Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date12 Mar 2024
Closing Date19 Mar 2024
Tender Amount₹ 1,40,81,359
Costs
EMD
₹ 1,41,000Document Cost
₹ 1,770Tender Fee
Refer Documents
Summary
Construction Of Lilo Of 132 Kv Amawan-bachhrawan Line At 132kv Newajganj Raebareli
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_916006_1Bid Award Id
ViewTender No
Short Term E-Tender No. ETC-II/L/93/2023-24Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Check survey & Peg marking
5.09
-
-
Excavation of foundation excluding back filling & leveling
2753.69
-
-
Stub setting-
-
-
-
Stub setting DA type tower
8
-
-
Stub setting DB type tower
2
-
-
Stub setting DC type tower
7
-
-
Installation of steel reinforcement of concrete foundation including cost of steel bars, cuitting, bending & placing etc.
5.04
-
-
Concreting of foundaation including cost of arrangement of form boxes, shoring, shuttering & back filling, curing including the cost of cement, sand & stone ballast etc.
522.89
-
-
PART-B (ERECTION WORKS)
-
-
-
Erection of towers including proper tightening, fixing of number plates, phase plate & danger plates, bird guard etc.
97.11
-
-
Tack welding of bolts & nuts upto 2nd section
5000
-
-
Earthing of tower with pipe type earthing
13
-
-
Laying, stringing, tensioning clamping, jointing etc of ACSR 'Panther' conductor including hoisting of insulator, fitting of all necessary hardware and accessories i.e. Fitting Armour rods, vibraton dampers etc on all six phases of 132 KV DC lines.
5.09
-
-
Laying, stringing, tensioning clamping, jointing including fitting of all nesscory hardware and assessories of OPGW & OFAC, termainaion at S/S , end to end connectivity & testing etc on 132KV Line
18.29
-
-
Dismentling of Exiting earth wire (on line) necessary hardware, reroling earth wire on empty drum of OPGW & safly tranporation of all removed marerial to UPPTCl store etc.
13.2
-
-
PART-C (SUPPLY)
-
-
-
Tower Strub
4.43
-
-
Bolt and nut with washer for stub
82
-
-
Foundation Anchor bolt with washer size 900x28mm
96
-
-
TOWER ACCESSORIES-
-
-
-
Number Plate
19
-
-
Danger Plate
19
-
-
Phase Plate in sets of red, blue and yellow for Tension towers
13
-
-
132KV Pipe type earthing material for towers
13
-
-
Bird guard
48
-
-
PORCELAIN DISC INSULATORS
-
-
-
(i) 70 KN
460
-
-
(ii) 120 KN
1420
-
-
HARDWARE SUITABLE FOR ACSR Panther
-
-
-
Single suspension fittings complete assembly
50
-
-
Single Tension fittings complete assembly
142
-
-
vibration Dampers
230
-
-
Mid Span compression Joint
10
-
-
Repair sleeves
6
-
-
Performed Armour rod
50
-
-
OPGW Supply
-
-
-
Supply of 24 fibre (DWSM) OPGW for optic cable
13.2
-
-
Supply of 48 fibre (DWSM) OPGW for optic cable
5.09
-
-
Supply of installlation of hardware set for 24 fiber OPGW
13.2
-
-
Supply of installlation of hardware set for 48 fiber OPGW
5.09
-
-
Joint Box 24 fibre
5
-
-
Joint Box 48 fibre
2
-
-
FODP 48F
1
-
-
Supply and Installation of hardware set for 48 fibre (DWSM, G652D) fibre optic approach cable
1
-
-
Fibre optic approach cable 48F OPGW
0.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements