Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Eprocure
Opening Date21 Dec 2024
Closing Date24 Jan 2025
Tender Amount₹ 45,67,906 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.

380

13

4962.8

... More
Providing and laying in position cement concrete in proportion of 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level :

42

4835

203109.9

... More
Providing and laying in position cement concrete in proportion of 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level :

46.57

6187

288172.97

... More
Centering and shuttering including strutting, propping etc. and removal of form work for :(4.3.1) Foundations, footings, bases for columns

338.08

290

98354.23

... More
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources).

13.43

367

4937.81

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).

9.02

8535

77008

... More
Providing and laying in position reinforced cement concrete in proportion of 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) , excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :

103.34

6710

693463.1

... More
Centering and shuttering including strutting, propping etc. and removal of form for(5.9.1)-Foundations, footings, bases of columns, etc. for mass concrete

216.7

290

63042.36

... More
Centering and shuttering including strutting, propping etc. and removal of form for(5.9.2)-Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

17.12

625

10700.34

... More
Centering and shuttering including strutting, propping etc. and removal of form for(5.9.6)-Columns, Pillars, Piers, Abutments, Posts and Struts

72.09

713

51411.7

... More
Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls (5.9.16.1)Under 20 cm wide

22.2

154

3434.78

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:(6.1.2) Cement mortar 1:6 (1 cement : 6 coarse sand)

5.77

5291

30524.93

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:(6.1.1) Cement mortar 1:4 (1 cement : 4 coarse sand)

74.01

5468

404702.06

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :(6.4.2) Cement mortar 1:6 (1 cement : 6coarse sand)

1.96

6755

13227.11

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :(6.4.1) Cement mortar 1:4 (1 cement : 4 coarse sand)

4.42

6932

30633.79

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1399.19

99

138785.46

... More
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment but when steel is to be provided by the department.

6.16

59694

367595.65

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(5.22.6)-Thermo-Mechanically Treated bars of grade Fe-500D or more.

6862.92

80

549102.23

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.(5.22A.6)-Thermo-Mechanically Treated bars of grade Fe-500D or more.

1172.2

80

93787.4

... More
Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work

72

544

39168

... More
Fixing and grouting 28 mm and above dia bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) .

72

114

8208

... More
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work.

288

368

105984

... More
Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) .

364

89

32396

... More
Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) .

185

24

4440

... More
Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only).

4

480

1920

... More
Same in NSI item-23 above but for auxiliary structure. (labour rate only).

69

296

20424

... More
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only).

209

19

3971

... More
Fabrication of template for main gantry foundation including cost of all labour, and T&P etc. required for proper completion of the work. Steel shall be arranged by contractor free of cost. This template shall be property of contractor.(Labour rate only).

2

1444

2888

... More
Same as above NSI item no.-26 but for auxiliary foundations.(Labour Rate)

159

654

103986

... More
Providing and fixing hard drawn steel wire fabric 75x25 mm mesh of weight not less than 7.75 Kg per sqm to window frames etc. including 62x19 mm beading of second class teak wood and priming coat with approved steel primer all complete.

20

1217

24350.4

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.(10.25.2)In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

1008.74

128

129168.52

... More
Providing (12x15) mm section groove in plaster including all material, labour and T&P etc. required for proper completion of the work.

93.23

21

1957.73

... More
2.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC

22.75

527

11991.07

... More
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.110 mm diameter(12.41.2)

30

279

8399.4

... More
12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand)

305.25

265

80924.03

... More
6 mm cement plaster of mix :(13.16.1)1:3 (1 cement : 3 fine sand)

79.63

222

17748.06

... More
Neat cement punning.

138.92

59

8239.58

... More
Finishing walls with ready mixed Premium acrylic emulsion paint (Company Depot Tinted) having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade with silicon additives.(13.48A.1)New work (Two or more coats applied @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm.

196.35

134

26400.55

... More
With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works

79

50

3950

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :(13.62.1)Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture

169.77

167

28495.73

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :(13.99.1)One or more coats on old work

79

76

6024.54

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.(15.7.4)In cement mortar

32.25

1528

49295.49

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.(15.2.1)Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

52.64

1805

95062.58

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.(15.2.2)Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)

15.67

1115

17479.41

... More
Dismantling of existing pale / security / chain link fencing including post and stacking properly as per direction of the Engineer - in - charge. Including all labour and T&P etc. required for proper completion of the work.

75.74

233

17647.42

... More
Dismantling and re-laying of dry B.O.E. floor including cost of all labour and T&P required for proper completion of work.(labour rates only)

26.95

535

14418.25

... More
Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead :

4

977

3910.08

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.

57.58

195

11275.32

... More
Transportation and installation of tube well drilling Rig m/c, compressure for development and other required equipments and accessories at site of work and dismentlling & taking them back after successful completion of the work including cleaning, levelling - dressing the site properly, also disposing off the surplus earth, silt, sand etc.

1

11000

11000

... More
S/F in position 105 lbs M.S. Rail for transformer plinth including cost of all labour, material and T&P etc. required for proper completion of the work.

10

5066

50660

... More
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.

55.43

97

5417.73

... More
Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost).

55.43

298

16570.24

... More
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc(18.1.6)50 mm dia nominal bore

120

565

67850.4

... More
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :(18.17.4) 50 mm nominal bore

2

761

1523.28

... More
Providing and fixing gun metal non- return valve of approved quality (screwed end) :(18.19.4.1)50 mm nominal bore Horizontal

1

1017

1017.25

... More
Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) :(18.46.6)50 mm nominal bore

3

611

1833.45

... More
Supply and fixing support clamps for column pipes made out of MS flats, pairs of bolt-nuts etc complete with all material, labour, T&P. (CSI No. 19.24) (d)40mm dia.

2

411

822

... More
Lowering of M.S. column pipe in tubewell including supply of nuts, and bolts, packing and also carriage of pipe from workshop to site including all labour, T&P etc. required for proper completion of the work. a)80/65/50/40/32 mm dia.

4

277

1108

... More
Supply & installation of electrical control panel of L&T / Havells or equivalent make for submersible pump / pumpset containing contractor relay condenser. c) for 3 H.P pump set single phase

1

6599

6599

... More
Supply & Installation of submersible pump of K.S.B/ CALAMA. or eqt. make including cost of labour, T&P and material required for completion of work. d) 3 HP outlet 50 mm dia. or more, Head 60/24, Discharge 6000/14000 LPH

1

29260

29260

... More
Supply & fixing of steel wire rope for submersible pump including cost of labour, T&P and material required for completion of work.

50

49

2450

... More
Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level.(23.1.1.2 ) 350 mm dia

90

574

51681.6

... More
Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 150 metre depth below ground level.(23.2.1.2 ) 350 mm dia

60

680

40835.4

... More
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge.(23.3.3) 200 mm nominal size dia

100

825

82596

... More
Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge.(23.4.3)200 mm nominal size dia

50

931

46578.5

... More
Gravel packing in tubewell construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge.

16

1501

24030.56

... More
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.

40

804

32198.8

... More
Providing and fixing Bail plug/ Bottom plug of required dia to the bottom of pipe assembly of tubewell as per IS:2800 (part I).(23.15.3)200 mm dia

2

265

530.58

... More
Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete.(23.14.3)200 mm clamp

2

1701

3403.18



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.