Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Civil And Construction
Eprocure
Opening Date14 Feb 2024
Closing Date5 Mar 2024
Tender Amount₹ 59,06,378 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Levelling and dressing and making proper slopes including cutting and filling of earth upto a depth 100mm if so required including all labour T&P etc. required for proper completion of the work . (CSI No. 4.11)

100

400

4

... More
Concrete with 4cm gauge stone ballast, coarse sand & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.02)

94

547080

5820

... More
Concreting of 40 mm thick RCC trench covers in mild steel frame work with RCC 1:1.5:3 in Cement, coarse sand and 2cm gauge graded hard stone ballast with 3mm thick floating coat of neat cement finish on top of cover complete with all labour, materials and placing the same in proper position at required location of cable trench within the substation area. (CSI No. 5.18)

360

134280

373

... More
Cement concrete with 2cm gauge approved hard stone ballast, coarse sand and cement in proportion of 3:1.5:1 including supply of all materials, labour,side shuttering if required and T&P etc. required for proper completion of work (CSI No. 5.21)

20

159780

7989

... More
RCC work with cement, approved coarse sand and 2 cm gauge graded approved hard stone ballast like granite quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3 in raft foundation and footings , excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27)

88

774488

8801

... More
RCC work with cement, approved coarse sand and 2 cm gauge graded approved hard stone ballast like granite, quartzite etc from Dalla, Jhansi or other quarries in RCC pile caping, gantry walls/column foundations and RCC pedestals but in the proportion 1:1.5:3. excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P . (CSI No. 5.28)

68

617168

9076

... More
First class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work (CSI No. 6.03)

93

504060

5420

... More
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (CSI No. 9.01)

1.25

123830

99064

... More
TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor) (CSI No. 9.03)

9.5

836646

88068

... More
Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work(CSI No. 9.12)

192

120960

630

... More
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14)

232

94192

406

... More
Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15)

232

11832

51

... More
Fixing and grouting 28 mm and above dia bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . (CSI No. 9.13)

192

12480

65

... More
Providing M.S. Frames work, rack etc for R.C.C. Trench covers and edging with M.S. angles and M.S reinforcement including cutting, bending and welding as per approved drawing. The rate is including cost of all labour, materials etc. as required for proper completion of the work. (CSI No. 9.20)

10.8

1041141

96402

... More
S/F in position 90 lbs M.S. Rail for transformer plinth including cost of all labour, material and T&P etc. required for proper completion of the work. (CSI No. 9.26)

10

45020

4502

... More
Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (CSI No. 9.30)

830

10790

13

... More
Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (CSI No. 9.31)

10

2710

271

... More
Placing of template for auxiliary structure. (labour rate only). (CSI No. 9.32)

50

8400

168

... More
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (CSI No. 9.33)

1120

12320

11

... More
12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07)

395

78210

198

... More
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)

50

450

9

... More
2.5 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and including 7.5 cm thick base concrete consisting of cement, coarse sand and 4cm gauge I class brick ballast in the proportion of 1:6:12 and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work without base CC (CSI No. 12.02)

280

78680

281

... More
Painting or varnishing new iron work in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mix paint "Luxol" or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01)

125

9625

77

... More
As in item 13.01 above but for every coat after first coat. (CSI No. 13.02)

125

4500

36

... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metres. (CSI No. 15.01)

5

2915

583

... More
Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-Incharge within a distance of 60 metres. (CSI No. 15.03)

42.5

54952

1293

... More
Dismantling of existing R.C.C. Gantry/ Auxiliary foundation with the help of mechanical means in switchyard including disposal of refuse/ debris as per direction of Engineer - in - charge. Including all labour and T&P etc. required for proper completion of the work. (CSI No. 15.15)

72

150264

2087

... More
First class bricks on edge floor laid dry, joints sand filled, including preparation of base to proper slope and its ramming including supply of all material labour & T&P etc. required for proper completion of the work. (CSI No. 12.07)

120

69960

583

... More
Laying cement concrete road slab consisting of 1 part cement 2part approved coarse sand and 4 part approved 20mm down graded stone aggregate over prepared sub grade after its rectification and bringing it to proper camber and shape,finishing with TRIMIX machine ,concrete hardner and making good to the satisfaction of E/I inclduing cost of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.12)

25

218275

8731

... More
Providing and fixing 12mm thick particle board of commercial quality 125 mm deep for making partitions of C.C. road slab as per direction of E/I. including cost of all material, labour and T&P required for proper completion of work. (CSI No. 18.15)

45

8055

179

... More
Disposal of rubbish / debris out side the UPPCL area as per direction of Er/in- charge including cartage, labour and materials, T&P etc. required for proper completion of the work. (No. deduction for voids shall be made). (CSI No. 20.16)

111

41514

374



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.