If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date23 Dec 2023
Closing Date18 Jan 2024
Tender Amount₹ 18,42,270 
Notes
Download

Costs

Summary

Civil Construction Works For Energisation Of Unusable 132kv Bus Bar Ii At 132 Kv Ss Zamania Ghazipur

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Levelling and dressing and making proper slopes including cutting and filling of earth upto a depth 100mm if so required including all labour T&P etc. required for proper completion of the work . (CSI No. 4.11)

500

2000

4

... More
Concrete with 4cm gauge stone ballast, coarse sand & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.02)

40

232800

5820

... More
Concreting of 40 mm thick RCC trench covers in mild steel frame work with RCC 1:1.5:3 in Cement, coarse sand and 2cm gauge graded hard stone ballast with 3mm thick floating coat of neat cement finish on top of cover complete with all labour, materials and placing the same in proper position at required location of cable trench within the substation area. (CSI No. 5.18)

30

11190

373

... More
Cement concrete with 2cm gauge approved hard stone ballast, coarse sand and cement in proportion of 3:1.5:1 including supply of all materials, labour,side shuttering if required and T&P etc. required for proper completion of work (CSI No. 5.21)

18

143802

7989

... More
Same as above CSI No. 5.23 but for Raft foundation. (CSI No. 5.27)

27

237627

8801

... More
Same as item no 5.15a in RCC pile caping, gantry walls/column foundations and RCC pedestals but in the proportion 1:1.5:3. (CSI No. 5.28)

2.3

20874

9076

... More
First class brick (class-150) work in 1:6 cement and coarse sand (F.M.1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01)

18

106650

5925

... More
First class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work (CSI No. 6.03)

37

226514

6122

... More
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (CSI No. 9.01)

2.78

275397

99064

... More
TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor) (CSI No. 9.03)

0.75

66051

88068

... More
Providing and Fixing barbed iron wire fencing including stretching, fixing into the post including all labour, materials and T&P required for proper completion of work. the weight of hot dipped GI barbed wire having 12 SWG - 2 ply wires and 4 point ordinary barbs @ 150 mm (approx) C/C should be 100 gm per Meter. (CSI No. 9.07)

400

4400

11

... More
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14)

40

16240

406

... More
Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15)

52

2652

51

... More
Providing M.S. Frames work, rack etc for R.C.C. Trench covers and edging with M.S. angles and M.S reinforcement including cutting, bending and welding as per approved drawing. The rate is including cost of all labour, materials etc. as required for proper completion of the work. (CSI No. 9.20)

1.75

168703

96402

... More
S/F 50x50mm, 8 gauge G.I. chain link fencing 1.8 M high including fixing to vertical posts, horizontal runners with 10mm dia. 40mm long bolts, nuts and washers complete with all material, labour and T&P etc. required for proper completion of work. Chain link of 8 gauge shall be galvanized by hot dipped method as per relevant IS Code. (Excluding cost of vertical posts and horizontal runners) (CSI No. 9.23)

150

121050

807

... More
Grouting of vertical or inclined post of pale/chain/security fencing in true level, alignment and in plumb or inclination as required, including cost of all labour, materials and T&P required for proper completion of work. ( Post and concrete for grouting shall be measured separately) (CSI No. 9.28)

30

1680

56

... More
Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (CSI No. 9.30)

200

2600

13

... More
Same in item 9.31 above but for auxiliary structure. (labour rate only). (CSI No. 9.32)

8

1344

168

... More
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (CSI No. 9.33)

300

3300

11

... More
12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07)

487.5

96525

198

... More
6 mm. thick plaster with 1:3 cement & coarse sand including labour, materials & T&P etc. required for proper completion of the work. (CSI No. 11.17)

22

3828

174

... More
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)

419

3771

9

... More
3 mm thick floating coat of neat cement finish including supply of all materials, labour and T&P etc. required for proper completion of the work. (cement consumtion 0.044 bag/Sqm) (CSI 11.20)

241

5061

21

... More
As in item No. 12.04 above but 4.0 cm thick floor in 1:1.5:3 concrete with out base concrete. (CSI No. 12.28)

31

23777

767

... More
Painting or varnishing new iron work in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mix paint "Luxol" or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01)

236

18172

77

... More
As in item 13.01 above but for every coat after first coat. (CSI No. 13.02)

236

8496

36

... More
Disposal of rubbish / debris out side the UPPCL area as per direction of Er/in- charge including cartage, labour and materials, T&P etc. required for proper completion of the work. (No. deduction for voids shall be made). (CSI No. 20.16)

10

3740

374



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.