Uttar Pradesh Power Transmission Corporation Limited Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Eprocure
Opening Date20 Feb 2025
Closing Date3 Mar 2025
Tender Amount₹ 15,53,000 
Notes
Download

Costs

Summary

Work

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P.G Clamp ACSR Moose to Moose conductor

24

-

-

... More
Spacer for Twin Moose Conductor 02 Bolts, 100 mm spacing made of Aluminium alloy LM-6 complete with nuts,bolts & washers confirming to BIS:5561

100

-

-

... More
Spacer for Twin Panther Conductor 02 Bolts, 100 mm spacing made of Aluminium alloy LM-6 complete with nuts,bolts & washers confirming to BIS:5561

100

-

-

... More
Bolted type Tension fitting for Twin Moose conductor w/o Turn buckle for 132 KV Main Bus Bar suitable for 70 KN Disc Insulator string with 02 No. Tension Clamps made of Al. Alloy LM-6 Yoke Plate,D-Shackle,D-Socket etc. made from Forged Steel etc.

24

-

-

... More
132 kV/220kV Suspension Insulator string and associated hardware fittings with drop clampsuitable for twin moose coductor.

9

-

-

... More
20 MM GI U-Bolt of MS rod having thread on both side complete with washer and spring washer 04 nos. sample confirming to BIS:5561

24

-

-

... More
132 KV P.T Clamp duly made of Aluminium Alloy (LM-6) Suitable for ACSR Panther Conductor complete with bolts, nuts & Washers as per sample Conferming to BIS:5561.

6

-

-

... More
132 KV Isolator Clamp duly made of Aluminium Alloy (LM-6) Suitable for Twin ACSR Panther Conductor complete with bolts, nuts & Washers as per sample

72

-

-

... More
132 KV C.B Clamp duly made of Aluminium Alloy (LM-6) Suitable for Twin ACSR Panther Conductor complete with bolts, nuts & Washers as per sample (Heptacare Make)

30

-

-

... More
132 KV L.A Clamp duly made of Aluminium Alloy (LM-6) Suitable for ACSR Moose Conductor complete with bolts, nuts & Washers as per sample Conferming to BIS:5561.

24

-

-

... More
Work Part -(B)

-

-

-

... More
Opening of existing jumpers of Twin/Single ACSR Panther/Zebra conductors ( 03 phase ) between Main Bus to 05 No. Line Isolator,03 No. T/F,02 No. P.T,01 No. Section Isolator bay to Main Bus (01 Job for each Bay Jumpers).

11

-

-

... More
De-Stringing & Dismantling of existing 132 KV Main Bus of Single ACSR Zebra conductors after opening of Disc Insulator string & Tension Fitting from Gantry,lowering the Bus Bar conductors including shifting of the old conductor from switchyard to substation store and stacking/placing of same at suitable place at the stores (01 Job for each phase of each section of Bus Bar)

12

-

-

... More
Laying & Re-Stringing of 132 KV Main Bus Bar of Twin ACSR Moose Conductors including Hoisting of Disc Insulator string & Tension Fitting etc. including shifting of the conductors/Materials from store to switchyard (01 Job for each phase of each section of Bus Bar)

12

-

-

... More
Preparing the jumpers of Twin ACSR Panther/Moose conductors (03 phase) and connecting the same between newly laid 132 KV Main Bus Bar to 05 No. Line Isolator,03 No. T/F,02 No. P.T,01 No. Section Isolator bay to Main Bus (01 Job for each Jumper).

11

-

-

... More
Jointing Section of 132 KV Main Bus by ''U'' shaped Twin Jumpers between adjacent bus Section with the help of suitable double P.G Clamp (01 Job for each Jumper)

6

-

-

... More
Dismantling of 145 KV 400-200/1A C.T

6

-

-

... More
Errection of 145 KV 800-400-200/1A C.T

6

-

-

... More
Dismantling of Old Protection Panel

2

-

-

... More
Errection of New Protection Panel

2

-

-

... More
Dismantling of 120 KV Old LA

6

-

-

... More
Erection of 120 KV New LA

6

-

-

... More
Dismentling of 132kV Bus Isolator

1

-

-

... More
Dismentling of Aux. BBL Structure

0.5

-

-

... More
Carriage of Dismentled material from site to store

0.5

-

-

... More
Errection of 145 KV New P.T

6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.