Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date30 Nov 2024
Closing Date5 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 2,500Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_978775_1Bid Award Id
ViewTender No
V.S.T. T.No. 27/ETCS/2024-25Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Complete safe Dismantling of the accessories of 132 / 33 KV 40 MVA Transformer-I (Tech. Asso. Make) including Opening of Jumpers, Removal of Earthing, Opening of Cable Connections, Draining out of Transformer Oil up to required level in 209 Ltr. capacity Oil Drums, Removal of Conservator Tank, Pipe Lines, Bushings, Cooling Fans, Marshalling Box, Radiators after Draining of Radiator Oil etc. and Fixing of Blanking Plates on the Radiators, Pipe Lines, Conservator Tank, Turret etc. with proper Stacking. Blanking Plate including Bolts & Nuts shall be provided by the Contractor.
1
-
-
... More
Shifting of Main Tank of 132 / 33 KV 40 MVA Transformer-I to storage place from the Plinth up to 20 Meter distance including turning of Tank if required.
1
-
-
... More
Additional Shifting of Transformer Tank upto 50 Meter distance (1 Job for every 5 Meter)
10
-
-
... More
Shifting of Main Tank of 132 / 33 KV 63 MVA Transformer to Plinth from place of storage up to 20 Meter distance including turning of Tank if required.
1
-
-
... More
Additional Shifting of Transformer Tank upto 50 Meter distance (1 Job for every 5 Meter)
10
-
-
... More
Complete Erection of 132 / 33 KV 63 MVA Transformer including Radiators, Conservator Tank, Bushings, Connecting Pipe Lines, Cooling Fans, Marshaling Box, OTI, WTI, Capilliary Pipes etc.
1
-
-
... More
Top up with fresh Transformer Oil from Transformer Oil Drums in main tank, bushings & conservator of transformer upto required level
1
-
-
... More
Centrifuging/Dehydration of the complete Transformer Oil of Transformer by Ultra High Vacuum Oil Filtration Plant after connecting the Centrifuging Pipes with Oil Tanker to Oil Filtration Plant including taking the BDV Values of Oil and megger values of the Transformer periodically till the required value is achieved, with all cost of Centrifuging Machine, CFM Operator, Lubricants etc.
21000
-
-
... More
Earthing of Main Tank, Marshaling Box, Drive Mechanism, Transformer Neutral etc. of 63 MVA Transformer with the help of 50 x 6 mm / 75 x 10 mm size M.S. Flat, its jointing with already laid Earthmat / Deltas including Additional Delta at 2 places and necessary modification in existing support for Earthing of Neutral Bushing support for its Earthing work and then Painting of Earthing Strips as per technical specifications / standard practice.
1
-
-
... More
Jumpering of HV & LV Bushings of 63 MVA Transformers through 132 K.V. and 33 K.V. LAs with the help of existing / newly prepared ACSR Twin Moose Conductor respectively with associated Terminal Connectors and P.G. Clamps etc. to connect with 132 K.V. & 33 K.V. Bus Bars / CTs.
1
-
-
... More
Connection of the Cables as per new Cable schedule of 63 MVA Transformer & its RTCC Panel at both ends and Control & Relay Panel, Cooling Fans, Marshaling Box etc. using existing Cables including Laying of additional Control Cables (if required), making necessary holes in the Glands Plates or Box wherever required, Supply & Fixing of Cable Glands of appropriate size, providing of Ferrules as per site requirement and Termination and connection of all existing / new Control Cables at RTCC & Transformer End and C & R end as per standard practice & all other associated works as per Technical Specification.
1
-
-
... More
Proper Packing of HV / LV & Neutral Bushings of dismantled 40 MVA Transformer including proper wrapping with Polythene Sheet in Wooden Crates of new Bushings of 63 MVA Transformer.
1
-
-
... More
Dismantling of 36 K.V. 800 / 1 Amp. CTs by due Opening of Jumpers, Earthing, Cable Connections, Nut & Bolts etc. and Shifting upto Store / designated place at the Sub Station as per direction of site Engineer.
3
-
-
... More
Safe Carriage of 36 KV 2000/1250/1 amp. 3 Nos CTs and 1.1KV 4CX2.5sqmm (upto 2 Km.) and 2CX2.5sqmm (upto 2 Km.) Control Cable from other Transmission Substation distance upto 200Km including Loading and Unloading of material.
1
-
-
... More
Erection of 36K.V. 2000 - 1250 / 1 Amp. CTs as per instruction manual and Technical Specifications including shifting of CTs from Store to Erection site including necessary connection of Cable & Earthing and Jumpering on both sides.
3
-
-
... More
Dismantling of 120 KV LA alongwith ALP structure and proper stacking after opening of jumpers and disconnection of earthing( 1 Job for each set of LA and ALP structure)
3
-
-
... More
Erection of 120 KV LA including erection of ALP structure and connection of earthing with existing MS flat at designated places and jumpering with jack bus as per technical specifications( 1 Job for each set of LA and ALP structure)
3
-
-