Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Eprocure
Opening Date13 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 6,40,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Replacement of Gasket and attending oil leakage of 40 MVA T/F-I (M/s Accurate make) and 40 MVA T/F-II (M/s Aditya make) installed at 132 KV S/S Aurai under ETD-IV, Varanasi.
Replacement of Gasket and attending oil leakage of 40 MVA T/F-I (M/s Accurate make) and 40 MVA T/F-II (M/s Aditya make) installed at 132 KV S/S Aurai under ETD-IV, Varanasi.
Replacement of Gasket and attending oil leakage of 40 MVA T/F-I (M/s Accurate make) and 40 MVA T/F-II (M/s Aditya make) installed at 132 KV S/S Aurai under ETD-IV, Varanasi.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Complete drain out of TRANSFORMER oil from the existing 40 MVA TRANSFORMER- I into empty oil drums/oil tanker and storage of oil drums at stores/designated place for storage.

1

-

-

... More
Replacement of all the gaskets & attending oil leakage including the top cover, Bushing, inspection cover, conservator radiator, and valves etc. of TRANSFORMER by providing and fixing of new gaskets as per existing size made of rubberized cork sheet Kotika/Turboze/Nu cork brand grade 07 after due fabrication.

1

-

-

... More
Cleaning of Core and winding by TRANSFORMER oil and removal of slug from bottom of the main tank.

1

-

-

... More
Applying vacuum to above TRANSFORMER up to 760 mm of Hg for 24 Hrs. with adequate capacity vacuum pumps after necessary blanking/erection as per requirement.

1

-

-

... More
Filling of dry Nitrogen gas having Dew Point(-)60 C to (-)65 C under vaccum from top value of the TRANSFORMER upto pressure of 3PSI and maintaining the same in the main tank for 12 Hrs including cost of Nitrogen gas and nitrogen gas filling device.

1

-

-

... More
Creating the Vacuum inside the Main tank for period for 12 Hrs. and filling of centrifuged new TRANSFORMER oil in main tank of required BDV after preparation in 20 KL oil tanker.

1

-

-

... More
Complete, erection of 40 MVA TRANSFORMER including radiator, conservator tank, bushing with its turrets alongwith connecting of all oil pipe line, erection of cooling fans making control cables connection, buchhloz relay etc. For completing the work, topping up of TRANSFORMER oil and final oil filling in the tank, radiator, conservator tank and final oil filling in tank, radiator, conservator tank and all other associates.

1

-

-

... More
Centrifuging of following TRANSFORMER oil in TRANSFORMER tank or oil tanker by connecting centrifuging pipes, circulating the TRANSFORMER oil through centrifuging machine and taking BDV values of the oil periodically till the required value achieved as per direction of supervising engineer and also measurement of PPM, all labour, T&P, centrifuging machine shall be provided by contractor at his own cost.

20500

-

-

... More
Carriage of 20 KL empty oil tank for the centrifuging of TRANSFORMER oil where it is available within distance of 100 km Approx.

1

-

-

... More
Conducting BDV, PPM and DGA tests of transformer oil of 40 MVA T/F job includes sample collection of T/F oil in suitable container and its transportation to NABL certified LAB and submitting its test report. First job after completion of work and second job after charging of 15 days.

1

-

-

... More
Following work is to be carried out for replacement of gaskets including other associated work for 132/33 KV, 40 MVA TRANSFORMER-II (Aditya Vidyut make mfg year 2006) at 132 KV S/S Aurai with all cost of men, Materials, T&P as per technical specifications for proper completion of the work with due safety & precautions as per direction of the supervising Engineer.

-

-

-

... More
Opening of jumpers of HV/LV side, removal of earthing strip from neutral bushing.

1

-

-

... More
Dismantling of 40 MVA TRANSFORMER-II accessories including radiator, bushing, bucholz relay, oil pipe line from conservator tank to main tank, oil pipe line to OLTC and surge relay conservator tank.

1

-

-

... More
Complete drain out of TRANSFORMER oil from the existing 40 MVA TRANSFORMER- II into empty oil drums/oil tanker and storage of oil drums at stores/designated place for storage.

1

-

-

... More
Replacement of all the gaskets & attending oil leakage including the top cover, Bushing, inspection cover, conservator radiator, and valves etc. of TRANSFORMER by providing and fixing of new gaskets as per existing size made of rubberized cork sheet Kotika/Turboze/Nu cork brand grade 07 after due fabrication.

1

-

-

... More
Cleaning of Core and winding by TRANSFORMER oil and removal of slug from bottom of the main tank.

1

-

-

... More
Applying vacuum to above TRANSFORMER up to 760 mm of Hg for 24 Hrs. with adequate capacity vacuum pumps after necessary blanking/erection as per requirement.

1

-

-

... More
Filling of dry Nitrogen gas having Dew Point(-)60 C to (-)65 C under vaccum from top value of the TRANSFORMER upto pressure of 3PSI and maintaining the same in the main tank for 12 Hrs including cost of Nitrogen gas and nitrogen gas filling device.

1

-

-

... More
Creating the Vacuum inside the Main tank for period for 12 Hrs. and filling of centrifuged new TRANSFORMER oil in main tank of required BDV after preparation in 20 KL oil tanker.

1

-

-

... More
Complete, erection of 40 MVA TRANSFORMER including radiator, conservator tank, bushing with its turrets alongwith connecting of all oil pipe line, erection of cooling fans making control cables connection, buchhloz relay etc. For completing the work, topping up of TRANSFORMER oil and final oil filling in the tank, radiator, conservator tank and final oil filling in tank, radiator, conservator tank and all other associates.

1

-

-

... More
Centrifuging of following TRANSFORMER oil in TRANSFORMER tank or oil tanker by connecting centrifuging pipes, circulating the TRANSFORMER oil through centrifuging machine and taking BDV values of the oil periodically till the required value achieved as per direction of supervising engineer and also measurement of PPM, all labour, T&P, centrifuging machine shall be provided by contractor at his own cost.

20500

-

-

... More
Carriage of 20 KL empty oil tank for the centrifuging of TRANSFORMER oil where it is available within distance of 100 km Approx.

1

-

-

... More
Conducting BDV, PPM and DGA tests of transformer oil of 40 MVA T/F job includes sample collection of T/F oil in suitable container and its transportation to NABL certified LAB and submitting its test report. First job after completion of work and second job after charging of 15 days.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.