Uttar Pradesh Power Transmission Corporation Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date10 May 2023
Closing Date5 Jun 2023
Tender Amount₹ 14,25,00,000
Costs
EMD
₹ 14,25,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPTCL_801281_1Bid Award Id
ViewTender No
T-09/ETC/GZB/2023-24Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
MONOPOLE 220 KV D/C PD (15 –30 degree) with bottom X-arm at 18 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (15 –30 degree) with bottom X-arm at 21 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (30 –60 degree) with bottom X-arm at 21 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (0 –15 degree) with bottom X-arm at 25 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (0 –15 degree) with bottom X-arm at 32 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (0 –15 degree) with bottom X-arm at 35 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (30 –60 degree) with bottom X-arm at 35 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PC (15 –30 degree) with bottom X-arm at 18 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PC (15 –30 degree) with bottom X-arm at 21 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PB (0 –15 degree) with bottom X-arm at 21 meter height.
1
-
-
... More
Fabrication, galvanizing,Inspection & supply of 220 KV DC mono poles with extension nuts, bolts, washers & ladders, Anchor Bolts & Anchor plates/Templates etc as per design.
-
-
-
... More
MONOPOLE 220 KV DC PE (60 –90 degree) with bottom X-arm at 21 meter height with auxilary X arm.
1
-
-
... More
MONOPOLE 220 KV D/C PD (30 –60 degree) with bottom X-arm at 16 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (15 –30 degree) with bottom X-arm at 18 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (15 –30 degree) with bottom X-arm at 21 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (30 –60 degree) with bottom X-arm at 21 meter height.
2
-
-
... More
MONOPOLE 220 KV D/C PD (0 –15 degree) with bottom X-arm at 25 meter height. CT Pole
1
-
-
... More
MONOPOLE 220 KV D/C PD (0 –15 degree) with bottom X-arm at 32 meter height.
2
-
-
... More
MONOPOLE 220 KV D/C PD (0 –15 degree) with bottom X-arm at 35 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PD (30 –60 degree) with bottom X-arm at 35 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PC (15 –30 degree) with bottom X-arm at 18 meter height.
1
-
-
... More
MONOPOLE 220 KV D/C PC (15 –30 degree) with bottom X-arm at 21 meter height.
6
-
-
... More
MONOPOLE 220 KV D/C PB (0 –15 degree) with bottom X-arm at 21 meter height.
6
-
-
... More
TOWER :-Fabrication, galvanizing, inspection and supply of 220KV DC towers including extension and stub setting template as drawing and BOM.
-
-
-
... More
HT STEEL
55.2
-
-
... More
MS STEEL
36.4
-
-
... More
Fabrication, galvanizing, inspection and supply of STUBS of DC towers as per drawing and BOM.
6
-
-
... More
Hot dip galvanized , Hexagon round hexagon head transmission tower Bolts/Nuts/Washers for above structures as per BOM.
5.6
-
-
... More
GENTRY
-
-
-
... More
Fabrication, galvanizing, inspection and supply of DC towers including anchor Bolts , gantry structure as drawing and BOM.
25.9
-
-
... More
Hot dip galvanized , Hexagon round hexagon head transmission tower Bolts/Nuts/Washers for above structures as per BOM.
1.48
-
-
... More
OPGW
-
-
-
... More
24 Fiber(DWSM) OPGW Fiber optic cable including all hardware & Joint Boxes.
4.5
-
-
... More
Tower Accessories
-
-
-
... More
Number Plate
26
-
-
... More
Danger Plate
26
-
-
... More
Phase plate in set of red, blue and yellow
52
-
-
... More
Bird Guard
26
-
-
... More
Anti-Clalmbing Device
26
-
-
... More
Pipe Type Earthing Material
26
-
-
... More
Conductor Accessories for ACSR Zebra Conductor
-
-
-
... More
Vibration Damper
312
-
-
... More
Mid Span Compression joint
12
-
-
... More
Pre Formed Armour Rod
42
-
-
... More
Repair Sleeve
12
-
-
... More
Hardware & Fitting Accessories for ACSR Zebra Conductor
-
-
-
... More
Single Tension Fitting
210
-
-
... More
Single Suspension Fitting
42
-
-
... More
Double Tension Fitting
84
-
-
... More
Composite Silicon- Rubber Insulator string of 160 KN Suitable for 220 KV Tension Fitting
374
-
-
... More
Composite Silicon- Rubber Insulator string of 120 KN Suitable for 220 KV Suspension Fitting
42
-
-
... More
PART-B (WORK)
-
-
-
... More
Survey:- Survey including preparation of schedule of material marking location (Route length) and super impose the GPS coordinates of diverted locations on elevated road plan to get the clearance from building etc before start the work.
4.1
-
-
... More
Check survey & final peg marking (Route length)
4.1
-
-
... More
Foundation of Monopoles
-
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV D/C PE (60 – 90 degree) with bottom X-arm 21 meter with auxilary X arm.
1
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV D/C PD (30 – 60 degree) with bottom X-arm 16 meter.
1
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PD (15 – 30 degree) with bottom X-arm 18 meter.
1
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PD (15 – 30 degree) with bottom X-arm 21 meter.
1
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PD (30 – 60 degree) with bottom X-arm 21 meter.
2
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PD (0 – 15 degree) with bottom X-arm 25 meter with auxilary X arm. Suitable for cable termination.
1
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PD (0 – 15 degree) with bottom X-arm 32 meter.
2
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PD (0 – 15 degree) with bottom X-arm 35 meter.
1
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PD (30 – 60 degree) with bottom X-arm 35 meter.
1
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PC (15 – 30 degree) with bottom X-arm 18 meter.
1
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PC (15 – 30 degree) with bottom X-arm 21 meter.
6
-
-
... More
Soil Testing, Design and casting of tower foundation including excavation, foundation bolt setting, PCC (1:2:4), RCC (1:1.5:3), padding (1:3:6) and supply and placement of re-enforcement steel and backfilling MONOPOLE (220 KV DC PB (0 – 15 degree) with bottom X-arm 21 meter.
6
-
-
... More
Foundation Work of Towers & Gantry
-
-
-
... More
Cost of excavation of 220 KV tower foundation pits including all earth work , backfilling , leveling etc.
2569
-
-
... More
Setting of stubs including all foundation work but excluding the cost of concreting and excavation (Rate per location) for 220 KV DC towers & Gantry.
8
-
-
... More
Cost of concreting for all types of tower foundation including the cost of cement, dewatering, shoring and shuttering, forming curing but excluding cost of reinforcement bars.
370
-
-
... More
Cost of Reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc.
53
-
-
... More
Erection of following Monopoles
-
-
-
... More
220 KV DC PE (60– 90degree)Bottom X-arm 21 m with auxillary X arm
1
-
-
... More
220 KV DC PD (30– 60degree)Bottom X-arm 16 m
1
-
-
... More
220 KV DC PD (15– 30degree)Bottom X-arm 18 m
1
-
-
... More
220 KV DC PD (15– 30degree)Bottom X-arm 21 m
1
-
-
... More
220 KV DC PD (30– 60degree)Bottom X-arm 21 m
2
-
-
... More
220 KV DC PD (0– 15degree)Bottom X-arm 25 m
1
-
-
... More
220 KV DC PD (0– 15degree)Bottom X-arm 32 m
2
-
-
... More
220 KV DC PD (0– 15degree)Bottom X-arm 35 m
1
-
-
... More
220 KV DC PD (30– 60degree)Bottom X-arm 35 m
1
-
-
... More
220 KV DC PC (15– 30degree)Bottom X-arm 18 m
1
-
-
... More
220 KV DC PC (15– 30degree)Bottom X-arm 21 m
6
-
-
... More
220 KV DC PB (0– 15degree)Bottom X-arm 21 m
6
-
-
... More
Erection of Towers & Gantry
-
-
-
... More
Erection of Superstructure of 220 KV Towers and Gantry and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories , but including fitting of danger number, phase plates, bird guard and fixing & punching.
125
-
-
... More
Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10 mm/ 12 mm electrode & application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing toweer & Anchor towers.
3000
-
-
... More
Laying, stringing, tensioning, clamping, jointing etc of ACSR 'ZEBRA' conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting Armour rods, vibration dampers etc on all six phases of 220 KV DC lines.
4
-
-
... More
Stringing of ACSR Zebra Conductor by Hot Line Stringing Method.
2
-
-
... More
Laying, stringing, tensioning, clamping, joining etc of OPGW & termination at S/S Gantry end.
4
-
-
... More
Grounding work including earth work etc for pipe type grounding including cost of coke & salt.
26
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements