Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Civil And Construction
Electrical and Electronics
Eprocure
Opening Date7 Feb 2024
Closing Date26 Feb 2024
Tender Amount₹ 17,45,002
Costs
EMD
₹ 36,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCTL_892105_1Bid Award Id
ViewTender No
Tender No-28Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earth filling under floors and/or corporation area including cost of earth obtained with in 8 km distance outside corporation area including all taxes (if any) and its carriage including watering, ramming in 20 cm layers and dressing of earth etc. all complete. (CSI No. 4.10)
10
4360
436
Concrete with 4cm gauge stone ballast, coarse sand (F.M. 1.8 to 2.5) & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.02)
20
116400
5820
Concreting of 40 mm thick RCC trench covers in mild steel frame work with RCC 1:1.5:3 in Cement,Chopan coarse sand (F.M. 1.8 to 2.5) and 2cm gauge graded hard stone ballast with 3mm thick floating coat of neat cement finish on top of cover complete with all labour, materials and placing the same in proper position at required location of cable trench within the substation area. (CSI No. 5.18)
25
9325
373
Cement concrete with 2cm gauge approved hard stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 3:1.5:1 including supply of all materials, labour,side shuttering if required and T&P etc. required for proper completion of work (CSI No. 5.21)
15
119835
7989
RCC work with cement, approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like granite quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3 in raft foundation and footings , excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27)
20
176020
8801
RCC work with cement, approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like granite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3 in pile caping, gantry walls/column foundations and RCC pedestals, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P (CSI No. 5.28)
28
254128
9076
First class brick work in 1:4 cement and coarse sand (F.M.1.8 to 2.5)mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work (CSI No. 6.03)
30
167790
5593
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (CSI No. 9.01)
0.8
79251
99064
TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor) (CSI No. 9.03)
1.2
105681
88068
Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work (CSI No. 9.12)
64
40320
630
Fixing and grouting 52/40/32/28 mm bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . (CSI No. 9.13)
64
4160
65
Supply of 25 mm dia.M.S. Anchor bolts (conforming to
IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14)
60
24360
406
Fixing and grouting 25 mm dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15)
60
3060
51
Providing M.S. Frames work, rack etc for R.C.C. Trench covers and edging with M.S. angles and M.S reinforcement including cutting, bending and welding as per approved drawing. The rate is including cost of all labour, materials etc. as required for proper completion of the work. (CSI No. 9.20)
1.5
144603
96402
S/F welded wire mesh size 75x25mm and rectangular made out of 10 SWG over M.S. angle frame with M.S. flat welded as required including cost of drilling holes, washer welding etc as required including cost of all material, labour and T&P etc. required for proper completion of work . except cost of M.S angle and flat. (CSI No. 9.22)
120
56640
472
Fixing of template in position level and alignment for grouting of Anchor bolt in Main Gantry (labour rate only). (CSI No. 9.31)
4
1084
271
Fixing of template in position level and alignment for grouting of Anchor bolt in Auxiliary Structure (labour rate only). (CSI No. 9.32)
12
2016
168
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (CSI No. 9.33)
150
1650
11
12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07)
150
29250
195
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)
342
3078
9
3 mm thick floating coat of neat cement finish including supply of all materials,labour and T&P etc. required for proper completion of the work.( cement consumption
0.044 bag/Sq.m.) (CSI No. 11.20)
150
3150
21
2.5 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and including 7.5 cm thick base concrete consisting of cement, coarse sand and 4cm gauge I class brick ballast in the proportion of 1:6:12 and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work but for without base CC (CSI No. 12.02)
10
2740
274
4.0 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (CSI No. 12.04)
80
33360
417
First class bricks on edge floor laid dry, joints sand filled, including preparation of base to proper slope and its ramming including supply of all material labour & T&P etc. required for proper completion of the work. (CSI No. 12.07)
30
17400
580
Painting or varnishing new iron work in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mix paint "Luxol" or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01)
120
9240
77
As in item 13.01 above but every coat after the first coat. (CSI No. 13.02)
120
4320
36
Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position (CSI No. 13.28)
60
780
13
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metres. (CSI No. 15.01)
5
2915
583
Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-Incharge within a distance of 60 metres. (CSI No. 15.03)
10
12930
1293
Dismantling of existing R.C.C. Gantry/ Auxiliary foundation with the help of mechanical means in switchyard including disposal of refuse/ debris as per direction of Engineer - in - charge. Including all labour and T&P etc. required for proper completion of the work. (CSI No. 15.15)
6
12522
2087
Laying cement concrete road slab consisting of 1 part cement 1.5part approved coarse sand and 3 part approved 20mm down graded stone aggregate over prepared sub grade after its rectification and bringing it to proper camber and shape,finishing with TRIMIX machine ,concrete hardner and making good to the satisfaction of E/I inclduing cost of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.13)
5
44770
8954
Filling of 20 mm. wide 100/150 mm. deep joint with coarse sand and saw dust mixed with hot bitumen etc. complete including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.14)
10
450
45
Boring holes 3.5 M deep below cut off Level in all types of strata including loose sandy strata under water requiring use of modified auger and cutting tools with gravity valves and removable casing pipe, if required, for proper completion of work with cost of all labour, material, T&P required. (CSI No. 21.01) (b) 300 mm dia
pile
16
21696
1356
Boring holes 3.5 M deep below cut off Level in all types of strata including loose sandy strata under water requiring use of modified auger and cutting tools with gravity valves and removable casing pipe, if required, for proper completion of work with cost of all labour, material, T&P required. (CSI No. 21.01) (c) 400 mm dia
pile
1
1705
1705
Cutting the bore hole for providing under ream of 2.5 times the dia. of pile upto 3.50 metre below the cut off leveling tools including cleaning the bore hole and including cost of all materials, labour and T&P etc. as may be required for proper completion of work. (CSI No. 21.02) (b) for 300 mm dia pile
16
12528
783
Cutting the bore hole for providing under ream of 2.5 times the dia. of pile upto 3.50 metre below the cut off leveling tools including cleaning the bore hole and including cost of all materials, labour and T&P etc. as may be required for proper completion of work. (CSI No. 21.02) (c) for 400 mm dia pile
1
947
947
Extra for every additional depth of boring work as described in item No.21.01 above but beyond 3.50 Metre below the cut off level. (CSI No. 21.03 )(b) for 300 mm dia pile
8
6040
755
Extra for every additional depth of boring work as described in item No.21.01 above but beyond 3.50 Metre below the cut off level. (CSI No. 21.03 )(c) for 400 mm dia pile
1
985
985
As in item N0. 21.02 above but for under reaming beyond 3.50 Metre below the cut off level. (CSI No. 21.04)(b) for 300 mm dia pile
16
14432
902
As in item N0. 21.02 above but for under reaming beyond 3.50 Metre below the cut off level. (CSI No. 21.04)(c) for 400 mm dia pile
1
1566
1566
Supply and fabrication of M.S. (tor) reinforcement cages for piles including cutting, bending, welding as per design and placing of the cage in the pile bore including cost of all material, labour,and T&P etc. as may be required for proper completion of the work including all incidental wastage. (CSI No. 21.06)
0.8
71511
89389
R.C.C. work with cement, approved coarse sand 2cm gauge approved stone ballast in 1:1.5:3 proportion for concreting in all type of piles including labour & material for proper completion of the work. Measurement of work be done according to design diameter and depth of pile upto cut off level. Under reamed concrete shall be measured as per IS 2911 Part II (CSI No. 21.08)
8
78296
9787
Cutting & chipping the piles top above the cut off level including bending & straightening the pile reinforcement as directed including cost of al materials, labour & T&P etc as may be required for completion of the work.
(CSI No. 21.11)(b) For 300 mm dia pile.
16
6816
426
Cutting & chipping the piles top above the cut off level including bending & straightening the pile reinforcement as directed including cost of al materials, labour & T&P etc as may be required for completion of the work.
(CSI No. 21.11)(c) For 400 mm dia pile.
1
543
543