Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Electrical and Electronics
Eprocure
Opening Date19 Dec 2023
Closing Date6 Jan 2024
Tender Amount₹ 7,59,533 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Loading of 132/33 KV 20 MVA T/F (BBL Make) main tank along with accessories, making the wooden sleeper plateform jacking the T/F up to the trailer height placing the rail under T/F tank and shifted up to the trailer removed the rail under T/F tank proper thightening the main tank trailer bad with the help of steel rope and turn buckle at 132KV S/S Dasna.

1

-

-

... More
Proper packing of all bushings of 132/37.5 KV 20 MVA T/F in wooden cases.

1

-

-

... More
Carriage of 132/33 KV 20 MVA T/F tank from 132KV S/S Dasna to 132KV S/S Bhoor along with all accessories by private truck/trailer distance appox. 60 Km.

1

-

-

... More
Unloading main tank of 132/33 KV 20 MVA T/F (BBL Make), loaded on trailer jacking the tank for packing the rail under the T/F tank shifting is of wooden to plate form, removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 20 MVA T/F like oil filled drums, bushing conservator tank, cooling fan etc. from Track/Trailer at site at 132KV S/S Bhoor.

1

-

-

... More
Shifting/dragging of 132/33 KV 20 MVA T/F (BBL Make) from unloading place to plinth up to 20 mtrs distance including turning of tank if required including all T & P and manpower to complete the job satisfactory.

1

-

-

... More
Additional shifting @ 5 Mtrs./Job.

2

-

-

... More
Replacement of gasket of raditor/bushing/pipeline etc. except top cover of T/F by providing and fixing of new gasket as per existing size made of rubberized cork sheet Kotika/Turborze brand grade 07.

1

-

-

... More
Complete, erection of 132/33 KV 20 MVA including raditors, conservator tank, all bushings with its turrets, connecting of all oil pipe lines, cooling fans, motor dirven mechansim of tap changer, RTCC Panel, making control cables connections, buchholz relay etc. for completing the work, topping of Transformer oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of job satisfactorily.

1

-

-

... More
Electrical connection of 132/33 KV 20 MVA T/F with laying of cable and Termination in between WTI, OTI, buchhalz relay, cooling fans, OLTC, Marshaling box etc. with proper feruling as per drawing.

1

-

-

... More
Earthing of Main tank of 132/33 KV 20 MVA by using M.S flat 50x6/75x10 mm size its jointing with already laid earthmat/deltas preparing Neutral bushing support for its earthing including all work as per current technical specification.

1

-

-

... More
Jumpring of 132/33KV 20 MVA T/F HV/LV side by cutting of conductor and its tightening with connectors as per site requirement.

1

-

-

... More
Centrifuging of complete oil in Transformer by connecting centrifuging pipes circulating the Transformer oil through centrifuging machine (to be arranged by the contractor) including taking BDV values of oil periodically till required valve is achieved (App. 15 KL)

15.8

-

-

... More
Earthing of earthing strip emanating from neutral point of 20 MVA T/F (BBL make) with two MS Flat and jointing with earthmat as per drawing by cutting, straightening, bending of MS Flat size 75x10 mm. for earthing of delta of neutral of HV and LV side of T/F with main earthmat and excavation and back filling of earth including painting of earthing strip

1

-

-

... More
Dismantling of 132KV SF6 Circuit Breaker with structure, cutting of earthing strip and opening of cables along with other associated work.

1

-

-

... More
Dismantling of 132 KV Bus Isolator along with other associated work.

1

-

-

... More
Dismantling of 132KV LA along with other associated work.

3

-

-

... More
Dismantling of 33 KV C.T along with other associated work.

3

-

-

... More
The erection of auxiliary structure consisting of ABL, ALP & BBL including all associated work complete in all respect. Spring washer/Flat washer ( to be provided by UPPTCL) shall be provided in each & every nut & bolts of the structure including shifting of material from store.

1.34

-

-

... More
Erection of equipments on erected structure including shifting of equipments from store to site. (i) Erection & commissioning of 132KV C.B. with its mounting structures, operating mechanism complete work.

1

-

-

... More
(ii) 132 KV Bus Isolator.

1

-

-

... More
(iii) 132 KV LA

3

-

-

... More
(iv) 33 KV Bus Isolator.

1

-

-

... More
(v) 33 KV C.T. with junction box.

3

-

-

... More
(vi) 33 KV LA.

3

-

-

... More
Erection of 132 KV Transformer Control & Relay Panel.

1

-

-

... More
Laying of control cable from control panel to its breaker/CT/PT already erected through cable trenches including removal of trench cover, cleaning & dressing as per cable schedule including clamping at a distance 2 mtr. With 25x3 mm. Alum. Strip. It includes cutting & making holes in various equipments, base plates & fixing of accurate sixe cable glands, binding the numbering tags on both side of cable making termination including all internal connection at each equipment on both ends with correct feruling. This also include placement of trench cover on trenches after completion of work. (i) 2x2.5 mm. sq.

1000

-

-

... More
(ii) 4x2.5 mm. sq.

1000

-

-

... More
(iii) 6x2.5 mm. sq.

1000

-

-

... More
Earthing of Sub-Station structure & equipments. (i) Cutting, Straighting, bending laying 700 mm. below inside ground & above of 50x6 mm. sixe MS flat for earthing of Auxiliary structure equipments including welding with main earth mat & with object to be earthed excavation of trenches its back filling painting & all other associated work satisfactorily.

50

-

-

... More
(ii) Earthing of 132 & 33 KV Lighting Arrestors by taking Delta consisting of fabrication of 04 Nos. 3100 mm. Long electrodes, its piercing inside ground below 600 mm. ground level and connection all four electrodes with 75x10 mm. M.S. Flat including strengthening, welding, painting of joints with Black Japan paint as per specification given by Engineer Incharge. (MS. round will be provided by the deptt. Free of Cost)

2

-

-

... More
Interconnection of equipments and bus bar including cutting, bending of conductor and Jumpering, Clamping along with all other associated work with Panther Conductor of above 132 KV & 33 KV bay to complete the job satisfactorily.

2

-

-

... More
Laying of 33KV 3Cx300 Sq. mm. XLPE copper cable in disginated trench as per instruction of Engineer Incharge.

160

-

-

... More
Supply & fixing of 33KV Termination Kit at both end suitable for 3Cx300 Sq. mm. XLPE copper cable with all accessories.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.