Uttar Pradesh Housing And Development Board Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Housing And Development Board - UPAVP Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Mar 2024
Closing Date27 May 2024
Tender Amount₹ 6,30,60,000 
Notes
Download

Costs

Summary

Construction Of The 24.00 M., 18.00 M. And 9.00 M. Wide Road In Sector-9 Avadh Vihar Yojana , Lucknow

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub Base providing ,Laying and spreading material on a prepared sub base cement @ 2% by weight to spreading material manually mixing in place with rotavater and copacting with the road roller at OMC tp achieve the desired unconfinef compressive strength and to from a layer of sub-base. .

2113.47

8939978

4230

... More
WMM providing ,Laying and spreading material on a prepared sub base cement @ 4% by weight to spreading material manually mixing in place with rotavater and achieve the desired unconfinef compressive strength and to from a layer of base. .

1207.7

5449142

4512

... More
Brick on Edge in Both Side of Road as per direction of E/I S.I.21 (Morth -11.15)

2875.48

258793

90

... More
Providing & laying spreading and compacting graded stone aggregate to wet mix macadam specification including premix the material with water at OMC in mechanical mix plant carrige of mixed material by tipper to site, laying in uniform layer with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

1006.42

4279297

4252

... More
Providing and applying primer coat with 60/70 bitumen emulsion on prepared surface of granular base including cleaning the road surface and spraying primer at the rate of 0.60 kg/sqm. Using mechanical means including supply of all materials, labour, T & P etc. required for proper completion of the work as per clause 502 of MOSRT&H specifications and as per direction of the E/I.

10064.18

281797

28

... More
Dence Graded Bituminous Macadem Providing and laying Dence Graded BITUMINOUS Macadem with HOT MIX 100-120 TPH hot mix plant producing an average output of 75 tons per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.50% Weight of total mix and filler , transporting the hot mix to work site,laying with hydrostatic paver finisher with sensor controller to required grade level & alignment & roller with smooth wheeled vibratoryand tandem rollers to achieved the desired compaction complete in all respects & as per relevant clauses of MORTH & H section -507 (VG-30)

603.85

5763748

9545

... More
Tack Coat Providing and applying tack coat with 60/70 bitumen emulsion using emulsion pressure distributor at the rate of 0.25kg. Per sqm. On the prepared bitumeneous/granular surface cleaned with mechanical broom including supply of all materials, labour, T & P etc. required for proper completion of the work as per clause 503 of MORT&H specification and as per direction of the E/I.

10064.18

169581

16.85

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type HMP Producing an average output of 75 tone per hour using crush aggregates of specified grading, premixed with bituminous binder @4.5 to 5.0% of mix filler, transporting the hot mix to work site, taking with hydros paver finisher with sensor control to the required grade, level alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the diesired compaction as per MORT&H specification clause 509 complete in all respect (MORT&H specification No. 509) (VG-30)

402.56

4234931

10520

... More
Abstract of Cost of the 18.00 M. wide Road in Sector-9 Avadh Vihar Yojana , Lucknow

-

-

-

... More
Dagbelling 15 cm. (6")deep in one line aligned, with flags and jhandies as directed by Engineer in charge. Dag belling shall be two each for each painted surface.

949.12

2847

3

... More
Excavation for Roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto distance of 100 m cartage lead 50 m ramming bottom and side slop etc for carrying of cut earth to embankments site with lifts upto 1.50 m and lead upto 50.00 m as per technical specification Clauser 302.3 S.I.16 (Morth 301(3.3)

5391

345024

64

... More
Laying and spreading available soil in the subgrade on a prepared surface pulverising,mixing the spread soil in a place with rotavator with 3.00% slaked lime having minimum content of 70% cab grating with mortor grader and compacting with mortor grading with theroad roller at OMC to the desired density to form a layer of improved subfrade

1048.78

711072

678

... More
Granular Sub Base providing ,Laying and spreading material on a prepared sub base cement @ 2% by weight to spreading material manually mixing in place with rotavater and copacting with the road roller at OMC tp achieve the desired unconfinef compressive strength and to from a layer of sub-base. .

697.6

2950848

4230

... More
WMM providing ,Laying and spreading material on a prepared sub base cement @ 4% by weight to spreading material manually mixing in place with rotavater and achieve the desired unconfinef compressive strength and to from a layer of base. .

398.63

1798618

4512

... More
Brick on Edge in Both Side of Road as per direction of E/I S.I.21 (Morth -11.15)

949.12

85420

90

... More
Providing & laying spreading and compacting graded stone aggregate to wet mix macadam specification including premix the material with water at OMC in mechanical mix plant carrige of mixed material by tipper to site, laying in uniform layer with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

332.19

1412471

4252

... More
Providing and applying primer coat with 60/70 bitumen emulsion on prepared surface of granular base including cleaning the road surface and spraying primer at the rate of 0.60 kg/sqm. Using mechanical means including supply of all materials, labour, T & P etc. required for proper completion of the work as per clause 502 of MOSRT&H specifications and as per direction of the E/I.

3321.92

93013

28

... More
Dence Graded Bituminous Macadem Providing and laying Dence Graded BITUMINOUS Macadem with HOT MIX 100-120 TPH hot mix plant producing an average output of 75 tons per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.50% Weight of total mix and filler , transporting the hot mix to work site,laying with hydrostatic paver finisher with sensor controller to required grade level & alignment & roller with smooth wheeled vibratoryand tandem rollers to achieved the desired compaction complete in all respects & as per relevant clauses of MORTH & H section -507 (VG-30)

132.88

1268339

9545

... More
Tack Coat Providing and applying tack coat with 60/70 bitumen emulsion using emulsion pressure distributor at the rate of 0.25kg. Per sqm. On the prepared bitumeneous/granular surface cleaned with mechanical broom including supply of all materials, labour, T & P etc. required for proper completion of the work as per clause 503 of MORT&H specification and as per direction of the E/I.

3321.92

55974

16.85

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type HMP Producing an average output of 75 tone per hour using crush aggregates of specified grading, premixed with bituminous binder @4.5 to 5.0% of mix filler, transporting the hot mix to work site, taking with hydros paver finisher with sensor control to the required grade, level alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the diesired compaction as per MORT&H specification clause 509 complete in all respect (MORT&H specification No. 509) (VG-30)

83.05

873686

10520

... More
Abstract of Cost of the 12.00 M. wide Road in Sector-9 Avadh Vihar Yojana , Lucknow

-

-

-

... More
Dagbelling 15 cm. (6")deep in one line aligned, with flags and jhandies as directed by Engineer in charge. Dag belling shall be two each for each painted surface.

1216

3648

3

... More
Excavation for Roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto distance of 100 m cartage lead 50 m ramming bottom and side slop etc for carrying of cut earth to embankments site with lifts upto 1.50 m and lead upto 50.00 m as per technical specification Clauser 302.3 S.I.16 (Morth 301(3.3)

4189.12

268103

64

... More
Laying and spreading available soil in the subgrade on a prepared surface pulverising,mixing the spread soil in a place with rotavator with 3.00% slaked lime having minimum content of 70% cab grating with mortor grader and compacting with mortor grading with theroad roller at OMC to the desired density to form a layer of improved subfrade

577.6

391612

678

... More
Granular Sub Base providing ,Laying and spreading material on a prepared sub base cement @ 2% by weight to spreading material manually mixing in place with rotavater and copacting with the road roller at OMC tp achieve the desired unconfinef compressive strength and to from a layer of sub-base. .

577.6

2443248

4230

... More
WMM providing ,Laying and spreading material on a prepared sub base cement @ 4% by weight to spreading material manually mixing in place with rotavater and achieve the desired unconfinef compressive strength and to from a layer of base. .

328.32

1481379

4512

... More
Brick on Edge in Both Side of Road as per direction of E/I S.I.21 (Morth -11.15)

1216

109440

90

... More
Providing & laying spreading and compacting graded stone aggregate to wet mix macadam specification including premix the material with water at OMC in mechanical mix plant carrige of mixed material by tipper to site, laying in uniform layer with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

273.6

1163347

4252

... More
Providing and applying primer coat with 60/70 bitumen emulsion on prepared surface of granular base including cleaning the road surface and spraying primer at the rate of 0.60 kg/sqm. Using mechanical means including supply of all materials, labour, T & P etc. required for proper completion of the work as per clause 502 of MOSRT&H specifications and as per direction of the E/I.

2736

76608

28

... More
Dence Graded Bituminous Macadem Providing and laying Dence Graded BITUMINOUS Macadem with HOT MIX 100-120 TPH hot mix plant producing an average output of 75 tons per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.50% Weight of total mix and filler , transporting the hot mix to work site,laying with hydrostatic paver finisher with sensor controller to required grade level & alignment & roller with smooth wheeled vibratoryand tandem rollers to achieved the desired compaction complete in all respects & as per relevant clauses of MORTH & H section -507 (VG-30)

109.44

1044604

9545

... More
Tack Coat Providing and applying tack coat with 60/70 bitumen emulsion using emulsion pressure distributor at the rate of 0.25kg. Per sqm. On the prepared bitumeneous/granular surface cleaned with mechanical broom including supply of all materials, labour, T & P etc. required for proper completion of the work as per clause 503 of MORT&H specification and as per direction of the E/I.

2736

46101

16.85

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type HMP Producing an average output of 75 tone per hour using crush aggregates of specified grading, premixed with bituminous binder @4.5 to 5.0% of mix filler, transporting the hot mix to work site, taking with hydros paver finisher with sensor control to the required grade, level alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the diesired compaction as per MORT&H specification clause 509 complete in all respect (MORT&H specification No. 509) (VG-30)

68.4

719568

10520



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.