Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date24 Sep 2024
Closing Date10 Oct 2024
Tender Amount₹ 5,32,975
Costs
EMD
₹ 5,500Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_958772_1Bid Award Id
ViewTender No
34/AETC/2024-25Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Erection of new of 0.2 class accuracy 145 KV CT & PT at Diffrent TF/Line Bays. The work includes shifting of new CT from store to work site (distance aprox 200 mtr)with the help of crane,Modification of existing structure if required shall be included in the scope of work ,proper earthing with MS flate has to be ensured.the work also includes conection and termination of jumpers with proper tightening of clamps and conectors and also termination of protection and metering cable from CT to CT junction Box including laying of new cables as per requirement. 145 KV CT on TF/Line Bays ((At 132 Kv Substation Mau New -63 MVA TF -II - 02 Nos. & 132 KV Mau old Bay- 01 No.),(At 132 Kv Substation Mau Old -63 MVA TF -I & II - 06 Nos.),(At 132 Kv Substation Haldaharpur, 20 MVA TF -I - 02 Nos.),(132 Kv Substation Muhammadabad , 63/40 MVA TF - 03 Nos))
14
-
-
145 KV PT on Line Bays (At 132 Kv Substation Mau New -132 KV Main Bus -03 Nos.),(At 132 Kv Substation Haldaharpur, 132 KV Main Bus -03 Nos),(132 Kv Substation Muhammadabad , 132 Azamgarh Bay- 03 No.)
9
-
-
Laying of 4 core X 2.5 sq.mm size PVC control Cable between switchyard to control room if required as per drawing with proper tagging,termination,conection bothe side,ferulling and dressing,binding with clamp/cable tie on cable rack in cable rack in tunnel and trench.The cable shall be passing through cable hall cable rack &tunnel rack and trench,The work also include opening of trench cover and refixing them from trench after completion of work satisfactorily .
1000
-
-
Loading & Unloading with the help of hydra and Safely carriage of 145 KV CT/PT from 132KV S/S Mau Old to 132 KV S/S Mau New - (8 km. approx.), from 132KV S/S Mau Old to 132 KV S/S Haldharpur - (20 km. approx.), from 132KV S/S Mau Old to 132 KV S/S Muhammadabad - (25 km. approx.) through private vehicle as required provided by contractor
17
-
-
Following work to be done in replacement of 01No. 132 KV DPP panel and 02 Nos. 132 KV double feeder control panel at 132 KV substation muhammadabad and 132 KV substation Mau new respectively. Dismantling of old panel by opening of electrical connection, side nut bolt ,earthing, grouting nut & bolt and shifting from control room to Je store with the help of Hydra/crane (Distance approx 200 mtr) (one job for each panel)
5
-
-
Safe shifting of new control panel from JE store to control room with the help of skilled helper and placing in place of old control panel and erection and earthing of new control panel (one job each panel)
3
-
-
Laying of following size new Control Cables from Control Panel to Circuit Breaker , Current Transformer , Potential Transformer , Relay panel , DCDB, ACDB etc (as per requirement) 2 Core x 2.5 mm2
500
-
-
4 Core x 2.5 mm2
1500
-
-
6 Core x 2.5 mm2
1500
-
-
Termination of following size of cable laid above as per cable schedule including making necessary holds in gland plates or box wherever required supply and fixing of cable gland of appropriate size supply and providing of ferrules for each control cable (one job for each132 KV feeder)
3
-
-
Dismantling of 132 KV SF-6 old circuit breaker of 132 KV Kasimabad Bay at 132 KV S/S Mau New by opening cable,jumper, cutting earthing and shifting of breaker upto JE store with the help of Man Power/Hydra
1
-
-
Safe cariage of 132 KV SIEMENS make SF-6 CB complete in all respect from storage place of 132 KV S/S Mau Old to 132 KV S/S Mau New. Where required with safe loading and unloading with all cost of man, T&P, crane etc.
1
-
-
Erection of 132 KV SF-6 circuit breaker at 132 KV S/S Kasimabaad Bay at 132 KV S/S Mau New including shifting of material from storage place to site and all other associated work required for its proper erection with all cost of man, T&P, vehicle crane.
1
-
-
Termination of dismaintal old/newly laid various sizes control cable inclduing making necessary hole in gland of appropriate size supply and providing ferrules and Nos for each core of calbe and its termination with all cost of men, meterials, T&P etc.
1
-
-
Providing of service engineer for erection and commissioing of 132 KV SF-6 circuit breaker and testing of opening and closing time of CB.
1
-
-
Dismantaling of old 120 KV LA of line/Transformer Bay by opening jumper cutting earthing and shifitng of old LA to JE store. 132 KV S/S Mau New (15 No.), 132 KV S/S Mau Old (06 No.), 132 KV S/S Muhammdabad (06 No.), 132 KV S/S Haldharpur (03 No.)
30
-
-
Erection of 120 KV LA of line/Transformer Bay, by carriage of LA from JE Store to site jumpering of LA earthing of surge counter with all respect complete job satisfactorily. Man material, T&P, Welding mechine will be arragne by contractor. (132 KV S/S Mau New (15 No.), 132 KV S/S Mau Old (06 No.), 132 KV S/S Muhammdabad (06 No.), 132 KV S/S Haldharpur (03 No.))
30
-
-