Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Civil And Construction
Eprocure
Opening Date15 Jan 2024
Closing Date12 Feb 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_881276_1Bid Award Id
ViewTender No
E-T-15/ETD/AMROHA/2023-24Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cost of concreting including cost of cement, dewatering, shoring and shuttering, forming, curring but excluding cost of reinforcement bars. (1:2:4 concreting)
2
-
-
Providing and fixing of 5inch dia. Thickness 12mm PVC pipe on tower parts including safe cutting, binding, jointing etc. (Approx 15mtr)
20
-
-
Breaking of chimney of size 450X450mm at least 1.5m below ground level and 300mm above ground level of different tower locations mentioned below. The work includes proper cleaning of stub with hard wire brush to remove complete concrete from the surface at stub then making holes in the stub (with the help of magnate based electric drill machine) and fixing additional galvanized angel size 130X130X10mm and 110X110X8mm at least both 1000mm long with nut and bolts and then painting of welded portion with zinc rich primer and then making of chimney of proper size with 1:2:4 cement concrete with 20mm stone granite with proper curing for 7days and all other associated works to complete the job satisfactorily including cost of all material, labor, generator, drill machine T&P etc. but excluding cost of MS angels and N&Bs which shall be provided by department. (Location No. 18 & 90)
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements