Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date10 Jan 2025
Closing Soon15 Jan 2025
Tender Amount₹ 76,740
Costs
EMD
₹ 1,000Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Replacement Of Old 245 Kv Ct Sct Make Against Found Unsatisfactorily Result Intan Delta Testing At 220kv Fatehpur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_985523_2Tender No
E-T-05/ETD(F)/2024-25Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
220KV Sirathu Bay R-Phase
-
-
-
... More
2220KV Unchahar Bay B-Phase
-
-
-
... More
Safe dismantling of 04Nos. 245KV CT different make at 220KV S/S Fatehpur.The Job includes opening of all jumpers,cutting of earthing strips by gas cutter,opening af all electrical terminations clamp;all nut and bolts.safe 04 dismantling of above CT and shifting to substation store or as per instruction of JE/SDO with the help of suitable capacity of Hydra/Crane.
4
-
-
... More
Proper and Safe erection of 04Nos. 245KV CT of ratio 1000/800/500/1 A at 220KV S/S Fatehpur.The Job includes safe shifting of above CTs from substation store to erection point and fixing on their plinth as 04 per drawing with the help of suitable capacity of Hydra/crane.Tightening of Job all nut and bolts clamp;making hole at the base structure for fixing of bolt & amp;nuts if required.
4
-
-
... More
Proper and safe cable termination on M/S GE T&D make 245KV CT and their CT junction boxes at 220KV S/S Fatehpur.The job includes making necessary 160 required supply and fixing of ferrule of size and no. respectively Nos for each core of cable and its termination with crimping type lugs and all associated work to complete the job satisfacorily.contractor will arrange all required ferrules,labour,lug,cable gland and T&P at his own cost.
160
-
-
... More
Proper & safe duble side earthing of M/S GE T&D make 245KV CT by using 75x10MM 2 MS flat along with by using proper welding and 20 connecting with MS round bat by digging ground.This work also include two coats painting by red oxide primer and then two coats of bus green paint make-Asian/Nerolac/Berger etc.to complete the job satisfactorily.
Note:-Men,material (i.e 75X10mm 2MS Flat), T&P required for completion of job will provided by contractor without any extra cost.
20
-
-
... More
Fabrication of Jumpers of twin zebra conductor by its cutting,bending etc.and fixing of spacers to maintain proper distance between conductor aas per 8 site requirement then it fixing from CT to LSI and Line to CT by tightening of job clamps/connector to complete the job.Contractor will arrange all labour,T&P to complete the job.
8
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%