Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Aug 2024
Closing Date29 Aug 2024
Tender Amount₹ 6,77,953 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) ( 4.1.2 )

9

54659

6073.23

... More
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) ( 5.1.2 )

13

85624

6586.49

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth leve Thermo-Mechanically Treated bars of grade Fe-500D or more.( 5.22.6 )

1000

78530

78.53

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) ( 6.1.1 )

8

42934

5366.8

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.( 10.2 )

660

64251

97.35

... More
Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work(CSI No. 9.12)

64

34496

539

... More
Fixing and grouting 52/40/32/28 mm bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . (CSI No. 9.13)

64

7168

112

... More
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14)

36

13140

365

... More
Fixing and grouting 25 mm dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15)

40

3480

87

... More
Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (CSI No. 9.31)

4

1884

471

... More
Fixing of template in position level and alignment for grouting of Anchor bolt in Auxiliary (labour rate only). (CSI No. 9.32)

7

2030

290

... More
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). ( 9.33 )

50

950

19

... More
Fabrication of template for main gantry foundation including cost of all labour, and T&P etc. required for proper completion of the work. Steel shall be arranged by contractor free of cost. This template shall be property of contractor.(Labour rate only). ( 9.35 )

1

1422

1422

... More
Fabrication of template for Auxiliary foundation including cost of all labour, and T&P etc. required for proper completion of the work. Steel shall be arranged by contractor free of cost. This template shall be property of contractor.(Labour rate only). ( 9.36 )

3

1935

645

... More
12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (13.4.1)

150

39030

260.2

... More
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)

120

1826

15.22

... More
2.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC ( 12.26 )

20

10347

517.38

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture ( 13.62.1 )

30

4942

164.74

... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. ( 15.3 )

1

2585

2585.77

... More
Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge. ( 15.4 )

1

2313

2313.45

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern.( 16.91.2 )

10

7947

794.75

... More
Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) :300 mm dia piles( 20.3.1 )

61

136161

2232.16

... More
Extra over single under ream for providing additional bulbs in under reamed piles, under specified diameter(only the nos. of extra bulbs are to be paid)300 mm dia piles ( 20.4.1 )

16

30596

1912.29



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.