Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Eprocure
Opening Date25 Oct 2019
Closing Date11 Nov 2019
Tender Amount₹ 44,39,236 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth filling under floors and substation area including cost of earth when obtained from out side UPPCL area including its carriage, watering in to 20 cm layers and dressing of earth etc. complete. CSI no. 4.10

800

-

403

... More
Leveling & dressing & making proper slow including cutting and filing of earth up to a depth of 100 mm if so required including all labour T&P etc. required for proper comletion of the work. CSI No. 4.11

1000

-

3

... More
Concrete with 4 cm gauge 1st class brick ballast class 150mm coarse sand and cement in proportion of 12:6:1 in foundation and under floors including supply of all materials, labour &T&P etc. complete CSI no. 5.01

35

-

5332

... More
Concrete with 4cm gauge stone ballast, coarse sand (F.M. 1.8 to 2.5) & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.02)

10

-

6074

... More
Concrete with 4cm gauge class-1 stone ballast (class 150mm) coarse sand (F.M 1.8 to 2.5) & cement in proportion of 8:4:1 in foundation & under floors including supply of all materials, labour & T&P etc. complete. (CSI no. 5.04a)

5

-

6477

... More
Cement concrete with 2cm gauge approved hard stone ballast coarse sand (FM 1.8 to 2.5) and cement in proportion 4:2:1 including supply of all materials, labour and side shuttering if required and T&P etc. required for proper completion of work. (CSI no. 5.06)

30

-

7962

... More
Concreting of 40mm thick RCC trench cover in MS frame work (to be fabricated under other items of work ) with CC 1:1.5:3 in cement , Coarse sand with 2cm gauge graded hard stone ballast with 3mm thick floating coat of neat cement finish on top of cover complete with supply of all material labour T&P etc required for proper completion of work complete excluding cost of frame. CSI no. 5.18

100

-

376

... More
Cement concrete with 2cm gauge approved hard stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 3:1.5:1. including supply of all materials, labour,side shuttering if required and T&P etc. required for proper completion of work (CSI No 5.21)

25

-

8251

... More
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3 in raft foundation and footings, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27)

35

-

9066

... More
Same as item no 5.15a in RCC pile caping, gantry walls/column foundations and RCC pedestals but in the proportion 1:1.5:3. (CSI No. 5.28)

10

-

9357

... More
Same as CSI No. 5.27 but in R.C.C. T Beam slab and R.C.C. column. CSI No 5.29

15

-

12077

... More
First class brick work(class 150) in 1:4 cement and coarse sand (FM 1.8 to 2.5) mortar in foundation and plinth including cost of all materials, labour and T&P etc. required for proper completion of work CSI No. 6.03

60

-

5894

... More
Same as in CSI No. 6.03 but thickness of wall not to be less then 1 brick (230mm) thick including supply of all materials, labour and T&P etc. required for proper completion of work. CSI no. 6.03+6.07+6.08

15

-

-

... More
M.S. Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (CSI No. 9.01)

4

-

76551

... More
Mild steel ( TMT or Tor steel bars Fe415 or higher grade) in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage,bend, hooks & authorized overlapping shall be measured. (Steel shall be arranged by the contractor) CSI No. 9.03

6.65

-

67942

... More
Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work. (CSI No. 9.12)

64

-

445

... More
Fixing and grouting 32/28 mm bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . (CSI No. 9.13)

64

-

56

... More
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14)

350

-

293

... More
F/grouting 25 mm dia MS Anchor bolt in proper alignment level and set out with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. CSI No. 9.15

350

-

43

... More
Providing M.S. Frames work for R.C.C. Trench covers and edging with M.S. Angles including cutting, bending and welding of MS Angle & cutting and welding of MS bars for reinforcement & lifting hooks as per approved design. The rate is including cost of all labour, materials etc. as required for proper completion of the work. CSI No. 9.20

7.5

-

72568

... More
S/F welded wire mesh size 75x25mm and rectangular made out of 10 SWG over M.S. angle frame with M.S.flat welded as required including cost of drilling holes, washer welding etc as required including cost of all material, labour and T&P etc. required for proper completion of work . exept cost of M.S angle and flat.(CSI No.9.22)

210

-

386

... More
Fixing grouting of trench edging in proper level and alignment including cost of all labour and T&P etc required for proper completion of the work but excluding cost of C.C. CSI no. 9.30

350

-

12

... More
Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (CSI No. 9.31)

2

-

227

... More
Fixing of template in Auxiliary Structure for grouting of Anchor bolt in column of foundation. (labour rate only) CSI No. 9.32

65

-

144

... More
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (CSI No. 9.33)

310

-

9

... More
12 mm thick plaster with cement mortar consisting of 1 cement & 4 part of approved coarse sand of 2.5 fineness modulus over brick work minimum thickness not to be less than 10mm including supply of all materials, labour & T&P etc. required for proper completion of work. CSI no.11.07

650

-

208

... More
6 mm. thick plaster with 1:3 cement & coarse sand including labour, materials & T&P etc. required for proper completion of the work. (CSI No. 11.17)

105

-

171

... More
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)

560

-

8

... More
3mm thick floating coat of neat cement finish including supply of all materials, labour & T&P etc. required for proper completion of work. (cement consumption 0.044bag/sqm). CSI no. 11.20

270

-

18

... More
2.5 cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm graded stone ballast laid in panel finished with 3mm floating coat of neat cement as specified and removing any overlapping mortar at the joints of the panel if any and giving them a uniform finish including supply of all materials, labour and T&P etc. required for proper completion of work (Base CC shall be paid separately) CSI no. 12.02

125

-

289

... More
Same as CSI No. 12.02 but for 4 cm thick. CSI no. 12.04

35

-

446

... More
First class bricks on edge floor laid dry, joints sand filled, including preparation of base to proper slope and its ramming including supply of all material labour & T&P etc. required for proper completion of the work. (CSI No. 12.07)

20

-

552

... More
Straight over burnt bricks on edge floor laid dry, joints sand filled, including preparation of base to proper slope and its ramming including supply of all material labour & T&P etc. required for proper completion of the work. (CSI No. 12.09)

25

-

539

... More
First class brick on edge floor-laid in cement mortar consisting of one part of cement and six parts of coarse sand and pointed with cement mortar 1:2 over and including all materials, labour, T&P etc.required for proper completion of work. (CSI No. 12.15)

35

-

692

... More
Painting and varnishing on new wood, or new iron work with one coat of ready mixed priming paint and two coats of approved ready mixed paint (Luxol or equivalent brand or varnish) including supply of all materials, labour &T&P etc. required for proper completion of work CSI 13.01+13.02

40

-

-

... More
Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position (CSI No. 13.28)

100

-

12

... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metres. CSI No. 15.01

5

-

466

... More
Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-In-charge within a distance of 60 metres. CSI No. 15.03

10

-

1043

... More
Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Eng I/C within a distance of 60 metres. (CSI No. 15.05)

250

-

53

... More
Laying cement concrete road slab consisting of 1 part cement 1.5part approved coarse sand and 3 part approved 20mm down graded stone aggregate over prepared sub grade after its rectification and bringing it to proper camber and shape and making good to the satisfaction of E/I inclduing cost of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.13)

35

-

8616

... More
Filling of 20 mm. wide 100/150 mm. deep joint with coarse sand and saw dust mixed with hot bitumen etc. complete including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.14)

60

-

45

... More
Placing of trench covers of all size in proper position including transportation from different places within the S/S area including supply of all materials, labour and T&P etc. required for proper completion of work CSI No. 20.11

500

-

9

... More
Disposal of rubbish /debris out side the UPPCL area as per direction of Engineer-in-charge including cartage,labour and materials,T&P etc. required for proper completion of the work . CSI No. 20.16

35

-

308

... More
CONTRACTORS OFFER

-

-

-

... More
Coloured cell is compulsory to be filled by the Contractor

-

-

-

... More
Departmental estimated amount for above work (exclusive of GST) as per B.O.Q.

-

-

-

... More
Our rates are at :-

-

-

-

... More
Total Cost of Civil Works:-

-

-

-

... More
Total cost of civil works in Indian Rupees in Words :-

-

-

-

... More
If any problem TENDERERS QUOTES HIS RATES MANUALLY HERE :-

-

-

-

... More
Please struck out two words “above / at par / below” which are not applicable for your offer, failing which the tender shall be summarily rejected

-

-

-

... More
Tenderers are required to quote their offer “above / at par / below” the estimated cost, in case, any tenderer quoted rates against any individual items, then the offer shall not be entertained.

-

-

-

... More
The offer rates shall remain firm (not variable) for entire execution period.

-

-

-

... More
Departmental rates are exclusive of GST. Rates quoted by firm shall exclude GST which will be borne by department as per applicable rules.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.