Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Eprocure
Opening Date22 May 2024
Closing DateCancelled
Tender Amount₹ 1,99,275
Costs
EMD
₹ 2,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_911759_4Tender No
152-ETC-I(A)/ 2023-2024Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Replacement of Gasket for attending the leakage of 40 MVA Transformer-I at 132 KV Substation Bindki, under Electy. Trans. Division-Fatehpur.
BOQ Items
Replacement of all gasket of T/F including top cover by providing and fixing of new gasket as per existing size made of rubberized cork sheet kotika turboze/ cork brand grade 07. All man power, T&P and required material and glass for indicator will be arrange by contractor at his own cost for satisfactorily completion of work. Creating vacuum inside main tank for period of 12hrs and filling of centrifusing oil topup to core, tank, radiator and winding conservator etc.
1
-
-
Complete Erection of 40 MVA T/F-I including all accessories like bushing, conservator tank, radiator, buchholz relay, oil pipe line to OLTC surge relay etc and any required work for satisfactorily completion of work. This job also includes opening and fixing of jumpers All man power, T&P and required material will be arrange by contractor at his own cost for satisfactorily completion of work.
1
-
-
Centrifuging of complete transformer oil of 40MVA T/F-I by connecting centrifuging pipe, circulating the transformer oil through centrifuging machine to be provided by the contractor and taking the BDV Value periodically till the required value is achieved as per direction of supervising engineer, with all associated work to complete the work satisfactorily. All man power, T&P and required material will be arrange by contractor at his own cost.
19430
-
-
Carriage and Shifting of oil tank 20KL including loading at 220 KV Substation Malwan and unloading at working site of 132 KV Substation Bindki and after completion of work above oil tank must be Carriage and shifted to 220 KV Substation Malwan Store.
1
-
-
Testing of centrifuge T/F oil (DGA, PPM, BDV) of 40 MVA-II at 132 KV Substation Malwan from approvel NABL Lab.
1
-
-
Overhauling after rewinding of burnt motor of 3-phase, 415 V, 50Hz cooling fans of 40 MVA T/F-I & II at 132 KV S/S Bindki under ETD- Fatehpur by suitable size of good quality super enamelled copper wire, for strengthening of motor shaft, replacement of all 7 Nos. damaged bearing of T/F cooling fan by new one as per requirement. This job also includes dismantling, Carriage, Erection and proper connection of cooling fan at respective site. All man power, T&P and required material will be arrange by contractor at his own cost for satisfactorily completion of work.
7
-
-