If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Eprocure
Opening Date22 Dec 2023
Closing Date2 Jan 2024
Tender Amount₹ 26,20,000
Costs
EMD
₹ 26,500Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPTCL_873066_1Bid Award Id
ViewTender No
82/ETC-II(P)/ 2023-2024Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
25x6sqmm MS earthing strip
200
-
-
40mm dia MS Electrodes (3 M Long)
180
-
-
40mm dia MS round bar
1500
-
-
Single Tension fitting duitable for ACSR panther conductor made of galvpnised Aluminium.
18
-
-
Double Tension fitting suitable for ACSR moose conductor made of galvpnised Aluminium.
7
-
-
33kV Bus post clamp suitable for ACSR moose conductor made of galvpnised Aluminium.
6
-
-
Following works are required for complete erection of 132kV& 33kV Transformer bay at 132kV S/S Sirathu under Electy. Trans. Division-IV, Prayagraj-
-
-
-
Dismantling of following material required installed on TSS bay for 132/25kV, 12.5MVA T/F (2- phase) at 132kV S/S Sirathu. This work also include dismantling of auxiliary structure of above equipments and shifting of above from site to substation store satisfactorly as per instruction of JE/SDO.
-
-
-
132kV bus isolator
1
-
-
132kV CT
2
-
-
120kV surge arrester
2
-
-
25kV CT
2
-
-
25kV BSI
3
-
-
33kV PT
3
-
-
Dismantaling of 132kV 2-phase,2-wire 132kV jack bus, 33kV main bus and associated jumper along with main & auxiliary structure (CCM-06No, CGM-03No and associated peak & mount) of disconnected 132/25kV 12.5MVA T/F bay at 132kV S/S Sirathu. This work also includes dismantaling of 132&33kV jumpers connected from main and jack bus and all associated works upto complition of job.
4
-
-
Erection of main structure ( AXM-02 Nos,CCM-02 Nos, CGM-01 Nos,CPM-02 Nos, YMM-02 Nos) main column, beam and all associated structures for extension of 132kV main bus& 33 kV Main Bus,of 132kV side T/F bay. This work are including shifting of all material i.e. structure part ,nuts, bolt ,washers etc from substation store to erection site. Matching of holes, cutting, matching of member if required shall be done by contractor.
3.2
-
-
Erection of auxiliary structure for installation of 132kV & 33kV BSI, LSI, PT, CT, LA and all associated structures for 132/33kV 40MVA T/F bay, including shifting of all material i.e. structure part ,nuts, bolt ,washers etc from substation store to erection site. Matching of holes, cutting, matching of member if required shall be done by contractor.
3.5
-
-
Erection of following equipments as per instruction manual of various equipments including shifting from store to erection site including all other associated work to complete the job satisfactorily:-
-
-
-
145kV post insulator
6
-
-
132kV Bus isolator
1
-
-
132kV SF-6 circuit breaker
1
-
-
132kV C.T
3
-
-
132 kV C.T. Junction box
1
-
-
33kV Bus isolator with junction box
2
-
-
Erection of 33kV CT including junction box
3
-
-
33kV Vacuum circuit breaker
1
-
-
132kV LA
3
-
-
33kV LA
3
-
-
33kV PT
3
-
-
Laying, tensioning, Stringing, joining of T/F 132kV jack bus by sing ACSR panther conductor per phase include hoisting of insulator, fitting of all accessories of all 3-phases conductor for extension of 132kV jack bus bar and of 18mtr length and stringing of 132kV jack bus on HV side of 40MVA T/F bay & all associated work required for completion as per technical specification.
6
-
-
Laying, tensioning &Stringing of new 33kV main bus bar by using twin moose conductor at only one section frm 33kV section isolator to gantry along with hoisting, clamping and fixing of all tension fitting hardware & insulators with fitting and other associated material. This work also include cutting of moose conductor at equal distance of section along with shifting and all minor works. (All T&P, men/labor will be provided by contractor)
6
-
-
Connection of jumper by using ACSR conductor on 132kV main bus to BSI,CB,CT,LA and 33kV main bus to BSI, VCB,CT,LA by using moose/panther conductor in all respect of associated including cutting, fitting and all associated works including the cost of labor and T&P required to complete the job.
50
-
-
Connection of U jumper of 33kV main bus to isolate the extension part of 33kV main bus by using twin moose conductor at working site for completion as per technical specification
6
-
-
Earthing of all electrical equipment & structure by using 75x10 & 50x6 sqmm MS flat below 600-1000mm from ground level and connecting it with existing 40sqmm earthmat includes back filling of excavated soil along with earhing of cable treanch with 25x6sqmm MS flat its leveling and proper ramming and all associated works including the cost of labor and T&P required to complete the job. earhing of cable treanch with 25x6sqmm MS flat
600
-
-
Painting of MS flat by one coat of anti corrosive red oxide primer and two coat of green enamel paint (Asian/burger/nerolac make).
600
-
-
Laying of 40mm diameter MS round bar, 800mm below ground level including cutting, strengthening wielding and jointing to existing earthmat ,painting of one coat red oxide and two coat of black bituminous paint adjoins excavation of trench, and connecting all existing MS flat from old earthing to new MS round bar with proper weilding and its back filling & all other associated works to complete extension bay as per drawing and technical specification excluding the cost of MS round bar. (Row to row distance 8Mtr.)
1500
-
-
Fabrication of meter long earthing electrodes conical shape 150mm of 40/36mm diameter MS round bar shall be driven then in the ground such that top of electrodes will be 800mm below the ground level jointing/ wielding all the electrodes with main earth mat including excavation of earth cutting jointing/ wielding and if other associated work with all their cost T&P, labor and material except MS rod.
160
-
-
Making of shield mesh/delta earthing of 120&30kV surge arrester on HV & LV side of new 40 MVA T/F consisting of 03meter long electrod with 6 nos. 40 mm dia size 40mm electrode rod to be placed inside the ground and connecting all the electrodes in form of mesh by using 75x10mm M.S Flat 800 mm deep and connecting the same with earthmat at two places
2
-
-
Laying and termination of following size of unarmored control cable from control room to equipment cable rack (CB,CT etc) via cable trenches and fixing of it with the help of 25x3mm aluminium strip and 6mm dia GI nut and bolts on cable rack up to termination point by cable tray including tag wielding on equipments as per AE/JE direction and all associated works to complete the job satisfactorily
-
-
-
6Cx2.5 sqmm.
1500
-
-
4Cx2.5 sqmm.
1500
-
-
2Cx2.5 sqmm.
1000
-
-
Erection of control & relay panel for 40MVA T/F including shifting from store to erection site and proper earthing of panel and all associated work to complete the job satisfactorily. This work also include termination of all control cable in panel and associated equipments such as CB, LSI,BSI, CT,PT and all associated works. This work also include connection of T/f panel to RTU along with all equipments live status as per direction of JE/AE.
1
-
-
Shifting of material from store to erection place in switchyard of following equipments-132 KV SF-6 CB, LA, CT, PI, BSI, panel and all associated material as per requirements.
1
-
-
Carriage of main structure ( AXM-02 Nos,CCM-02 Nos, CGM-01 Nos,CPM-02 Nos, YMM-02 Nos) and auxiliary structure of 132kV CT, BSI and 33kV CT, BSI & LA structure from EFU Naini to 132kV S/S Sirathu, Kaushambi. This work also include sorting, stocking of above materail and loading at EFU Naini and unloading at 132kV S/S Sirathu, kaushambi in his own cost and risk.
1
-
-
The following work to be carried out for erection work of 40MVA T/F including dismantling & shifting work of 132/25kV, 12.5MVA T/F at 132kV S/S Sirathu under ETD-IV, Prayagraj
-
-
-
Dismantaling work of old & used 132/25kV, 12.5MVA T/F is given below-
-
-
-
Complete dismantling the accessories of damaged 12.5MVA, 132/25kV power transformer at 132kV substation sirathu, after opening of jumpers, removal of earthing and opening of cable connection , draining out the transformer oil up to required level in 209 liters capacity oil drums/tanker, removal of all radiators, conservator tank , oil pipe lines, all bushings, turrets , fan motors, marshaling box, etc., blanking the radiators, oil pipe lines, conservator tank turrets,RTCC etc. with proper gaskets alongwith nuts and bolts to complete the job satisfactorily including proper stacking. Blanking plates, nuts and bolts and gaskets shall be provided by the department. All other T&P etc. shall be arranged by the contractor at his own cost.
1
-
-
Shifting of main tank of damaged 12.5MVA, 132/25kV power transformer from plinth to safe place including turning of tank if required, including men, T&P and all other associated works also if required to complete the job satisfactorily at 132kV substation sirathu,Kaushabi. This work also include Safe handling &Shifting of all accessories of 12.5MVA, 132/25kV power transformer such as radiators, conservator tank, bushings, cooling fans, motor drive mechanism of RTCC panel, oil pipe line etc. from site to stored place S/S sirathu, under ETD-IV Prayagraj including other associated works also if required for completion of job satisfactorily.
-
-
-
Upto 20 meter
1
-
-
Additional shifting of T/F ( 01 job for every 5 meter)
20
-
-
Following works are required for Erection of new 40MVA T/F at 132kV substation Sirathu -
-
-
-
Shifting of main tank of new 40MVA, 132/33kV M/s ECE make power transformer (ESD-608) from stacking place to loading point, turning of tank if required, including all T&P, men and all other works required to complete the job satisfactorly at 132kV Substation sirathu, under ETD-IV Prayagraj.
-
-
-
Upto 20 meter
1
-
-
Additional shifting of T/F upto T/F plinth ( 01 job for every 5 meter)
10
-
-
Complete erection of 40MVA, 132/33kV power transformer by erection of its radiators, conservator tank, all bushings, their turrets connecting oil pipe lines, cooling fans, motor drive mechanism of tap changer, oil pumps and associated oil pipe lines etc. to complete the job satisfactorily including first filling of oil and topping up of transformer oil ( Not circulation )in tank, radiators, oil pipe lines, conservator tank etc. and attending the oil leakage, if any, and all other associated works for satisfactory completion of work at132kV S/S sirathu. Contractor shall provide all assistance in getting the transformer successfully commissioned by providing qualified manpower till commissioning, including the cost of all men, T&P, and associated arrangements.
1
-
-
Topping of fresh Transformer oil from Transformer oil drums in suitable capacity oil tank and then centrifusing of transformer oil by ultra high vacuum oil filtration plant after connecting the centnfusing pipes with oil tanker to oil filtration plant including taking the BDV value of oil periodically till the required value is achieved and creating the vacuum inside 40 MVA Transformer before filling the Transformer oil including vacuum stand test with all cost of centrifusing machine, CFM Operator, lubricant etc
5000
-
-
Centrifuging of complete transformer oil of New 40MVA, 132/33kV M/s ECE make power transformer (ESD-608) in transformer tank or oil tanker by connecting centrifuging pipes, circulating the transformer oil through centrifuging machine, to be provided by the contractor and taking the BDV values of the oil periodically till the required value of the oil is achieved as per direction of supervising Engineer at 132kV substation sirathu, Kaushabi. All T&P, labor, centrifuging machine& other associated arrangements shall be provided by the contractor at his own cost.
22000
-
-
Erection of RTCC panel for newly erected 132/33kV,40MVA, M/s ECE make power transformer No.1 by including cable termination, connections in control room as well as cable connetion & termination in marshilling box of said T/F at 132kV S/S sirathu under ETD-IV Prayagraj including its shifting of materail from store and vice versa as per site requirement and other associated works if required till commissioning of RTCC panel & marshillin box. (Cable gland and ferrul will be provided by contractor on their own cost)
1
-
-
Jumpering of 40 MVA Transformer with associated terminal connector and PG Clamps etc. to connect with 132 kV jack bus with T/F HV Side bushing with single ACSR Panther Conductor & 33 kV CT to LV Side bushing of T/F with twin ACSR Moose Conductor
1
-
-
Testing of centrifuge T/F oil (DGA, ppm, BDV, tan delta)of new 40 MVA T/F at 132 kV S/S sirathu, from government approve laboratory after charging of transformer on load (preferbarly after 15 days)
1
-
-
Delta earthing of HV &LV neutral bushing of 40 MVA T/F consisting of delta set with 3 nos. 40 mm dia size 3 Mtrs long electrode rodto be placed inside the ground and connecting all the three electrodes with 75x10mm M.S Flat 800 mm deep and connecting the same with earthmat at two places
2
-
-
Earthing of main tank body of 40MVA, 132/33kV M/s ECE make power transformer (ESD-608) by using M.S.Flat of size 75x10mm, its jointing with already laid earth mat/deltas. Preparing neutral bushing support, excavation of trenches for earthing work , its back filling etc. This work also include HV&LV neutral earthing should be connect to double delta i.e. to be also connect with X-Y axis of M.S round bar. This work also include painting with one coat red oxide and two coat green color with Asian paint including all cost & materail.
150
-
-