Substation Bhupiamau, Pratapgarh Under Electy. Trans. Division-Pratapgarh.
BOQ Items
Dismantling of 100 MVA T/F HV/LV/TV/Neutral Bushing and its Turret, opening of all pipe line inlet/Outlet valve, inspection cover, Radiator Header, Gear Box, Buchholz relay, PRV, Oil pump , NRV & Jumpers for replacement of Gasket and jumpering of HV/LV side bushing after erection.
1
-
-
Providing and making of Top Cover Gasket of Transformer, Opening of Nut & Bolt, and removal of damage Gasket, cleaning of top surface & making new Gasket & fixing in
1
-
-
Replacement of Old and damaged gasket from different parts of the Transformers. The scope of works involves removal of Gaskets, Cleaning of surface, Fabrication of Gaskets of appropriate size of Konica/Telbroze/NE cork make and fixing of Gaskets at proper place with adhesive along with other associated works as per details given below-
-
-
-
Providing and making of HV Turret Gasket.
3
-
-
Providing and making of HV Bushing Gasket.
3
-
-
Providing and making of IV Turret Gasket.
3
-
-
Providing and making of IV Bushing Gasket.
3
-
-
Providing and making of Radiator Gasket
24
-
-
Providing and making of Radiator valve Gasket
12
-
-
Providing and making of Gasket of inspection cover.
12
-
-
Providing and making of Radiator pipe line 6 " dia.
20
-
-
Providing and making of C.T. inspection cover HV/LV
6
-
-
Providing and making of 1" Dia pipe pipe line Gasket.
15
-
-
Providing and making of Surge Relay Gasket.
3
-
-
Providing and making of Gasket Buchholz Relay.
1
-
-
Providing and making of Gasket of PRV
1
-
-
Providing and making of OLTC plate.
3
-
-
Providing and making of 1 " dia valve Gasket.
15
-
-
Providing and making of 2 " dia Valve Gasket.
12
-
-
Providing and making of 4" dia Valve Gasket.
10
-
-
Providing and making of TV Bushing Gasket.
3
-
-
Providing and making of N Bushing Gasket.
1
-
-
Providing and making of Flow indicator Gasket.
1
-
-
Providing and making of Gasket of oil pump
4
-
-
Providing and making of Gasket 3" dia Valve.
8
-
-
Providing and making of WTI/OTI Pocket.
2
-
-
Providing and making of Gasket of conservator tank.
2
-
-
Providing and making of Gasket of OltC tank.
1
-
-
Providing and making of nylon washer of radiator, Bushing Air releasing plugs.
1
-
-
Providing and making of Gasket of NRV
2
-
-
Providing and making of Gasket of MOG
1
-
-
Overhauling of diverter switch, removal the diverter switch from chamber cleaning by hot oil, removed the dirty oil and proper cleaning and fixing in original shape.
3
-
-
Erection of Turret HV / LV / IV side and erection of Bushing, Radiator, Header, Oil Pipe Line 6" and 3" Gear Box, OLTC Pipe Line, Pump, Flow meter, inspection Cover etc. for complete of work.
1
-
-
Performing the vacuum stand test, scope of work involves creating the vacuum inside the transformer upto 760 mm of Hg for evacuation of moisture from core & winding and maintaining the pressure at least 72 hours.
1
-
-
Complete Evacuation of main tank and filling of Dry Nitrogen of dew Point -50°C or better in Vacuum up to Pressure of 0.25 Kg./Cm² and the again evacuating the Transformer Tank after Required Time interval (approx. 12 Hrs.) using centrifuging Machine. The Work shall include connecting Pipes of Machine as Required and Measuring Due Point Values of N2 after every Cycle till the Required Value is Achieved.
1
-
-
Centrifuging of T/F Oil storage Tanks, un-interrupted till the desired BDV & PPM Value of the Oil is achieved and then filling & Topping up of the Centrifuged T/F Oil in Transformer as per standard Procedure to Maintain required Oil Level in the Transformer including commissioning of Air Cell if required Centrifuging & Cirulation of T/F OIl in Transformer, un-interrupted till the desired BDV&PPM Value of the Oil & IR Values of Bushings are achieved including Hourly Recording all the Parameters such as Temp. Vacuum, Insulation Resistance etc. Centrifuging Machine, Its Operator and all associated T&Ps shall be arrenged by the Contractor at his own cost.
61
-
-
Erection of Mulsifire system, Air /Water Pipe Lines, Proper replacement of Gasket and Tightening of Nut & Bolts.
1
-
-
Safe transportation of 20 KL oil tank from other UPPTCL Substation to 220 KV S/S Pratapgarh having distance approx 220 Kms. Work includes shifting and loading of Oil Tank with the help of Hydra/Crane at other UPPTCL Substation, safe transportation and unloading of it at working site near 100 MVA T/F-II at 220 KV S/S Pratapgarh with the help of Hydra.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements