Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Civil And Construction
Excavation
Eprocure
Opening Date28 Oct 2024
Closing Date22 Nov 2024
Tender AmountRefer Documents
Costs
EMD
₹ 11,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_969167_1Tender No
E-Tender-15/ETC-II/M/2024Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Tower Accessories
(A) Pipe type earthing material for Tower
2
-
-
OPGW & Accessories
(A) Joint Box (24 fiber)
1
-
-
WORK FOR HEIGHT RAISING WORK AT PAKWARA-DINGARPUR ROAD B/W (TL-29 & 30) AND DHANUPURA-ASMAULI ROAD B/W (TL-45-46) OF 132KV AMROHA-MORADABAD LINE DUE TO GROUND CLEARANCE LESS THAN UPPTCL NORMS UNDER ETD- AMROHA Foundation Work for 132KV Towers
(A) Cost of Excavation of 132kv tower Foundation Pits including all earth work, Backfilling and levelling etc. (As per Annexure-3)
239.65
-
-
(B) Setting of stubs including all foundation work but excluding the cost of concreting and excavation for following 132 KV D/C B type towers :
(1) Setting of Template and Stub 132KV DB Panther
2
-
-
( C) Cost of concreting of all type Tower foundation including cost of cement, dewatering, shorting and shuttering, forming, curring but excluding cost of reinforcement bars. (1:2:4 concreting) (As per Annexure-3)
43.55
-
-
(D) Installation of steel reinforcement bars in R.C.C foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc. (As per Annexure-3)
0.37
-
-
Tower Erection
(A) Erection of Superstructure of 132 KV DC towers and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories but including fitting of danger, number, phase plate, bird guard and fixing & punching for 132KV DC line.
9.65
-
-
(B) Tack welding of all the bolts upto the height of first section of DC towers or 5 mtrs from ground level whichever is higher with three tacks at 1200 seperation of minimum 10mm thickness with 10mm/12mm electrode & application of Zinc rich Aluminium paint on the affected surface including cost of materials and T&P.
600
-
-
(C ) Grounding work including earth work etc for pipe type grounding including cost of coke & salt.
2
-
-
De-Stringing Work
(A) Lowering down of all 03 phase ACSR Panther conductor including de-hoisting of all the necessary hardwares & accessories at Tower No 29-30 & 45-46 or as per site requirements.
2
-
-
(B) De-Stringing of OPGW of tower No 29-30 as per site requirements.
1
-
-
Stringing Work
(A) Laying stringing, tensioning, clamping, cutting, jointing etc. of ACSR Panther conductor and OPGW including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fittings, vibration dampers etc. on three phases of 132 KV SC lines at Tower No 29-30 & 45-46 or as per site requirements.
0.66
-
-
Extra Work (A) Dismantling of old 132KV S/C Towers A+0 type.
3
-
-
(B) Providing and fixing of back stay for safety Purpose at Loc No 29-30 & 45-46 on temproray Basis.
4
-
-
(C ) Carriage of all material as Tower parts, conductor and other balance material etc from JE Store 132KV S/S Amroha to working sites by Private Vechicle. The work also includes Loading and unloading the same. Private vehicle and hydra with all expenses will under scope of contractor.
2
-
-
(D) Carriage of all Dismentled material as Tower parts, old conductor and other balance material etc from working site to JE Store 132KV S/S Amroha by Private Vechicle. The work also includes loading and unloading the same at both ends. Private vehicle and hydra with all expenses will under scope of contractor.
2
-
-
(E) Carriage of required Templates from near by store with in ETC-II Moradabad to working sites by Private Vechicle. The work also includes Loading and unloading the same. Private vehicle and hydra with all expenses will under scope of contractor.
1
-
-