If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Jal Vidyut Nigam Limited - UPJVN Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date28 Aug 2024
Closing Date27 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Annual Maintenance Of Unit Number 2 5 And 6 At Rihand Power Station Pipri 1 Overhauling Cleaning And Repairing Of Generator Air Cooler And Painting Of Inner And Outer Surface Of Generators Of Above Three Units Varnishing Of Stator And Rotor Poles

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Painting of inner and outer surface of generator of M/c. No. 2, 5&6. SCOPE OF WORK AS PER BID DOCUMENT

1388.52

-

-

... More
Part B – Varnishing of stator and rotor poles after proper cleaning with acetone of Unit No. 2, 5&6.

-

-

-

... More
Dismantling of all cover plates, Chequered Plates, railing, dome, Slip ring bracket, armature of main exciters, top & bottom baffle plates, upper bracket etc. after their proper marking and keeping them in systematic manner.

3

-

-

... More
Rotation of rotor by making arrangement for inspection of stator. Jacking of the Machine shall be done every time before starting rotation by jacking machine.

3

-

-

... More
Thoroughly cleaning of stator core and coils, surge supporting rings, ventilating ducts etc by compressed air then with the cloths dipped into acetone to remove all traces of oil, grease, carbon duct etc.

3

-

-

... More
Thoroughly cleaning of all rotor poles and their terminals with cloths dipped into acetone to remove all traces of oil, grease carbon dusts etc.

3

-

-

... More
Varnishing of stator core with Dr. Beck make Bectrol gray varnish by spray gun and oxygen gas used as a compressed air to avoid any moisture content in the air during spraying.

3

-

-

... More
Varnishing of overhang portion of stator coils, surge rings etc with Dr. Beck make red gel epoxy varnish by spray gun oxygen gas used as a compresses air to avoid any moisture content in the air during spraying.

3

-

-

... More
Varnishing of all sides of rotor except towards rotor core, with Dr. Beck make red get epoxy varnish by spray gun and oxygen gas used as a compressed air to avoid and any moisture content in the air during spraying.

3

-

-

... More
Assembly of all dismantled cover plates, chequred plate, railing, PMG, dome, slip ring bracket, main exciter, top & bottom baffle plates, upper bracket etc. with replacement of damage nuts, bolts with new HT nuts & bolts. For proper tightening whenever required, tapping shall be done of the damage holes.

3

-

-

... More
Consumable materials for above said work as per scope of work mentioned in Bid Document

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.