Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Electrical Generators And Transformers
Electrical and Electronics
Electrical Works
Eprocure
Opening Date26 Nov 2024
Closing Date23 Dec 2024
Tender Amount₹ 14,05,617.84 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 20,500Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_977479_1Tender No
ETC-35/2024-25Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Copper Bond
15
791
11865
Bus Post Clamp for Twin Moose
6
843
5060.46
Double tension fitting suitable for ACSR Moose conductor (Busbar Bolted Type)
54
1023
55257.12
Single Suspension fitting suitable for ACSR moose conductor (Busbar)
24
632
15179.76
Carriage
-
-
-
Carriage of following material from Electricity Febrication Unit, Naini, Prayagraj to 132 KV S/S Sarsol under ETD-I, Aligarh ( ALP-06 set, CCM-08 set, BBL-02 set, CGR-04 set & ABL-18 set, CPM-08 SET) (Total=11.885 MT). All T&P man power & vehicle will be arranged by contractor at his own cost (Distance approximate 600 Km.).
1
45000
45000
Proper safe loading of different structure material by sorting them at Electricity Febrication Unit, Naini, Prayagraj. All T&P man power & vehicle will be arranged by contractor at his own cost. ( ALP-06 set, CCM-08 set, BBL-02 set, CGR-04 set & ABL-18 set, CPM-08 SET) (Total=11.885 MT).
1
5000
5000
Proper safe un-loading of different structure material by sorting them at 132 KV S/S Sarsol Aligarh. All T&P man power & vehicle will be arranged by contractor at his own cost. ( ALP-06 set, CCM-08 set, BBL-02 set, CGR-04 set & ABL-18 set, CPM-08 SET) (Total=11.885 MT).
1
5000
5000
Dismentalling & Erection of Isolators & 132 KV Busbar
-
-
-
Erection of Main and auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structure required for installation of Isolators, C.Ts. P.Ts., L.As. and other equipments. The job consists of shifting of structure parts from store to site of erection, erection of structure as per relevant drawing and practices using flat and spring washer with each bolt .Matching of holes , cutting, matching of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material, water/ electricity shall be supplied by UPPTCL free of cost but all men, disposable material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost.
12
2100
25200
Erection of following equipments as per Instruction manual of various equipments and technical specifications including shifting of material/equipment from store to erection site including all other associated work to complete the job satisfactorily
-
-
-
33 KV Current transformer (CTs)
3
600
1800
120KV Lightning Arrester
3
900
2700
36KV jack Bus Isolator
18
2000
36000
30KV Lightning Arrester
3
800
2400
Junction Box for 33 KV CT
1
1000
1000
To Check and strengthening of grid for earthing of 30 KV LAs including fabrication of 6 no. 3.00 Mt. long electrodes, their placing 500 mm below ground level, interconnections using 50x6 mm MS flat.
1
3000
3000
To Check and strengthening of grid for earthing of 120 KV including fabrication of 6 no. 3.00 Mt. long electrodes, their placing 500 mm below ground level, interconnections using 75x10 mm MS flat.
1
3000
3000
Interconnection of bay equipments and bus bar including cutting, bending of conductor and jumpering, clamping along with all other associated work to complete the job satisfactorily as per drawing and technical specification
-
-
-
33KV Side Transformer - 2xMoose
1
700
700
33KV Side jack bus isolator to jack bus - 1xPanther
18
650
11700
Laying of following sizes of control cable in the cable trench from control relay panel to various equipments/ marshalling boxes/J.B. etc. in switch yard as per cable schedule, its saddling at every 75mm. distance with M.S. saddles of size 25x3mm. size including carriage of cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per technical specification.
-
-
-
2Cx2.5 Sq. mm. Unarmoured
1
3000
3000
4Cx2.5 Sq. mm. Unarmoured
1
3000
3000
6Cx2.5 Sq. mm. Unarmoured
1
3500
3500
10Cx2.5 Sq. mm. Unarmoured
0.5
4000
2000
Supply & fixing of junction box size 280×225×150 mm made of 10SWG sheet duly powder coated painted and fixed with MS flat clamp, nut-bolt with 1 no. 2Amp. MCB single pole, nutral and 08 number terminal block.
15
1320
19800
Taking out the above cable from junction box to light fitting fixed over the pole and gantry with fixing clamp of MS flat with each crossed bracing on structure proper dressing with all other associated work to complete the job as per specification including the cost of all material and labour excluding cable.
200
9
1800
Providing & fixing of new generation energy & enviornment friendly long aluminum outdoor beam Street light with high power 120W LEDs as light source & exclusively designed polycarbonate cover along with electronic driver complete fitting suitable for 220 Volt AC input supply of IS make or CGL/Havells/Philips with 2 year warranty after the date of installation Standard brand etc.
20
5500
110000
Supply & fixing of G.I. pipe bracket made of 40mm dia GI pipe 01 number with one band and total length of 850mm having single arm with required M.S. Clamp and Nuts and bolts suitable for fixing LED street light fitting.
15
1155
17325
Dismentalling of all jumpers of old 40 MVA, 132/33 KV T/F (Kanohar Make) from HV & LV side bushing
1
2750
2750
Complete Dismentalling the accessories of 40 MVA, 132/33 KV (Kanohar Make) capacity transformer after Removal of earthing and opening of cables of cable connection, draining out the transformer oil upto required level in 209 litres capacity oil drums/ tanker.
Removal of all radiators, conservator tank, oil pipe lines, all bushing turrets, fan motors , marshalling box, RTCC Panel etc with proper gasket along with nuts and bolts to complete the jobs satisfactorlly including proper stacking, blanking plates, nuts & bolts. Gaskets shall be provided by the department. All other T&P etc shall be provided by the contractor at his own cost.
1
22000
22000
Shifting of main tank of 40 MVA 132/33 KV transformer main tank from plinth upto 20 meter distance including turning of tank, if required including all Men Anmd T&P and all other works required to complete the job satisfactory as per tech specification.
1
22000
22000
Additional Shifting of 40 MVA T/F approx 5 mtrs or part there of including turning if any
6
2200
13200
Centrifuging of complete transformer oil in transformer main tank by connecting centrifuging machine, to be arranged by the contractor alongwith operator and taking the B.D.V ,IR & PPM values of the oil periodically till the required value is achieved as per direction of supervising engineer & Tech Speen. .
24000
2
52800
Shifting of main tank of new 63 MVA 132/33 KV transformer main tank from unloading point to plinth approximately 20 meter distance including turning of tank, if required including all T&P and all other works required to complete the job satisfactory as per tech specification enclosed.
1
33000
33000
Additional Shifting of new 63MVA T/F approx 5 mtrs or part thereof including turning if any
6
2750
16500
Complete Erection of new 63 MVA, 132/33 KV transformer by erection of radiators, conservator tanks, all bushing their turrets connecting oil pipe lines, cooling fans motor drive mechanism of tap changer RTCC Panel, oil pumps and associated oil pipe lines etc to complete the job satisfactorly including first filling of oil and topping up of transformer oil (not circulation) in tank radiator, oil pipe lines, conservator tank etc. and attending the oil leakage if any and all other associated works for satisfactorly completion of work. No crane/T&P shall be provided by the department.
1
49500
49500
If Required carriage of 20 KL Capacity oil storage tank on suitable vehicle from 220 KV Khair to Saorsol and revert back to 132 KV S/S Khair after completion of work
1
15000
15000
Earthing of 63 MVA T/F Neutrals, Body, Marshaling box, Drive mechanism etc. with 75X10/50X6 MS flat (To be provided by department) including, bending, cutting & welding etc.
1
5500
5500
Checking & strengthening of delta earthing consisting of 3 Nos., 3 mtr long electrodes its piercing inside ground & connecting all 3 electrodes with 75x10/50x6 mm M.S. Flat and connecting the same with main earthmat at 2 places (For both T/Fs , HV & LV side both) as required excluding the cost of MS Rod and flat).
2
2750
5500
Charging Approval of new Element i.e. 132 KV Transformer and all other equipment from Electricity Safety Department with deposition of fee and processing charges.The payment shall be made on the basis of invoce received or the rate quoted whichever is lower.
1
28000
28000
Dismentalling & Erection of Isolators & 132 KV Busbar
-
-
-
Dismentalling of 132 KV line isolators with E/S post insulator after opening of nut-bolt opening of jumpers ,disconnection of control cable and shifting of dismantlled isolators to store as per instruction of Engineer/In charge
4
7475
29900
Erection of 132 KV line isolators with 1 E/S of different make as per instruction manual and technical specification with post insulator, operating mechanism box, tie rod , arm and proper alignment for smooth operation. This work also includes painting of E/S MOM box with green color, shifting of new isolator from store to site termination of control cable, jumper connection, earthing (paited with green color) and all associated work for complete the job as per instruction of Engineer/In-charge
4
16950
67800
Dismentalling of 132 KV Main Bus isolators with post insulator after opening of nut-bolt opening of jumpers ,disconnection of control cable and shifting of dismantlled isolators to store as per instruction of Engineer/In charge
7
6950
48650
Erection of 132 KV Main Bus isolators of different make as per instruction manual and technical specification with post insulator, operating mechanism box, tie rod , arm and proper alignment for smooth operation. This work also included painting of E/S MOM box with green color, shifting of new isolator from store to site termination of control cable, jumper connection, earthing (paited with green color) and all associated work for complete the job as per instruction of Engineer/In-charge
7
14975
104825
Dismentalling of 132 KV Transfer Bus isolators post insulator after opening of nut-bolt opening of jumpers ,disconnection of control cable and shifting of dismantlled isolators to store as per instruction of Engineer/In charge
7
6950
48650
Erection of 132 KV Transfer Bus Isolators of different make as per instruction manual and technical specification with post insulator, operating mechanism box, tie rod , arm and proper alignment for smooth operation. This work also included painting of E/S MOM box with green color, shifting of new isolator from store to site termination of control cable, jumper connection, earthing (paited with green color) and all associated work for complete the job as per instruction of Engineer/In-charge
7
15975
111825
Dismentalling of 132 KV post insulator after opening of nut-bolt opening of jumpers and shifting of dismantlled PI to store as per instruction of Engineer/In charge
7
795
5565
Erection of 132 KV post insulator, included shifting of new Post insulator from store to site jumper connection, as per instruction of Engineer/In-charge
7
1190
8330
Dismentalling of 132 KV Main Bus from tension/Gun fitting and safely lowering down the single moose conductor having length of approximate-(36x6+24x3) Meter from both of the gantries. Shifting of material form site to store and all other associated .
9
5195
46755
Stringing of 132 KV Main Busbar with Twin ACSR Moose single phase Conductor having Approximate (36x6+24x3) meter between 2 Gantries with spacer and also shifting of material from to stor/site and all other associated work to complete the work satisfactorily as per technical specification
9
13595
122355
Dismentalling of 132 KV Transfer Bus from tension/Gun fitting and safely lowering down the single moose conductor having length of approximate-(36x6+24x3) Meter from both of the gantries. Shifting of material form site to store and all other associated .
9
5195
46755
Stringing of 132 KV Transfer Busbar with Single ACSR Moose single phase Conductor having Approximate (36x6+24x3) meter between 2 Gantries with spacer and also shifting of material from to store/site and all other associated work to complete the work satisfactorily as per technical specification
9
13595
122355
Dismentalling of all 132 KV Bus PTs/CTs/Isolators/CBs jumpers
144
330
47520
Re Jumpering of all 132 KV Bus PTs/CTs/Isolators/CBs jumpers
144
445
64080
Note-
-
-
-
1.GST shall be paid at the rate applicable at the time of invoice.
-
-
-
2.Bidders have to submit their % Rates above or below the Estimated Rates (Excluding "%" symbol in "Blue Box" only).
-
-
-
3.Bidders will submit their Rates by putting "X" for "X"% of Higher than Estimated Rates (ie.will put simply 1 for quoting 1.0% higher than Estimated Rates)
-
-
-
4.Bidders will submit their Rates by putting "-X" for "-X"% of Lower than Estimated Rates (ie.will put simply -1 for quoting 1.0% lower than Estimated Rates)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%