If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date22 Jan 2025
Closing Soon5 Feb 2025
Tender Amount₹ 3,30,872 
Notes
Download

Costs

Summary

Increasing Capacity Of 132 Kv Sub-station Bina Under Etd, Robertsganj

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Increasing capacity of 132 KV Sub-station Bina under ETD, Robertsganj
Increasing capacity of 132 KV S/S Bina under ETD, Robertsganj.
Increasing capacity of 132 KV S/S Bina under ETD, Robertsganj.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Shifting of main tank 20 MVA T/F from plinth to safe place (up to 20 meter distance) after opening of jumpers, cutting of earthing and opening of cable connection etc. including turning of tank if required, including all T&P and work required to complete the job satisfactorily.

1

-

-

... More
Additional shifting of 20 MVA T/F for 100 Meter (@ 5 Meter/job.

20

-

-

... More
Safely Shifting and placing of 20MVA T/F on Wooden sleeper platform (Wooden sleeper platform provided by contractor) to complete the job satisfactorily.

1

-

-

... More
Shifting of dismentaled HV bushing, radiator, all associated pipe at safe place or store & banking the same with suitable size Gasket and iron plate alongwith nut bolt to complete the job satisfactorily.

1

-

-

... More
Raising the height of 3 Nos. ALP structure for 30KV LA after dismantling of LA and structure and again its erection, replacement of all the Panther conductor, jumpering of 33KV sideof 40 MVA, 132/33KV T/F from 33KV Bushing to 33KV Bus Bar with ACSR Moose conductor, fixing of all the isolator clamps, CB clamps, LA clamps, CT clamps suitable for proper size of Moose conductor and jumpering of all the 33KV side equipment.

1

-

-

... More
Dismantling of all cable connections of 20 MVA T/F and its RTCC panels, re-termination along with re-glanding and re-ferruling as per new cable schedule of 40MVA T/F and its RTCC panels.

1

-

-

... More
Dismantling of 33 KV Old CTs of CTR 400-200/1-1A& erection of new 33 KV new CTs with CTR 800/400/1-1A, setting the CTR on 800/1A, cable termination, shorting; including earthing of the instrument and all related work in all respect.

1

-

-

... More
Shifting, Erection, Centrifuging of oil, earthing and commissioning and other associated works of new 40 MVA, 132/33 KV Transformer at 132 KV S/S Bina

-

-

-

... More
Shifting of new 40 MVA T/F from unloading place to plinth (up to 20 Meter Distance) Including turning of tank, if required, including all T&P and work required to complete the job satisfactorily along with all accessories from unloading place to near T/F erection site.

1

-

-

... More
Additional shifting of 40 MVA T/F for 40 Meter (@5 Meter/job.)

8

-

-

... More
Complete Erection of 40 MVA T/F by erection of radiators, conservator tank, all bushing with their turrets, connecting oil pipe, cooling fans, motor drive mechanism with tap changer, RTCC panel, and associated oil pipe line etc. to complete the job satisfactorily, including first filling of oil and topping up of T/F oil in tank, radiator pipe lines, conservator tank etc. and attending oil leakage, if any and all other associated work for satisfactory completion of work along with arrangement of labour and T&P to complete the job in all respect.( Hydra, crane, special tools, will be arranged by contractor.

1

-

-

... More
Centrifuging of complete 40 MVA T/F oil in T/F & Tank by connecting Centrifuging pipes, circulating the T/F oil through centrifuging machine to be provided by the contractor & taking the BDV value of the oil periodically till the required value is achieved as per direction of supervising engineer, all T&P, labour, and centrifusing machine shall be provided by the contractor.

19500

-

-

... More
Earthing of erected 40 MVA T/F main tank, neutral bushing, marshaling box, OLTC, RTCC, C&R panel etc at two points using 75x10/50x6mm M.S. flat (MS flat shall be provided by the contractor), the above also includes painting of earthing strip with one coat of red oxide primer and two coat of bus green synthetic enameled paint.

1

-

-

... More
Laying & termination of new control cables for 40 MVA T/F from control and relay panel to marshelling box / equipment / JB etc. for new 40 MVA T/F as per cable schedule and inter-connection with control cable at marshalling box and OLTC panel to RTCC panel to each fan with ferruling and dressing with proper gland & ferrule etc as per drawing schedule including all cost of ferrule,gland,men,material & t&p etc. provided by contractor

1

-

-

... More
Jumpering of all phases of HV and LV bushing of 40 MVA T/F.HV bushing jumpering should be done through newly constructed jack bus and LV bushing jumpering should be done from LV bushing to 33 KV main bus side isolator

1

-

-

... More
Conducting BDV, PPM and DGA tests of transformer oil of 40 MVA T/F job includes 03 nos. sample collection of T/F oil in suitable container tank and its transportation to NABL and submitting its test report. First job after completion of work and second job after charging of 15 days.

1

-

-

... More
SFRA Testing of 40MVA T/F WRM Testing of 40 MVA T/F.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.