Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date15 Jun 2024
Closing Date8 Jul 2024
Tender Amount₹ 2,75,500 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Shifting of main tank of New 63 MVA. 132/33 KV transformer from unloading point up to plinth, approximate 20 mtrs distance including turning of tank, if required including all T&P and all other works required to complete the job satisfactory as per tech Specn

2

-

-

... More
Additional shifting 1 Job for every 5 Mtr.

2

-

-

... More
Complete, erection of 63 MVA T/F by erection of radiator, conservator tank, bushing with its turrets (if available) connecting of oil pipe line. erection of cooling fans, making control cables connection of T/F, bucholz relay etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank and all other associates work for completing of work. Work also includes erection of HV/LV LA and 33 KV CT (2000/1250/1A).

1

-

-

... More
Termination of cable in RTCC & marshaling box transformer relay panel if required with the assurance of proper reflection of parameters in the meters, gauges provided on RTCC, OLTC, Marshaling box, transformer etc.

1

-

-

... More
Earthing of main tank of 63 MVA T/F, T/F Neutral bushing HV and LV side, 120 KV LA & 33 KV CT by using M.S. flat 50x6/ 75x10 mm size, its jointing with already laid earth mat / Deltas, neutral bushing support for its earthing work

1

-

-

... More
Placement of new RTCC panel of this new 63 MVA T/F in control room at 132 KV S/S Talgram including its Termination & fitting and laying of control cable if required as per site requirement and its connections

1

-

-

... More
Jumpering of 63 MVA T/F from HV with single Moose/Zebra/Panther and LV side with Double Zebra/Moose/Panther complete up to 33 KV Main Bus

1

-

-

... More
Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating th T/F oil through PVT. Centrifuging machine and taking the BDV value of the oil periodically till the required value is achieved. Approx. 25 KL

1

-

-

... More
Making hole in part of GI Main/auxiliary structure / cutting of GI angle drilling of hole existing/ defective structure /plate/Angle and grinding machine with all cost of men, T & P etc.

1

-

-

... More
After centrifuging and achieving the desired value of BDV & PPM (as per specification of T/F manufacturer), testing of T/F oil (Dissloved Gas Analysis, Tan Delta, Dielectric Strength & Water content test) is to be done at CPRI lab/before charging of T/F and after charging of T/F. Works includes sample collection, transportation and submission of reports

2

-

-

... More
Getting the NOC from Electrical safety office by submission of required fee decide by Electrical safety office

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.