Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Civil And Construction
Eprocure
Opening Date25 Nov 2024
Closing Date28 Dec 2024
Tender Amount₹ 18,61,216.13 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 22,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_966935_2Tender No
ETC-28/2024-25Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement, Concrete with 40 mm First class brick work in 1:4 cement, coarse sand of mortar in foundation and in plinth as per drawing including the supply of material labour & T&P etc. required for completion of work satisfactory with brickwork 1:4 (including cost of cement) with all cost of labour and T&P etc. required for completion of the work satisfactory.
93.76
3905
366132.8
... More
Cement, Concrete with 40mm brick/stone ballast coarse sand and cement in ratio of 1:2:4 on the top of plantform on the foundation including material, labour & T&P etc. required for completion of work satisfactory as per tech. specn. & drawing (including cost of cement) with all cost of labour and T&P etc. required for completion of the work satisfactory.
2.29
3800
8702
... More
12mm thick plaster work with mortar in ratio 1:4 cement & coarse sand including cost of all material labour & T&P etc. required for completion of work satisfactory as per tech. specn. (including cost of cement) with all cost oflabour and T&P etc. required for comletion of the work satsifactory.
233.18
590
137576.2
... More
Earth filling under floor and in area for the revetment for the tower including the cost of earth to be obtained from outside including watering ramming in 200 mm layers and dressing of earth etc.complete including the cost of earth royalty, taxes etc with all cost of labour and T&P etc. required for comletion of the work satsifactory.
160
141
22560
... More
First class brick soling work in flooring including laying of brick on 75mm edge and filling of Ganga sand in between the route including the preparation of base with all cost of labour and T&P etc. required for competion of the work satisfactory.
64
550
35200
... More
REVETMENT OF TOWER NO. 35A
-
-
-
... More
Excavation of foundation in including lift upto 2.3 mtr. Filling watering & rammaning excacated earth in the trench up to the space of building and the side of the foundation as per techanical specification and drawing with all cost of labour and T&P etc. required for complition of the work satisfactory.
205
141
28905
... More
Cement, Concrete with 40 mm brick/stone ballast coarse sand and cement in ratio of 1:4:8 in foundation under floor (in the size of 1.8m wide and 0.2 mtr. Thick including of supply of all material/ labour & tools etc. required for completion of work satisfactory with all cost of labour and T&P etc. required for completion of the work satisfactory.
22.36
3551
79400.36
... More
Cement, Concrete with 40 mm First class brick work in 1:4 cement, coarse sand of mortar in foundation and in plinth as per drawing including the supply of material labour & T&P etc. required for completion of work satisfactory with brickwork 1:4 (including cost of cement) with all cost of labour and T&P etc. required for completion of the work satisfactory.
193.17
3905
754328.85
... More
Cement, Concrete with 40mm brick/stone ballast coarse sand and cement in ratio of 1:2:4 on the top of plantform on the foundation including material, labour & T&P etc. required for completion of work satisfactory as per tech. specn. & drawing (including cost of cement) with all cost of labour and T&P etc. required for completion of the work satisfactory.
3.72
3800
14136
... More
12mm thick plaster work with mortar in ratio 1:4 cement & coarse sand including cost of all material labour & T&P etc. required for completion of work satisfactory as per tech. specn. (including cost of cement) with all cost oflabour and T&P etc. required for comletion of the work satsifactory.
381.88
590
225309.2
... More
Earth filling under floor and in area for the revetment for the tower including the cost of earth to be obtained from outside including watering ramming in 200 mm layers and dressing of earth etc.complete including the cost of earth royalty, taxes etc with all cost of labour and T&P etc. required for comletion of the work satsifactory.
363.68
141
51278.88
... More
First class brick soling work in flooring including laying of brick on 75mm edge and filling of Ganga sand in between the route including the preparation of base with all cost of labour and T&P etc. required for competion of the work satisfactory.
132.25
550
72737.5
... More
Note-
-
-
-
... More
1.GST shall be paid at the rate applicable at the time of invoice.
-
-
-
... More
2.Bidders have to submit their % Rates above or below the Estimated Rates (Excluding "%" symbol in "Blue Box" only).
-
-
-
... More
3.Bidders will submit their Rates by putting "X" for "X"% of Higher than Estimated Rates (ie.will put simply 1 for quoting 1.0% higher than Estimated Rates)
-
-
-
... More
4.Bidders will submit their Rates by putting "-X" for "-X"% of Lower than Estimated Rates (ie.will put simply -1 for quoting 1.0% lower than Estimated Rates)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%