If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Civil Works Others
Eprocure
Opening Date1 Nov 2019
Closing Date7 Nov 2019
Tender Amount₹ 24,90,752 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing jungle including uprooting of rank vegetations,grass, bush, wood, trees and saplings of girth upto 30cm measured at a height of 1.0m above ground level and removal of rubbish upto a distance of 50m outside the periphery of UPPCL area cleared. (CSI No. 4.08)

500

-

7

... More
Concrete with 4cm gauge stone ballast, coarse sand (F.M. 1.8 to 2.5) & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.02)

30

-

6628

... More
Concrete with 4cm gauge stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 8:4:1 in foundation & under floors including supply of all materials, labour & T&P etc. complete. (CSI no. 5.04a)

5

-

7018

... More
Concreting of 40 mm thick RCC trench covers in mild steel frame work with RCC 1:1.5:3 in Cement,Chopan coarse sand (F.M. 1.8 to 2.5) and 2cm gauge graded hard stone ballast with 3mm thick floating coat of neat cement finish on top of cover complete with all labour, materials and placing the same in proper position at required location of cable trench within the substation area. (CSI No. 5.18)

25

-

379

... More
Cement concrete with 2cm gauge approved hard stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 3:1.5:1 including supply of all materials, labour,side shuttering if required and T&P etc. required for proper completion of work (CSI No. 5.21)

30

-

8324

... More
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries and approved coarse sand in proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. . (CSI No. 5.23)

1

-

9582

... More
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries and approved coarse sand in proportion 1:1.5:3 in slab, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P . (CSI No. 5.24)

2

-

11067

... More
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3 in raft foundation and footings, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27)

30

-

9187

... More
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3 RCC pile caping, gantry walls/column foundations and RCC pedestals excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P (CSI No. 5.28)

37

-

9481

... More
First class brick (class-150) work in 1:6 cement and coarse sand (F.M.1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01)

6

-

5843

... More
First class brick (class-150) work in 1:4 cement and coarse sand (F.M.1.8 to 2.5)mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work (CSI No. 6.03)

50

-

6003

... More
First class brick (class-150) work in 1:6 cement and coarse sand (F.M.1.8 to 2.5) mortar in Super Structure including supply of all materials, labour & T&P etc. and also including honeycomb brick work but for walls of one brick thickness required for proper completion of work. (CSI No. 6.01+6.07+6.08)

8

-

6465

... More
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (CSI No. 9.01)

3.45

-

76551

... More
TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor) (CSI No. 9.03)

4

-

67942

... More
Supply & fixing of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work. (CSI No. 9.12+9.13)

96

-

607

... More
Supply & fixing 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14+9.15)

48

-

413

... More
Fixing and grouting 25 mm dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15)

76

-

43

... More
S/F welded wire mesh size 75x25mm and rectangular made out of 10 SWG over M.S. angle frame with M.S. flat welded as required including cost of drilling holes, washer welding etc as required including cost of all material, labour and T&P etc. required for proper completion of work . except cost of M.S angle and flat. (CSI No. 9.22)

75

-

386

... More
Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (CSI No. 9.30)

180

-

12

... More
Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (CSI No. 9.31)

6

-

227

... More
Fixing of template in position level and alignment for grouting of Anchor bolt in auxiliary structure (labour rate only). (CSI No. 9.32)

28

-

144

... More
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (CSI No. 9.33)

70

-

9

... More
Providing & fixing 1 mm.thick M.S. sheet garrage door with frame of 40x40x6mm angle iron, diagonal bracings with 50x5 mm flat and 5 mm thick M.S. gusset plates at the junctions and corners including supply and fixing of necessary fitting, 2 no lock rail of 16 mm dia,375 mm long and including pintel hooks at the top and bottom, applying a priming coat of red oxide paint on all sides complete . (CSI No. 9.34)

2

-

2952

... More
12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07)

500

-

205

... More
12 mm thick plaster with cement mortar consisting of one part of cement & six part of coarse sand(1:6),minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.09)

50

-

197

... More
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)

350

-

8

... More
3 mm thick floating coat of neat cement finish including supply of all materials,labour and T&P etc. required for proper completion of the work.(cement consumtion 0.044 bag/Sq.m.) (CSI No. 11.20)

180

-

18

... More
4.0 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (CSI No. 12.04)

200

-

450

... More
Providing and fixing glass strips of 3.15 mm thickness & 40mm depth in joints of floor and skirting at the time of laying floors, flush with floor level including supply of all materials, labour& T&P etc. completion required for proper completion of work. (CSI No. 12.14)

400

-

30

... More
Painting or varnishing new iron work in small areas or new wood work with one coat of ready mixed priming paint and two coat of approved superior quality ready mix paint "Luxol" or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01+13.02)

120

-

103

... More
Placing of trench cover of all size in proper position including transportation from different places within the S/S area including all labour, T&P etc. required for proper completion of the work as per direction of Engineer - in - charge. (CSI No. 20.11)

140

-

9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.